Motion to Submit Presentation for Technical Conference Scheduled for April 24, 2025.
Subject: Submittal Presentation for Technical Conference Scheduled for April 24, 2025
|
23/abril/2025
|
2025/04/23
|
File
|
Resolution and Order
Subject: Technical Conferences Regarding Customer Battery Sharing, Revised Transition Period Plan, and Generator Emergency Demand Response Program; Revised Schedule for Three-Year EE and DR Plan.
|
03/abril/2025
|
2025/04/03
|
File
|
Motion to Request Rapid Approval of the Permanent CBES Program Proposal as Filed by LUMA
Subject: IN RE: Energy Efficiency and Demand Response Transition Period Plan.
|
27/marzo/2025
|
2025/03/27
|
File
|
Motion to Submit March 2025 Report on the Development of the Pilot Backup Generation Demand Response Program
Subject: LUMA – Sumittal of March 2025 Report on the Development of the Pilot Backup Generation Demand Response Program
|
17/marzo/2025
|
2025/03/17
|
File
|
Motion to Request a Procedural Schedule for Stakeholder Participation and Comment on the Permanent CBES Program Proposal
Subject: Motion to Request a Procedural Schedule for Stakeholder Participation and Comment on the Permanent CBES Program Proposal
|
28/febrero/2025
|
2025/02/28
|
File
|
Notice of Withdrawal as Attorney of Record
Subject: IN RE: Energy Efficiency and Demand Response Transition Period Plan
|
25/febrero/2025
|
2025/02/25
|
File
|
Motion to Submit February 2025 Report on the Development of the Pilot Backup Generators Demand Response Program
Subject: LUMA – Submittal of February 2025 Report on the Development of the Pilot Backup Generators Demand Response Program
|
18/febrero/2025
|
2025/02/18
|
File
|
Motion to Submit Responses to Requirements of Information in Compliance with Resolution and Order of January 24, 2025
Subject: LUMA – Motion to Submit Responses to Requirements of Information in Compliance with Resolution and Order of January 24, 2025
|
14/febrero/2025
|
2025/02/14
|
File
|
Motion to Submit FY2025 Q2 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report
Subject: LUMA – Motion to Submit FY2025 Q2 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report
|
14/febrero/2025
|
2025/02/14
|
File
|
Request to Add LUMA Email Address to Notice
Subject: Request to Add LUMA Email Address to Notice
|
04/febrero/2025
|
2025/02/04
|
File
|
Motion to Submit Revised Energy Efficiency and Demand Response Transition Period Plan and Request for Modification of Deadlines Relating to Three-Year Energy Efficiency and Demand Response Plan
Subject: LUMA – Motion to Submit Revised Energy Efficiency and Demand Response Transition Period Plan and Request for Modification of Deadlines Relating to Three-Year Energy Efficiency and […]
|
31/enero/2025
|
2025/01/31
|
File
|
Motion to Submit Permanent Customer Battery Energy Sharing Program Proposal in Compliance with Resolution and Orders of October 23, 2024 and December 5, 2024
Subject: LUMA – Motion to Submit Permanent Customer Battery Energy Sharing Program Proposal in Compliance with Resolution and Orders of October 23, 2024 and December 5, 2024
|
31/enero/2025
|
2025/01/31
|
File
|
Resolution and Order
Subject: Motion for Reconsideration of October 23 Resolution and Order, Annual Report Template, Quarterly Report Template and FY2025 Q1 Report.
|
24/enero/2025
|
2025/01/24
|
File
|
Motion to Submit January 2025 Report on the Development of the Backup Generators Emergency Demand Response Program
Subject: LUMA – Motion to Submit January 2025 Report on the Development of the Backup Generators Emergency Demand Response Program
|
15/enero/2025
|
2025/01/15
|
File
|
Resolution and Order
Subject: Resolution and Order to Request for Extension of Deadlines and Modification of a Reporting Requirement in Resolution and Order of October 23, 2024.
