Dockets

Docket Number: NEPR-MI-2023-0001
In Re: Wheeling Implementation
Available files: 90
Files Date Orden Download
Motion in Compliance with Order of December 9, 2024 Subject: IN RE: Wheeling Implementation December/23/2024 2024/12/23 File
Resolution and Order Subject: Revised Wheeling Services Agreement and Computation of Annual and Hourly Energy Imbalance Charges. December/09/2024 2024/12/09 File
Resolution and Order Subject: Resolution and Order to Motion to Request to Add LUMA Email Address to Notices. November/25/2024 2024/11/25 File
Motion to Submit LUMA’s Wheeling Implementation Report for Fiscal Year 2024 Subject: IN RE: Wheeling Implementation October/28/2024 2024/10/28 File
Resolution and Order Subject: Response to LUMA’s Motion for Partial Reconsideration and Request for Further Process. April/24/2024 2024/04/24 File
Motion Submitting Information and Responses to Comments Filed by Stakeholders Subject: Motion Submitting Information and Responses to Comments Filed by Stakeholders. April/05/2024 2024/04/05 File
Resolution Subject: Resolution on Request for Ruling Deeming LUMA’s Motion for Reconsideration Granted in Part and Vacate in Portions of the Final Resolution and Order, and Request to […] April/01/2024 2024/04/01 File
Request for Ruling Deeming LUMA’S Motion for Reconsideration Granted in Par and Vacate Portions of the Final Resolution and Order, and Request to be Heard in Connection with Comments filed by Stakeholders at the Motion for Reconsideration Stage Subject: Request for Ruling Deeming LUMA’S Motion for Reconsideration Granted in Par and Vacate Portions of the Final Resolution and Order, and Request to be Heard in […] March/21/2024 2024/03/21 File
Moción para someter comentarios Subject: Comentarios Marahu Solar, LLC a solicitud de respuestas de las partes interesadas sobre la Moción de Reconsideración Parcial y Solicitud de Proceso Adicional de LUMA. March/15/2024 2024/03/15 File
Comentarios de la Alianza de Justicia Energética a Solicitud de Respuestas por Partes Interesadas sobre el Wheeling en Respuesta a la Resolución del NEPR emitida el 23 de febrero de 2024 Subject: Comentarios de la Alianza de Justicia Energética a Solicitud de Respuestas por Partes Interesadas sobre el Wheeling en Respuesta a la Resolución del NEPR emitida el […] March/15/2024 2024/03/15 File
Comentarios de Circon Energy LLC Subject: Comentarios de Circon Energy LLC March/15/2024 2024/03/15 File
Comentarios De La Oficina Independiente de Protección al Consumidor en Cumplimiento con Resolución y Orden del 23 de febrero de 2024 Subject: Comentarios De La Oficina Independiente de Protección al Consumidor en Cumplimiento con Resolución y Orden del 23 de febrero de 2024. March/15/2024 2024/03/15 File
Phoebus response on LUMA’s Motion for Partial Reconsideration and Request for Further Process Subject: Phoebus response on LUMA’s Motion for Partial Reconsideration and Request for Further Process March/01/2024 2024/03/01 File
Resolution Subject: Requesting responses from stakeholders on LUMA’s Motion for Partial Reconsideration and Request for Further Process. February/23/2024 2024/02/23 File
Submission of Response to Request for Information Issued in Resolution and Order of January 22, 2024 and Reservation of Rights in Connection with Partial Motion for Reconsideration Subject: Reponse to Request of Information and Reservation of Rights February/23/2024 2024/02/23 File
Resolution Subject: Resolution about Motion for Partial Reconsideration of Final Resolution and Order of January 22, 2024 and Request for Further Processes, filed by LUMA Energy, LLC and […] February/22/2024 2024/02/22 File
