Docket Number: NEPR-MI-2019-0009
In Re: Interconnection Regulations
Available files: 86
Files Date Orden Download
SESA – Urgent Request Regarding LUMA’s “Notice of Intent to File Comments in Response to Comment by Enphase and SESA and to Submit LUMA’s Proposal Regarding the Smart Inverter Settings” Subject: SESA – Urgent Request Regarding LUMA’s “Notice of Intent to File Comments in Response to Comment by Enphase and SESA and to Submit LUMA’s Proposal Regarding […] May/27/2025 2025/05/27 File
LUMA’s Notice of Intent to File Comments in Response to Comments Presented by Enphase and SESA and to Submit LUMA’s Proposal Regarding the Smart Inverter Settings Sheets Subject: LUMA’s Notice of Intent to File Comments in Response to Comments Presented by Enphase and SESA and to Submit LUMA’s Proposal Regarding the Smart Inverter Settings […] May/24/2025 2025/05/24 File
Comments of SESA regarding Urgent Need for Immediate Action on Smart Inverter Settings Subject: Comments of SESA regarding Urgent Need for Immediate Action on Smart Inverter Settings May/14/2025 2025/05/14 File
Request to Add LUMA Email Address to Notices Subject: Request to Add LUMA Email Address to Notices May/09/2025 2025/05/09 File
Enphase Energy, Inc. Comments Subject: Enphase Energy, Inc. Comments to PREB re: Smart Working Group Filings May/07/2025 2025/05/07 File
SESA Re Filing of Smart Inverter Recommendations Subject: SESA Re Filing of Smart Inverter Recommendations April/25/2025 2025/04/25 File
Motion to Submit LUMA’s Comments on Subjects Discussed During Smart Inverter Working Group Meetings Subject: LUMA’s Comments on Subjects Discussed During Smart Inverter Working Group Meetings April/25/2025 2025/04/25 File
Resolution Subject: Rescheduling of March 11, 2015 Smart Inverter Working Group Meeting and Agenda for Rescheduled Date March/10/2025 2025/03/10 File
Notice Withdrawal as Attorney of Record Subject: Notice Withdrawal as Attorney of Record February/25/2025 2025/02/25 File
Real World Impact of new Smart Inverter Settings since going into effect January 1st, 2025, and Request for Urgent Modifications to required Smart Inverter Settings Subject: IN RE: Interconnection Regulations February/10/2025 2025/02/10 File
Motion Reiterating Request of Order on Modification of Supplemental Studies Threshold to 30% Subject: SESA – Attachment 1 Motion Reiterating Req of Order Modification January/31/2025 2025/01/31 File
Motion Reiterating Request of Order on Modification of Supplemental Studies Threshold to 30% Subject: SESA – Motion Reiterating Request of Order on Modification of Supplemental Studies Threshold to 30% January/31/2025 2025/01/31 File
Resolution Subject: Rescheduling of Smart Inverter Working Group Meeting and Agenda for Rescheduled Date. January/13/2025 2025/01/13 File
Comentarios Suplementarios de la Oficina Independiente de Protección (OIPC) al Consumidor sobre lo Discutido en el Primer Taller sobre “Smart Inverters” Subject: IN RE: Reglamento de Interconexión December/26/2024 2024/12/26 File
Comentarios de la Oficina Independiente de Protección al Consumidor sobre lo Discutido en el Primer Taller sobre “Smart Inverters” Subject: Comentarios OIPC sobre lo Discutido en el Primer Taller sobre “Smart Inverters” December/11/2024 2024/12/11 File
SESA Initial Feedback on Smart Inverter Settings from December Workshop Subject: SESA Initial Feedback on Smart Inverter Settings from December Workshop December/11/2024 2024/12/11 File
Enphase Comments to SIWG on Volt Watt Implementation Subject: Enphase Comments to SIWG on Volt Watt Implementation December/11/2024 2024/12/11 File
Notice Subject: Smart Inverter Working Group (“SIWG”) Agenda for November 21, 2024. November/18/2024 2024/11/18 File
Motion to Submit Final Technical Bulletin Regarding Smart Inverter Settings Sheets in Compliance with Resolution and Order of November 7, 2024 and Request for Agenda for Workshop Scheduled for November 21, 2024 Subject: IN RE: Interconnection Regulations November/15/2024 2024/11/15 File
Resolution and Order Subject: Default Smart Inverter Settings Profile (Smart Inverter Settings Sheets) Approval and Establishment of Working Group Process. November/07/2024 2024/11/07 File
Notice of Withdrawal as Attorney of Record Subject: IN RE: Interconnection Regulations October/25/2024 2024/10/25 File
Comentarios de la Oficina Independiente de Protección al Consumidor sobre Incremento del Límite Indicativo de Saturación del Alimentador de un 15% a un 30% Subject: IN RE: Reglamento de Interconexión October/16/2024 2024/10/16 File
Motion in Support of Revised Technical Bulletin on Smart Inverter Setting Sheets Subject: Motion in Support of Revised Technical Bulletin on Smart Inverter Setting Sheets September/26/2024 2024/09/26 File
Motion to Submit Revised Technical Bulletin Regarding Smart Inverter Settings Sheets and Request to Substitute Exhibits 1 and 2 Submitted on September 13, 2024 Subject: IN RE: Interconnection Regulations September/17/2024 2024/09/17 File