|
05/diciembre/2024
|
2024/12/05
|
File
|
Motion for Extension of Deadlines and Modification of a Reporting Requirement in Resolution and Order of October 23, 2024
Subject: IN RE: Energy Efficiency and Demand Response Transition Period Plan
|
25/noviembre/2024
|
2024/11/25
|
File
|
Motion to Submit FY2025 Q1 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report
Subject: Motion to Submit FY2025 Q1 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report
|
14/noviembre/2024
|
2024/11/14
|
File
|
Motion for Reconsideration of Resolution and Order of October 23, 2024
Subject: IN RE: Energy Efficiency and Demand Response Transition Period Plan
|
12/noviembre/2024
|
2024/11/12
|
File
|
Motion to Submit Responses to Requests for Information in Compliance with Resolution and Order of October 23, 2024
Subject: 20241107 MI20220001 FINAL_CONFIRMATION OF ENERGY SAVINGS ESTIMATES_ROI_Oct 23.v3 (2)
|
07/noviembre/2024
|
2024/11/07
|
File
|
Motion to Submit Responses to Requests for Information in Compliance with Resolution and Order of October 23, 2024
Subject: Motion to Submit Responses to Requests for Information in Compliance with Resolution and Order of October 23, 2024
|
07/noviembre/2024
|
2024/11/07
|
File
|
Motion to Submit FY2024 Consolidated Transition Period Plan and Demand Response Administrative Cost Annual Report and Request for Approval of Template for These Annual Reports
Subject: IN RE: Energy Efficiency and Demand Response Transition Period Plan
|
28/octubre/2024
|
2024/10/28
|
File
|
Notice of Withdrawal as Attorney of Record
Subject: Notice of Withdrawal as Attorney of Record
|
25/octubre/2024
|
2024/10/25
|
File
|
Resolution and Order
Subject: Administrative Costs, Three-year Plan Schedule, and FY24 Budget Rollover.
|
23/octubre/2024
|
2024/10/23
|
File
|
Motion Requesting Approval for Rollover of Unspent FY2024 Energy Emergency Program Funds to the FY2025 Budget for Energy Efficiency Programs
Subject: Motion Requesting Approval for Rollover of Unspent FY2024 Energy Emergency Program Funds to the FY2025 Budget for Energy Efficiency Programs
|
09/octubre/2024
|
2024/10/09
|
File
|
Informative Motion, Request for Clarification Regarding Delayed Timeline for Completion of Market Baseline and Potential Studies, and Request for Extension of Deadline to Submit Draft Three-Year Plan and Associated Tasks and Deadlines
Subject: Informative Motion, Request for Clarification Regarding Delayed Timeline for Completion of Market Baseline and Potential Studies, and Request for Extension of Deadline to Submit Draft Three-Year […]
|
16/septiembre/2024
|
2024/09/16
|
File
|
Motion to Submit FY2024 Q4 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report and Request for Approval Template for these Quarterly Reports
Subject: Motion to Submit FY2024 Q4 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report and Request for Approval Template for these Quarterly Reports
|
13/agosto/2024
|
2024/08/13
|
File
|
SunRun Public Comment Letter
Subject: IN RE: EE and DR Transition Period Plan
|
15/julio/2024
|
2024/07/15
|
File
|
Motion in Compliance with Resolution and Order of June 21, 2024
Subject: IN RE: Energy Efficiency and Demand Response Transition Period Plan
|
29/junio/2024
|
2024/06/29
|
File
|
Resolution and Order
Subject: Fiscal Year 2025 Energy Efficiency Budget and Program Status
|
21/junio/2024
|
2024/06/21
|
File
|
Motion to Submit FY2024 Q3 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report, Inform of Processing of Energy Efficiency Rebates, and Request Confidential Treatment
Subject: Exhibit 2 REDACTED – Rebates Processed_Batch_2024-04-04_10-11_projects (1) (003)
|
15/mayo/2024
|
2024/05/15
|
File
|
Motion to Submit FY2024 Q3 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report, Inform of Processing of Energy Efficiency Rebates, and Request Confidential Treatment
Subject: Exhibit 2 REDACTED- Rebates Processed_Batch_2024-04-18_13-21_projects
|