Submission of Revised Wheeling Services Agreement in Compliance with Resolutions and Orders of January 22, 2024 and February 2, 2024 and Reservation of Rights  Subject: Submission of Revised Wheeling Services Agreement February/12/2024 2024/02/12 File
Motion for Partial Reconsideration of Final Resolution and Order of January 22, 2024 and Request for Further Process Subject: Motion for Partial Reconsideration and Request for Further Process February/12/2024 2024/02/12 File
Resolution and Order Subject: Resolution and Order about to Request to Stay or Extended the Deadline to Submit the Final Wheeling Services Agreement, filed by LUMA Energy, LLC and LUMA […] February/02/2024 2024/02/02 File
Request to Stay or Extend the Deadline to Submit the Final Wheeling Services Agreement Subject: Request Regarding Deadline to Submit the Final Wheeling Services Agreement. February/01/2024 2024/02/01 File
Final Resolution and Order Subject: Final Resolution and Order Approving Wheeling Services Agreement, Wheeling Services Agreement Application Form, and Non-refundable Fee. January/22/2024 2024/01/22 File
Phoebus Final Comments and Response to Attachment of November 15, 2023, Resolution and Order  Subject: Phoebus Response to LUMA’s December 28 Motion January/08/2024 2024/01/08 File
Motion Submitting Updated Wheeling Implementation Costs, Proposed RES Charge, Responses to Feedback by Stakeholders on Updated WSA, LUMA’s position on Circon’s Proposed WSA, and Request for Confidentiality Subject: Updated Wheeling Implementation Costs, Proposed RES Charge, Responses to Feedback by Stakeholders on Updated WSA, LUMA’s position on Circon’s Proposed WSA, and Request for Confidentiality December/28/2023 2023/12/28 File
Comentarios sobre la versión actualizada del “Wheeling Service Agreement”- Asociación de Industriales Subject: Comentarios sobre la versión actualizada del “Wheeling Service Agreement”- Asociación de Industriales de Puerto Rico December/01/2023 2023/12/01 File
Phoebus Fund Puerto Rico, LLC Final Comment and Response to Attachment of November 15, 2023, Resolution and Order Subject: Phoebus Fund Puerto Rico, LLC Final Comment and Response to Attachment of November 15, 2023, Resolution and Order November/30/2023 2023/11/30 File
LUMA-Motion Submitting LUMA’s Responses to Second Requirement for Information on Energy Imbalance Charge Subject: Submission in Compliance with  Second Requirement for Information of November 15, 2023 November/30/2023 2023/11/30 File
ICPO’s Comments to CIRCON’s WSA and Phoebus’ Comments Subject: ICPO’s Comments to CIRCON’s WSA and Phoebus’ Comments November/30/2023 2023/11/30 File
Comentarios Marahu Solar, LLC Subject: Comentarios Marahu Solar, LLC November/30/2023 2023/11/30 File
Comments Circon Energy, LLC Subject: Comments Circon Energy, LLC November/30/2023 2023/11/30 File
ICPO’s Comments to Attachment of November 15, 2023, Resolution and Order Subject: ICPO’s Comments to Attachment of November 15, 2023, Resolution and Order November/27/2023 2023/11/27 File
Resolution and Order Subject: Second Requirement of Information (“RO!”) -Energy Imbalance Charges November/15/2023 2023/11/15 File
Resolution and Order Subject: Completion of Stakeholder Collaboration Process and Submittal of Final Comments by Stakeholders October/24/2023 2023/10/24 File
Motion Submitting Updated Wheeling Services Agreement, LUMA’s Responses to Comments by Stakeholders, and Information on Progress of Wheeling Implementation Timeline Subject: Motion Submitting Updated Wheeling Services Agreement, LUMA’s Responses to Comments by Stakeholders, and Information on Progress of Wheeling Implementation Timeline October/18/2023 2023/10/18 File