15/mayo/2024
|
2024/05/15
|
File
|
Motion to Submit FY2024 Q3 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report, Inform of Processing of Energy Efficiency Rebates, and Request Confidential Treatment
Subject: Exhibit 2 REDACTED- Rebates Processed_Batch_2024-04-11_10-15_projects (1) (003)
|
15/mayo/2024
|
2024/05/15
|
File
|
Motion to Submit FY2024 Q3 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report, Inform of Processing of Energy Efficiency Rebates, and Request Confidential Treatment
Subject: Exhibit 2 REDACTED- Rebates Processed_Batch_2024-03-28_13-39_projects (003)
|
15/mayo/2024
|
2024/05/15
|
File
|
Motion to Submit FY2024 Q3 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report, Inform of Processing of Energy Efficiency Rebates, and Request Confidential Treatment
Subject: Motion to Submit FY2024 Q3 Consolidated Transition Period Plan and Demand Response Administrative Cost Quarterly Report, Inform of Processing of Energy Efficiency Rebates, and Request Confidential […]
|
15/mayo/2024
|
2024/05/15
|
File
|
Resolution and Order
Subject: Resolution and Order for Motion to Submit Second Quarterly Report on Administrative Costs and Expenditures of TPP DR Programs and Request to Consolidate Reporting Requirements, filed […]
|
21/marzo/2024
|
2024/03/21
|
File
|
Motion to Submit FY24 Q1 TPP Quarterly Report
Subject: Motion to Submit FY24 Q1 TPP Quarterly Report
|
29/febrero/2024
|
2024/02/29
|
File
|
Motion to Submit Second Quarterly Report on Administrative Costs and Expenditures of TPP DR Programs and Request to Consolidate Reporting Requirements
Subject: Submittal of Second Quarterly Report on Administrative Costs and Expenditures of TPP DR Programs and Request to Consolidate Reporting Requirements
|
15/febrero/2024
|
2024/02/15
|
File
|
Informative Motion Regarding Status of Energy Efficiency Programs
Subject: Informative Motion Regarding Status of Energy Efficiency Programs
|
07/febrero/2024
|
2024/02/07
|
File
|
Motion to Submit Revised TPP and Other Information Requested under the Resolution and Order of November 29, 2023
Subject: Motion to Submit Revised TPP and Other Information Requested under the Resolution and Order of November 29, 2023
|
20/diciembre/2023
|
2023/12/20
|
File
|
Resolution and Orden
Subject: Resolution and Order about a Request for Extension to Comply with the Order for LUMA to Provide Information under the Resolution and Order of November 29, […]
|
12/diciembre/2023
|
2023/12/12
|
File
|
Request for Extension to Comply with the Order for LUMA to Provide Information under the Resolution and Order of November 29, 2023
Subject: Request for Extension to Comply with the Order for LUMA to Provide Information under the Resolution and Order of November 29, 2023
|
07/diciembre/2023
|
2023/12/07
|
File
|
Memorandum of Law in Support of Confidential Treatment of Exhibit 1 to the «Motion to File Proof of Customer Enrollment and Additional Executive Master Aggregation Agreements and Evidence on Capability to Call Emergency DR Events and Request for Confidentiality» Filed by LUMA on November 22, 2023
Subject: Memorandum of Law in Support of Confidential Treatment of Exhibit 1 to the «Motion to File Proof of Customer Enrollment and Additional Executive Master Aggregation Agreements […]
|
04/diciembre/2023
|
2023/12/04
|
File
|
Resolution and Order
Subject: Extension of Transition Period Plan by One Year; Extension of DR Aggregator Certification Deadline
|
29/noviembre/2023
|
2023/11/29
|
File
|
Motion to submit FY 2024 Q1 TPP Report
Subject: Motion to submit FY 2024 Q1 TPP Report
|
29/noviembre/2023
|
2023/11/29
|
File
|
Motion to File Proof of Customer Enrollment and Additional Executed Master Aggregation Agreements and Evidence on Capability to Call Emergency Dr Events and Request for Confidentiality
Subject: Exhibit 3_CBES Test Event Data
|
22/noviembre/2023
|
2023/11/22
|
File
|
Motion to File Proof of Customer Enrollment and Additional Executed Master Aggregation Agreements and Evidence on Capability to Call Emergency Dr Events and Request for Confidentiality
Subject: Motion to File Proof of Customer Enrollment and Additional Executed Master Aggregation Agreements and Evidence on Capability to Call Emergency Dr Events and Request for Confidentiality
|
22/noviembre/2023
|
2023/11/22
|
File
|
Informative Motion and Request Extension to Submit Documentation S Showing the Processing of Energy Efficiency Incentive/Rebate Applications
Subject: Informative Motion and Request Extension to Submit Documentation S Showing the Processing of Energy Efficiency Incentive/Rebate Applications
|
21/noviembre/2023
|
2023/11/21
|
File
|
Motion to Submit First Quarterly Report on Administrative Costs and Expenditures of TPP DR Programs
Subject: First Quarterly Report on Administrative Costs and Expenditures of TPP DR Programs
|
14/noviembre/2023
|
2023/11/14
|
File
|
Comments in Support of LUMA’s Request to Extend by One Year the Deadline to File the Three-Year Plan, Concomitant Deadlines, and Extend the Term of the Transition Period Plan for an Additional Fiscal Year; and Motion to Extend the Deadline for Battery Demand Response Program Aggregators to be Certified as Electric Service Companies Under Regulations 8701 and 9246
Subject: Comments in Support of LUMA’s Request to Extend by One Year the Deadline to File the Three-Year Plan, Concomitant Deadlines, and Extend the Term of the […]
|
07/noviembre/2023
|
2023/11/07
|
File
|
Motion to Submit TTP FY2023 Annual Report
Subject: Motion to Submit TTP FY2023 Annual Report
|
30/octubre/2023
|
2023/10/30
|
File
|
Request to Extend by One Additional Year the Deadline to File the three-Year Plan, Concomitant Deadlines and Extend the Term of the Transition Period Plan for an Additional Fiscal Yea
Subject: Request to Extend by One Additional Year the Deadline to File the three-Year Plan, Concomitant Deadlines and Extend the Term of the Transition Period Plan for […]
|
30/octubre/2023
|
2023/10/30
|
File
|
Motion to File Proof of Execution of Master Aggregation Agreements and Provide Update on Customer Enrollment
Subject: Motion to File Proof of Execution of Master Aggregation Agreements and Provide Update on Customer Enrollment
|
13/octubre/2023
|
2023/10/13
|
File
|
Informative Motion Regarding Aggregation Agreements
Subject: Informative Motion Regarding Aggregation Agreements
|
29/septiembre/2023
|
2023/09/29
|
File
|
Informative Motion and Request for Extension of Deadline to File Proof of Execution of Aggregation Agreements and Approval of Revised Program Budget
Subject: Informative Motion and Request for Extension of Deadline to File Proof of Execution of Aggregation Agreements and Approval of Revised Program Budget
|
20/septiembre/2023
|
2023/09/20
|
File
|
Motion in Response to Energy Bureau’s Determination in Resolution and Order of August 29, 2023 Related to Confidentiality Request
Subject: Motion in Response to Energy Bureau’s Determination in Resolution and Order of August 29, 2023 Related to Confidentiality Request
|
05/septiembre/2023
|
2023/09/05
|
File
|
Resolution and Order
Subject: LUMA August 23, 2023, Motion filing its Emergency Demand Response Program Cost and Timeline
|
29/agosto/2023
|
2023/08/29
|
File
|
Motion to Submit FY 2023 Q4 TPP Report
Subject: Motion to Submit FY 2023 Q4 TPP Report
|
29/agosto/2023
|
2023/08/29
|
File
|
Motion to Submit Costs Associated with Emergency DR Program in Compliance with Resolution and Order of August 11, 2023, and Request for Confidential Treatment
Subject: Motion to Submit Costs Associated with Emergency DR Program in Compliance with Resolution and Order of August 11, 2023, and Request for Confidential Treatment
|
23/agosto/2023
|
2023/08/23
|
File
|
Exhibit 1 – Battery Emergency Demand Response (DR) Program – Cost Structure
Subject: Luma retiró solicitud de confidencialidad en este Exhibit mediante moción de 5 de septiembre de 2023.