Notice of Withdrawal of Attorney of Record Subject: Notice of Withdrawal of Attorney of Record October/10/2023 2023/10/10 File
Independent Monitor’s Final Report Subject: Independent Monitor’s Final Report October/02/2023 2023/10/02 File
Request for an Extension of Time to File Independent Monitor’s Final Report Subject: Independent Monitor’s Final Report September/27/2023 2023/09/27 File
Motion on Deadline to Submit Revised Wheeling Services Agreement Subject: Deadline to Submit Revised Wheeling Services Agreement September/27/2023 2023/09/27 File
Phoebus’ Final Position Paper Wheeling Services Agreement Stakeholder Collaboration Period Subject: Phoebus’ Final Position Paper Wheeling Services Agreement Stakeholder Collaboration Period September/26/2023 2023/09/26 File
Sixth Independent Monitor Report Subject: Sixth Independent Monitor Report September/22/2023 2023/09/22 File
Resolution and Order Subject: Comments on Wheeling, Draft Wheeling Services Agreement and Request for Confidential Treatment, filed by Circon Energy, LLC. September/18/2023 2023/09/18 File
Circon Public Request Confidential Treatment Subject: Wheeling Implementation September/15/2023 2023/09/15 File
Circon Draft Wheeling Service Agreement Subject: Wheeling Implementation September/15/2023 2023/09/15 File
Response to LUMA’s Informative Motion Regarding Petition for Addition of Buyer of Last Resort Generation Protections & Discussion on Inconsistency on Proposed RES Charges Subject: Response to LUMA’s Informative Motion Regarding Petition for Addition of Buyer of Last Resort Generation Protections & Discussion on Inconsistency on Proposed RES Charges September/12/2023 2023/09/12 File
Fifth Independent Monitor Report Subject: Fifth Independent Monitor Report September/08/2023 2023/09/08 File
Resolution and Order Subject: August 29, 2023 Informative Motion regarding Buyer of Last Resort submitted by Phoebus Fund Puerto Rico LLC August/31/2023 2023/08/31 File
Informative Motion Regarding Petition for Addition of Buyer of Last Resort Generation Protections Submitted by Phoebus Fund Puerto Rico LLC Subject: Informative Motion Regarding Petition for Addition of Buyer of Last Resort Generation Protections Submitted by Phoebus Fund Puerto Rico LLC August/29/2023 2023/08/29 File
Fourth Independent Monitor Report Subject: Fourth Independent Monitor Report August/25/2023 2023/08/25 File
Resolution Subject: Resolution pertaining to First Independent Monitor Report; Second Independent Monitor Report; and Third Independent Monitor Report, filed by the Independent Monitor. August/16/2023 2023/08/16 File
Third Independent Monitor Report Subject: Third Independent Monitor Report August/11/2023 2023/08/11 File
Petition for Addition of Buyer of Last Resort Generation Protections Subject: Petition for Addition of Buyer of Last Resort Generation Protections July/31/2023 2023/07/31 File
Second Independent Monitor Report Subject: Second Independent Monitor Report July/28/2023 2023/07/28 File
First Independent Monitor Report Subject: First Independent Monitor Report July/14/2023 2023/07/14 File
Motion Informing Appointment of Independent Monitor Subject: Motion Informing Appointment of Independent Monitor July/13/2023 2023/07/13 File
Motion Informing Appointment of Independent Monitor Subject: Motion Informing Appointment of Independent Monitor July/13/2023 2023/07/13 File
Informative Motion on Appointment of Independent Monitor in  Compliance with Resolution and Order of June 6, 2023 Subject: Independent Monitor July/10/2023 2023/07/10 File