|
23/agosto/2023
|
2023/08/23
|
File
|
Resolution and Order
Subject: Addressing Requests for Funding Clarity and Adjusted Milestone Deadlines for Emergency Demand Response Program
|
11/agosto/2023
|
2023/08/11
|
File
|
Comments Proposing Program Launch Milestones for the Battery Emergency DR Program Under LUMA EE/DR Transition Period Plan
Subject: Comments Proposing Program Launch Milestones for the Battery Emergency DR Program Under LUMA EE/DR Transition Period Plan
|
01/agosto/2023
|
2023/08/01
|
File
|
SESA Reiterated Request for PREB Funding Authorization for LUMA to Move Forward with EEDR Programs and Further Requests for Clarity of Emergency DR Program Details
Subject: SESA Reiterated Request for PREB Funding Authorization for LUMA to Move Forward with EEDR Programs and Further Requests for Clarity of Emergency DR Program Details
|
20/julio/2023
|
2023/07/20
|
File
|
Response to Orders Staying Approval Implementation of EE Riders and Request for Suspension of Deadlines to Submit Proof of Customer Enrollment and Documentation on Capacity to Emergency DR Program
Subject: Response to Orders Staying Approval Implementation of EE Riders and Request for Suspension of Deadlines to Submit Proof of Customer Enrollment and Documentation on Capacity to […]
|
14/julio/2023
|
2023/07/14
|
File
|
Resolution
Subject: Motion to Submit Translation of Revised Exhibit 1 to EE Rider Petition in Compliance with Bench Order of May 5, 2023 and Request for Confidential Treatment […]
|
30/junio/2023
|
2023/06/30
|
File
|
Urgent Motion Requesting Determination Regarding The Revised EE Rider Petition And Clarifying The Calculated Factor In The Revised EE Rider Petition Submitted On May 19, 2023
Subject: Urgent Motion Requesting Determination Regarding The Revised EE Rider Petition And Clarifying The Calculated Factor In The Revised EE Rider Petition Submitted On May 19, 2023
|
29/junio/2023
|
2023/06/29
|
File
|
Resolution and Order
Subject: Addressing Requests for Clarification Regarding Emergency DR Program Requirements from DR Third Party Aggregator, Inc., and LUMA and LUMA’s Request for Extension of Enrollment Deadline.
|
15/junio/2023
|
2023/06/15
|
File
|
Motion to Submit Translation of Revised Exhibit 1 to EE Rider Petition in Compliance with Bench Order of May 5, 2023
Subject: Motion to Submit Translation of Revised Exhibit 1 to EE Rider Petition in Compliance with Bench Order of May 5, 2023
|
09/junio/2023
|
2023/06/09
|
File
|
Motion for Clarification of DR Third Party Aggregator, Inc. Regarding Application of Demand Response Regulation Section 2.02 and Regulation 8701 to Emergency Battery Demand Response Aggregators Under LUMA EE/DR Transition Period Plan
Subject: Motion for Clarification of DR Third Party Aggregator, Inc. Regarding Application of Demand Response Regulation Section 2.02 and Regulation 8701 to Emergency Battery Demand Response Aggregators […]
|
05/junio/2023
|
2023/06/05
|
File
|
Informative Motion and Urgent Request for Clarification Regarding Requirement Applicable to the Emergency DR Program and Extension to Meet Program Enrollment Deadline in Resolution and Order of April 3, 2023
Subject: Informative Motion and Urgent Request for Clarification Regarding Requirement Applicable to the Emergency DR Program and Extension to Meet Program Enrollment Deadline in Resolution and Order […]
|
05/junio/2023
|
2023/06/05
|
File
|
Motion to Submit Revised Exhibit 1 to EE Rider Petition and Translation Thereof, in Compliance with Bench Order of May 5, 2023
Subject: Motion to Submit Revised Exhibit 1 to EE Rider Petition and Translation Thereof, in Compliance with Bench Order of May 5, 2023
|
19/mayo/2023
|
2023/05/19
|
File
|
LUMA’s EE Rider Filing Technical Conference Presentation
Subject: Technical Conference Presentation
|
05/mayo/2023
|
2023/05/05
|
File
|
Comentarios de la Oficina Independiente de Protección al Consumido en Cumplimiento con Resolución y Orden del Negociado con Fecha del 3 de abril de 2023
Subject: Comentarios de la Oficina Independiente de Protección al Consumido en Cumplimiento con Resolución y Orden del Negociado con Fecha del 3 de abril de 2023
|
18/abril/2023
|
2023/04/18
|
File
|
Motion to Submit EE Rider
Subject: 20230411 Exhibit 2 EE Rider Factor Calculation_FY2024_Values
|
11/abril/2023
|
2023/04/11
|
File
|
Motion to Submit EE Rider
Subject: Motion to Submit EE Rider
|
11/abril/2023
|
2023/04/11
|
File
|
Reoslution and Order
Subject: Determination on LUMA’s March 8, 2023 Motion for Reconsideration and Request to Vacate Deadlines
|
03/abril/2023
|
2023/04/03
|
File
|
SESA Further Comments by SESA on Proposed EE and DR Transition Period Plan
Subject: SESA Further Comments by SESA on Proposed EE and DR Transition Period Plan
|
23/marzo/2023
|
2023/03/23
|
File
|
Motion for Reconsideration of Resolution and Order of February 16, 2023 and Request to Vacate Deadlines
Subject: Motion for Reconsideration of Resolution and Order of February 16, 2023 and Request to Vacate Deadlines
|
08/marzo/2023
|
2023/03/08
|
File
|
Resolution and Order
Subject: Determination of LUMA’s June 21, 2022, Proposed Transition Period Plan.
|
16/febrero/2023
|
2023/02/16
|
File
|
Motion to Submit Reply Comments Required in Orders of October 12, 2022 and November 2, 2022
Subject: Submittal of Reply Comments required in Orders of October 12, 2022 and November 2, 2022
|
02/diciembre/2022
|
2022/12/02
|
File
|
Tesla Reply Comments on Proposed EE/DR Transition Period Plan
No subject available.