Motion in Compliance with Requests for Information Issued in Resolution and Order of June 23 2023  Subject: Motion in Compliance with Requests for Information Issued in Resolution and Order of June 23 2023 July/05/2023 2023/07/05 File
Subject: Corrected Exhibit D of Circon Energy LLC’s Letter Submitting Draft Wheeling Agreement – NEPR-MI-2023-0001 July/05/2023 2023/07/05 File
Comments – Phoebus Response to June 23rd Resolution and Order Subject: Comments – Phoebus Response to June 23rd Resolution and Order – NEPR-MI-2023-0001 July/05/2023 2023/07/05 File
Circon Energy LLC’s Letter Submitting Draft Wheeling Agreement Subject: Exhibit A Wheeling Service Agreement June/28/2023 2023/06/28 File
Circon Energy LLC’s Letter Submitting Draft Wheeling Agreement Subject: Circon Energy LLC’s Letter Submitting Draft Wheeling Agreement June/28/2023 2023/06/28 File
SESA Comments on Draft Wheeling Services Agreement Subject: SESA Comments on Draft Wheeling Services Agreement June/27/2023 2023/06/27 File
Comentarios de la Oficina Independiente de Protección al Consumidor (OIPC) en Cumplimiento con la Resolución y Orden del 6 de junio de 2023 Subject: Comentarios de la Oficina Independiente de Protección al Consumidor (OIPC) en Cumplimiento con la Resolución y Orden del 6 de junio de 2023 June/27/2023 2023/06/27 File
Resolution and Order Subject: First Requirement of Information (“ROl”) – Wheeling implementation costs and Ratifying Determination on LUMA’s April 21 filing June/23/2023 2023/06/23 File
Phoebus Comments – Response and Comments to April 21, 2023 Draft of Wheeling Service Agreement Subject: Phoebus Comments – Response and Comments to April 21, 2023 Draft of Wheeling Service Agreement June/22/2023 2023/06/22 File
Motion to Inform PREPA’s Affirmative Actions in Compliance with the June 6 Order  Subject: Motion to Inform PREPA’s Affirmative Actions in Compliance with the June 6 Order June/16/2023 2023/06/16 File
Motion to Inform PREPA’s Affirmative Actions in Compliance with the June 6 Order Subject: Motion to Inform PREPA’s Affirmative Actions in Compliance with the June 6 Order June/16/2023 2023/06/16 File
Motion Submitting Revised Draft Wheeling Services Agreement Subject: Motion Submitting Revised Draft Wheeling Services Agreement June/08/2023 2023/06/08 File
Resolution and Order Subject: Resolution and Order Approving stakeholder consultation and affirming decision for PREPA to share data June/06/2023 2023/06/06 File
LUMA’s Response to PREPA’s “Motion to Inform PREPA’s Position in the Regard to the OIS PI Fuel Data and Request for Reconsideration of the March 24 Order”  Subject: LUMA’s Response to PREPA’s “Motion to Inform PREPA’s Position in the Regard to the OIS PI Fuel Data and Request for Reconsideration of the March 24 […] April/27/2023 2023/04/27 File
Motion in Compliance with Resolution and Order of March 24, 2023, Submitting Draft Wheeling Services Agreement and Information in Support of Draft Wheeling Services Agreement Application Form Subject: Motion in Compliance with Resolution and Order of March 24, 2023 April/21/2023 2023/04/21 File
Moción del ICSE en respuesta al “Motion to Inform PREPA’s Position in Regard to the OSI-PI Fuel Data and Request for Reconsideration of the March 24 Order” Subject: Moción del ICSE en respuesta al “Motion to Inform PREPA’s Position in Regard to the OSI-PI Fuel Data and Request for Reconsideration of the March 24 […] April/12/2023 2023/04/12 File
Motion in Partial Compliance with Resolution and Order of March 24, 2023 Subject: Motion in Partial Compliance with Resolution and Order of March 24, 2023 April/10/2023 2023/04/10 File
Motion to Inform PREPA’s Position in Regard to the OSI PI Data and Request for Reconsideration of the March 24 Order Subject: Motion to Inform PREPA’s Position in Regard to the OSI PI Data and Request for Reconsideration of the March 24 Order March/31/2023 2023/03/31 File
ICPO’s Comments to Attachment B of the Energy Bureau’s March 24, 2022, Final Resolution and Order (on NEPR-AP-2018-0004) Subject: As instructed in March 24’s Order, the Clerk’s Office includes as part of this proceeding a copy of the ICPO Comments filed on the Unbundling Case. March/24/2023 2023/03/24 File
Resolution and Order Subject: Guidance on wheeling implementation agreements and amendment to procedural schedule March/24/2023 2023/03/24 File
Request for Extension of Time to Submit Wheeling Services Agreement Subject: Request for Extension of Time to Submit Wheeling Services Agreement March/10/2023 2023/03/10 File
The Phoebus Fund PR, LLC Comments for Wheeling Technical Conference on February 23rd 2023 Subject: The Phoebus Fund PR, LLC Comments for Wheeling Technical Conference on February 23rd 2023 March/07/2023 2023/03/07 File
LUMA’s Motion Submitting Post-Technical Conference Comments Subject: LUMA’s Motion Submitting Post-Technical Conference Comments March/03/2023 2023/03/03 File
Comments and Responses of Circon Energy LLC Following the Stakeholder Technical Conference of February 23, 2023 Subject: Comments and Responses of Circon Energy LLC Following the Stakeholder Technical Conference of February 23, 2023 March/02/2023 2023/03/02 File
Motion Submitting Presentations Offered During Technical Conference of February 23, 2023 Subject: Presentation Offered During Technical Conference of February 23, 2023 February/23/2023 2023/02/23 File
Presentation Stakeholders Technical Conference Subject: PREB Presentation Stakeholders Technical Conference February/23/2023 2023/02/23 File
LUMA’s Motion Submitting Stakeholder Comments in Anticipation to Technical Conference Subject: LUMA’s Motion Submitting Stakeholder Comments in Anticipation to Technical Conference February/21/2023 2023/02/21 File
Motion Requesting Modification to Proposed Agenda for Stakeholder Technical Conference Subject: Motion Requesting Modification to Proposed Agenda for Stakeholder Technical Conference February/15/2023 2023/02/15 File
Motion Submitting Wheeling Services Agreement Application Form and Proposal for Non-Refundable Fee Subject: Motion Submitting Wheeling Services Agreement Application Form and Proposal for Non-Refundable Fee February/15/2023 2023/02/15 File
Motion Informing Publication of Wheeling Customer Rider in Compliance with Resolution and Order dated November 22, 2022 Subject: Motion Informing Publication of Wheeling Customer Rider in Compliance with Resolution and Order dated November 22, 2022 February/10/2023 2023/02/10 File
ICSE Motion to LUMA February 2, 2023 Motion Subject: ICSE Motion to LUMA February 2, 2023 Motion February/06/2023 2023/02/06 File
Motion Submitting Responses to Request for Information Issued Through Resolution and Order dated January 13, 2023 Subject: Appendix C – Variable Production Cost February/02/2023 2023/02/02 File
Motion Submitting Responses to Request for Information Issued Through Resolution and Order dated January 13, 2023 Subject: Appendix B – Fuel Prices February/02/2023 2023/02/02 File
Motion Submitting Responses to Request for Information Issued Through Resolution and Order dated January 13, 2023 Subject: Motion Submitting Responses to RFIs Issued Through Resolution and Order dated January 13, 2023 February/02/2023 2023/02/02 File
Resolution and Order Subject: Resolution and Order Initiating the Procedure January/13/2023 2023/01/13 File