|
30/noviembre/2022
|
2022/11/30
|
File
|
Motion to Request Extension to Submit Reply Comments Required in Orders of October 12, 2022 and November 2, 2022
Subject: Request Extension to Submit Reply Comments Required in Orders of October 12, 2022 and November 2, 2022
|
23/noviembre/2022
|
2022/11/23
|
File
|
Power Point Presentation-Technical Workshop: LUMA Transition Period Plan
Subject: Power Point Presentation-Technical Workshop: LUMA Transition Period Plan
|
16/noviembre/2022
|
2022/11/16
|
File
|
Tesla Comments on Proposed EEDR Transition Period Plan NEPR-MI-2022-0001
Subject: Tesla Comments on Proposed EEDR Transition Period Plan
|
09/noviembre/2022
|
2022/11/09
|
File
|
SESA- Answers to Questions by PREB to Stakeholders, including SESA on proposed EE and DR Transition Period Plan, Docket No. NEPR-MI-2022-0001
Subject: Comments
|
09/noviembre/2022
|
2022/11/09
|
File
|
Sunnova – Comments to Luma’s Transition Period Plan
Subject: Comments to Luma’s Transition Period Plan
|
09/noviembre/2022
|
2022/11/09
|
File
|
Tesla – Comments on Proposed EE/DR Transition Period Plan
Subject: Tesla – Comments on Proposed EE/DR Transition Period Plan
|
09/noviembre/2022
|
2022/11/09
|
File
|
Motion to Submit Responses to Requests for Information in Appendix A of Resolution and Order of October 12, 2022
Subject: Submittal of Responses to Requests for Information in Appendix A of Resolution and Order of October 12, 2022
|
09/noviembre/2022
|
2022/11/09
|
File
|
VEIC Comments on EE Transition Period Plan
Subject: VEIC Comments on EE Transition Period Plan
|
09/noviembre/2022
|
2022/11/09
|
File
|
Technical Workshop: LUMA Transition Period Plan
Subject: PowerPoint Presentation-Technical Workshop Transition Period Plan
|
04/noviembre/2022
|
2022/11/04
|
File
|
Motion to Submit Responses to Request for Information in Appendix B of Resolution and Order of October 12, 2022
Subject: Submittal of Responses to Requests for Information in Appendix B of Resolution and Order of October 12, 2022
|
04/noviembre/2022
|
2022/11/04
|
File
|
ICSE Comments to PREB Questions
Subject: ICSE Comments to PREB Questions
|
04/noviembre/2022
|
2022/11/04
|
File
|
Resolution and Order
Subject: Revised Schedule for Technical Conferences, Requests for Information, and Comments
|
02/noviembre/2022
|
2022/11/02
|
File
|
Independent Consumer Protection Office’s Comments to Appendix A of the Energy Bureau’s October 12, 2022, Resolution and Order
Subject: The Independent Consumer Protection Office’s Comments to Appendix A of the Energy Bureau’s October 12, 2022, Resolution and Order
|
28/octubre/2022
|
2022/10/28
|
File
|
Comments of the Southern Alliance for Clean Energy on proposed EE and DR Transition Period Plan,
Subject: Claen Energy (‘SACE») -Comments
|
28/octubre/2022
|
2022/10/28
|
File
|
Motion Requesting Extension to Submit Responses to Request for Information in Resolution and Order of October 12, 2022 Rescheduling of Related Technical Conference and Extension of Attendant Reply Comment Period
Subject: Request for Extension to Submit Responses to Request for Information in Resolution and Order of October 12, 2022 Rescheduling of Related Technical Conference and Extension of […]
|
27/octubre/2022
|
2022/10/27
|
File
|
Motion Requesting Clarification of the Next Deadline
Subject: Motion Requesting Clarification of the Next Deadline (Stakeholders Comments)
|
21/octubre/2022
|
2022/10/21
|
File
|
Resolution and Order
Subject: Proposed Transition Period Plan Requests for Information
|
12/octubre/2022
|
2022/10/12
|
File
|
Resolution and Order
Subject: Scheduling Technical Conference for November 4, 2022
|
29/septiembre/2022
|
2022/09/29
|
File
|
Comments by SESA on Proposed EE and DR Transition Period Plan
Subject: Comments by SESA on Proposed EE and DR Transition Period Plan
|
13/julio/2022
|
2022/07/13
|
File
|
VEIC Comments on EE Transition Period Plan
Subject: VEIC Comments on EE Transition Period Plan
|
13/julio/2022
|
2022/07/13
|
File
|
Resolution and Order
Subject: Energy Efficiency and Demand Response Transition Period Plan Proceeding
|
28/junio/2022
|
2022/06/28
|
File
|