Antonio Torres-Miranda is presently an Associate Commissioner for the Energy Bureau of the Puerto Rico Public Service Regulatory Board (Energy Bureau). Previously, Mr. Torres had been the Director of the Legal Advisory Division of the Energy Bureau.

Mr. Torres has a bachelor’s degree in mechanical engineering from the University of Puerto Rico. He also has a master’s degree in engineering management from the Polytechnical University of Puerto Rico. In the 1990’s he passed the exam to be a Certified Energy Manager. He is presently a member of the Puerto Rico Professional College of Engineer and Land Surveyors.

Mr. Torres graduated with honors from the Interamerican University of Puerto Rico where he obtained his Juris Doctor degree. He is presently member of the bar of the Commonwealth of Puerto Rico and is a member of the U.S. District of Puerto Rico Federal bar.

He commenced his engineering work experience with the Department of Defense in a Naval base in Virginia were he designed industrial ventilation systems. He then went to New York to work with Kennetech Energy Management were he first commenced being immersed in the energy sector. He then transferred to Puerto Rico with Kennetech in which he conducted wind studies throughout the island together with U.S. Wind Power. He continued implementation of energy management systems in several industrial companies throughout Puerto Rico until Kennetech joined forces with Enron to develop the first privately owned power plant in Puerto Rico known as EcoElectrica. This 450 MW natural gas power plant included the development of the first LNG terminal in Puerto Rico.

He also worked as a contractor with the Puerto Rico Electric Power Authority in the development of a 42 miles natural gas pipeline.

Before joining the Energy Bureau Mr. Torres developed several natural gas projects in Puerto Rico.

Ferdinand Ramos-Soegaard attained a bachelor’s degree in electrical engineering (BSEE) graduating from the Georgia Institute of Technology in Atlanta, GA in 2000. His degree specialized in power distribution and telecommunications systems.

Mr. Ramos-Soegaard is a licensed professional engineer in the Commonwealth of Puerto Rico and the state of Florida. Throughout his professional carrier Mr. Ramos has been involved in all aspects of the design, construction and maintenance of electrical distribution systems, including high voltage transmission lines and renewable energy interconnections to the Puerto Rico Electric Power Authority subtransmission grid.

Sylvia B. Ugarte Araujo holds a bachelor’s degree in industrial and Systems Engineering from the University of Florida (1998). She studied at the Inter-American University of Puerto Rico School of Law (2004) and then obtained a Master of Laws from the Inter-American University of Puerto Rico (2019). Ms. Ugarte is admitted to the practice of law and notary by the Supreme Court of Puerto Rico (2004), the Federal Court for the District of Puerto Rico, for the First Circuit of Boston (2005), the Court of Appeals of the First Circuit (2005) and the Supreme Court of Texas (2018). She was Director of the Office of Legal Counsel of the Energy Bureau of the Public Service Regulatory Board and the Designated Director of the Office of Legal Counsel of the Public Service Regulatory Board. She has served as Legal Director of the Puerto Rico Infrastructure Financing Authority and has worked with renowned law firms. She has over fifteen (15) years of vast professional experience as a trial attorney with an emphasis on commercial and construction litigation and extensive experience in administrative law. Also, as an industrial engineer she has been a consultant for government agencies in charge of large projects and in private entities.

Lillian Mateo-Santos obtained her Bachelor’s Degree in Business Administration from the University of Puerto Rico, Río Piedras Campus, in 1993 and a Juris Doctor degree from the University of Puerto Rico School of Law in 1996. In 1999, she obtained a degree of Masters of Laws (LLM) in Environmental and Energy of the Tulane University Law School. Before joining the Puerto Rico Energy Bureau, Ms. Mateo-Santos was a member of various law firms. Her private practice was focused on energy, environmental, land use and permitting matters, including administrative law litigation.

On June 5, 2019, Ms. Mateo-Santos was elected 2nd Vice President of the Southeastern Association of Regulatory Utility Commissioners (SEARUC). She is a member of the American Bar Association and is admitted to practice law and notary law in Puerto Rico, and the United States Court of Appeals for the First Circuit.

Edison Avilés-Deliz obtained his Bachelor of Science in Electrical Engineering with specialties in Power and Control Systems (BSEE) Cum Laude from the University of Puerto Rico, Mayagüez Campus in 1991 and a Juris Doctor (JD) also Cum Laude from the University of Puerto Rico School of Law in 1997. In addition, he holds Master degrees with Distinctions in Diplomacy/International Relations/Business (MA) from Norwich University in Vermont and in Energy Law from Vermont Law School (LLM).

Avilés-Deliz is a licensed engineer and member of the College of Engineers and Surveyors of Puerto Rico (CIAPR). He was president of the Disciplinary and Professional Ethics Tribunal of the CIAPR, of the Institute of Electrical Engineers of CIAPR and of the Society of Electrical Engineers of Puerto Rico. He is admitted to practice as a public notary in Puerto Rico and as a lawyer, both in the District Court of Puerto Rico and the Court of Appeals for the First Federal Circuit.

He is a member of Phi Eta Mu Fraternity, the Engineering Honor Society Tau Beta Pi, and the International Studies Honor Society Sigma Iota Rho. He is also a Senior member of the IEEE.

Antonio Torres-Miranda es actualmente Comisionado Asociado del Negociado de Energía de la Junta Reglamentadora de Servicios Públicos de Puerto Rico (Negociado de Energía). Anteriormente, el Sr. Torres había sido Director de la División de Asesoría Legal del Negociado de Energía.

El Sr. Torres tiene un bachillerato en ingeniería mecánica de la Universidad de Puerto Rico. También tiene una maestría en administración de ingeniería de la Universidad Politécnica de Puerto Rico. En la década de 1990 aprobó el examen para ser Gerente de Energía Certificado. Actualmente es miembro del Colegio de Ingenieros y Agrimensores de Puerto Rico.

El Sr. Torres se graduó con honores de la Universidad Interamericana de Puerto Rico donde obtuvo su título de Juris Doctor (JD). Actualmente es miembro del Colegio de Abogados del Estado de Puerto Rico y es miembro del Colegio de Abogados Federal del Distrito de Puerto Rico de los Estados Unidos.

Comenzó su experiencia laboral en ingeniería con el Departamento de Defensa en una base naval en Virginia donde diseñó sistemas de ventilación industrial. Luego se fue a Nueva York para trabajar con Kennetech Energy Management, donde comenzó a sumergirse en el sector energético. Luego se transfirió a Puerto Rico con Kennetech, donde realizó estudios eólicos en toda la isla U.S. Wind Power. Continuó con la implementación de sistemas de administración de energía en varias empresas industriales en todo Puerto Rico hasta que Kennetech unió fuerzas con Enron para desarrollar la primera planta de energía de propiedad privada en Puerto Rico conocida como EcoEléctrica. Esta planta de energía de gas natural de 450 MW incluyó el desarrollo de la primera terminal de GNL en Puerto Rico.

También trabajó como contratista con la Autoridad de Energía Eléctrica de Puerto Rico en el desarrollo de una tubería de gas natural de 42 millas.

Antes de unirse al Negociado de Energía, el Sr. Torres desarrolló varios proyectos de gas natural en Puerto Rico.

La Lcda. Sylvia B. Ugarte Araujo posee un Bachillerato en Ingeniería Industrial y de Sistemas de la Universidad de la Florida (1998). Estudió en la Escuela de Derecho de la Universidad Interamericana de Puerto Rico (2004) y luego obtuvo una Maestría en Derecho de la Universidad Interamericana de Puerto Rico (2019). La Lcda. Ugarte está admitida a la práctica de la abogacía y la notaría por el Tribunal Supremo de Puerto Rico (2004), al Tribunal Federal, Distrito de Puerto Rico, al Primer Circuito Federal de Boston (2005), al Tribunal de Apelaciones del Primer Circuito (2005) y al Tribunal Supremo de la jurisdicción del estado de Texas (2018). Fue Directora de la Oficina de Asesoramiento Legal del Negociado de Energía de la Junta Reglamentadora de Servicio Público y la Directora Designada de la Oficina de Asesoramiento Legal de la Junta Reglamentadora de Servicio Público. Ha ejercido como Directora Legal de la Autoridad para el Financiamiento de la Infraestructura de Puerto Rico y ha trabajado con bufetes de abogado de renombre. Tiene sobre quince (15) años de vasta experiencia profesional como abogada litigante con énfasis en litigio comercial y construcción y una amplia experiencia en derecho administrativo. Así también, como ingeniera industrial ha sido consultora para agencias gubernamentales encargadas de proyectos de envergadura y en entidades privadas.

Ferdinand A. Ramos-Soegaard obtuvo su Bachillerato en Ciencias en Ingeniería Eléctrica (BSEE, por sus siglas en inglés) del Georgia Institute of Technology en Atlanta, GA en el 2000, con especialidad en sistemas de distribución de potencia y telecomunicaciones.

Ramos-Soegaard es ingeniero licenciado en el Estado Libre Asociado de Puerto Rico y en el Estado de Florida. A través de su carrera profesional, Ramos-Soegaard ha estado envuelto en todos los aspectos del diseño, construcción y mantenimiento de sistemas de distribución eléctrica, incluyendo líneas de transmisión de alto voltaje e interconexiones de sistemas de energía renovable a la red de subtransmisión de la Autoridad de Energía Eléctrica de Puerto Rico.

Lillian Mateo-Santos obtuvo su Bachillerato en Administración de Empresas de la Universidad de Puerto Rico, Recinto de Río Piedras en 1993 y el grado de Juris Doctor de la Facultad de Derecho de la Universidad de Puerto Rico en 1996. En 1999 obtuvo una Maestría en Derecho (LLM) en Ambiental y Energía de la Facultad de Derecho de la Universidad de Tulane. Antes de formar parte del Negociado de Energía de Puerto Rico, la Lic. Mateo-Santos fue miembro de varios bufetes de abogados. Su práctica privada se enfocó en asuntos de energía, ambiental, uso de terrenos y permisos, incluyendo litigación de derecho administrativo.

El 5 de junio de 2019, la Lic. Mateo-Santos fue elegida 2nda Vice Presidenta del Southern Association of Regulatory Utility Commissioners (SEARUC). Es miembro de la American Bar Association y está admitida para ejercer como abogado y notario público en Puerto Rico, y en el Tribunal de Apelaciones para el Primer Circuito Federal.

Edison Avilés-Deliz obtuvo su bachillerato Cum Laude en Ingeniería Eléctrica con especialidades en Sistemas de Controles y Potencia (BSEE) de la Universidad de Puerto Rico, Recinto de Mayagüez en 1991 y un Juris Doctor (JD) también Cum Laude de la Facultad de Derecho de la Universidad de Puerto Rico en 1997. Además, ostenta maestrías con Distinciones en Diplomacia/Relaciones Internacionales/Negocios (MA) de la Universidad de Norwich en Vermont y en Derecho en Energía de la Universidad de Derecho de Vermont (LLM).

Avilés-Deliz es ingeniero licenciado y miembro del Colegio de Ingenieros y Agrimensores de Puerto Rico (CIAPR). Fue presidente del Tribunal Disciplinario y de Ética Profesional del CIAPR, del Instituto de Ingenieros Electricistas del CIAPR y de la Sociedad de Ingenieros Electricistas de Puerto Rico. Está admitido para ejercer como notario público en Puerto Rico y como abogado, tanto en el Tribunal de Distrito de Puerto Rico como el Tribunal de Apelaciones para el Primer Circuito Federal.

Pertenece a la fraternidad Phi Eta Mu, a la Sociedad de Honor de Ingeniería Tau Beta Pi, a la Sociedad de Honor de Estudios Internacionales Sigma Iota Rho. También es miembro senior de la IEEE.