Motion to Submit Revised Technical Bulletin Regarding Smart Inverter Settings Sheets Issued by LUMA Subject: IN RE: Interconnection Regulations September/13/2024 2024/09/13 File
Motion to Submit LUMA’s Position Regarding Modification of Threshold to Require Supplemental Studies Under Regulation 8915 in Compliance with Energy Bureau’s Bench Order of August 26, 2024, in Case NEPR-MI-2019-0016 Subject: IN RE: Interconnection Regulations September/05/2024 2024/09/05 File
Comments of Tesla, Inc Subject: Smart Inverter Default Utility Required Setting Profile – Comments of Tesla, Inc August/20/2024 2024/08/20 File
Motion Requesting Modification of Supplemental Studies Threshold Subject: Motion Regarding Modification of Supplemental Studies Threshold August/20/2024 2024/08/20 File
Comments of SESA Puerto Rico Subject: Comments of SESA Puerto Rico July/16/2024 2024/07/16 File
Comments of Sunrun Inc. Subject: Smart Inverter Default Utility Required Settings Profile – Comments of Sunrun Inc. July/15/2024 2024/07/15 File
Enphase Comments Subject: Enphase Energy, Inc. Comments on Default Smart Inverter Settings July/15/2024 2024/07/15 File
Resolution and Order Subject: Smart Inverter Default Utility Required Settings Profile – Stakeholder Comments. June/28/2024 2024/06/28 File
Request for Various Orders Regarding June 18th Conference and Technical Bulletin Subject: IN RE: Interconnection Regulations June/25/2024 2024/06/25 File
Motion to Submit Presentation Shown at Technical Conference/Stakeholder Workshop Held on June 18, 2024, with Correction and Revised Technical Bulletin Subject: Motion to Submit Presentation Shown at Technical Conference/Stakeholder Workshop Held on June 18, 2024, with Correction and Revised Technical Bulletin June/21/2024 2024/06/21 File
Motion to Submit Presentation Shown at Technical Conference/Stakeholder Workshop held on June 18, 2024, with Correction and Revised Technical Bulletin Subject: IN RE: Interconnection Regulations June/21/2024 2024/06/21 File
Presentation: Increasing Hosting Capacity of Distribution Feeders Through Energy Storage and Smart Inverter Functions Subject: Presentation: Increasing Hosting Capacity of Distribution Feeders Through Energy Storage and Smart Inverter Functions June/18/2024 2024/06/18 File
Renewed Request Regarding LUMA’s Technical Bulletin Subject: LUMA Technical Bulletin on smart inverter requirements June/17/2024 2024/06/17 File
Notice of Appearance Subject: Notice of Appearance June/17/2024 2024/06/17 File
Motion to Submit Presentation for Technical Conference/Stakeholder Workshop Scheduled for June 18, 2024 Subject: Motion to Submit Presentation for Technical Conference/Stakeholder Workshop Scheduled for June 18, 2024 June/17/2024 2024/06/17 File
Resolution and Order Subject: June 18th Technical Conference / Stakeholder Workshop Agenda June/12/2024 2024/06/12 File
Motion Requesting Agenda for Technical Conference Schedlued for June 18, 2024 Subject: Request for Agenda for Technical Conference Scheduled for June 18, 2024 June/07/2024 2024/06/07 File
Resolución y Orden Subject: Recalendarización de Conferencia Técnica. May/13/2024 2024/05/13 File
Urgent Motion to Reiterate Request to Reschedule the Technical Conference Set for May 16, 2024 Subject: Interconnection Regulations May/09/2024 2024/05/09 File
Notice of Appearance Subject: Notice of Appearance May/08/2024 2024/05/08 File
Reply to LUMA’S April 22, 2024 Response to Urgent Request Subject: Response to Urgent Request filed by SESA on April 4, 2024. May/03/2024 2024/05/03 File
Motion to Request the Rescheduling of The Technical Conference Set for May 16, 2024 Subject: Interconnection Regulations April/29/2024 2024/04/29 File
Notice of Appearance and Request of Notice Subject: Interconnections Regulations April/29/2024 2024/04/29 File
Response to Urgent Request filed by SESA on April 4, 2024 Subject: Response to Urgent Request filed by SESA on April 4, 2024 April/22/2024 2024/04/22 File
Moción en Cumplimiento de Orden Emitida el 15 de abril de 2024 Subject: Moción en Cumplimiento de Orden Emitida el 15 de abril de 2024 April/19/2024 2024/04/19 File
Resolución y Orden Subject: Reglamentos de Interconexión April/15/2024 2024/04/15 File
Tesis: Increasing Hosting Capacity of Distribution Feeders Through Energy Storage and Smart Inverter Functions Subject: Autora: Anny Huaman Rivera M. Sc. April/12/2024 2024/04/12 File
Presentación: Increasing Hosting Capacity of Distribution Feeders Through Energy Storage and Smart Inverter Functions Subject: Autora: Anny Huaman Rivera M. Sc. April/12/2024 2024/04/12 File
Notice of Intent to Submit Response to Urgent Request Filed by SESA on April 4, 2023 Subject: Notice of Intent to Submit Response to Urgent Request Filed by SESA on April 4, 2023. April/09/2024 2024/04/09 File
RE: Urgent Request Regarding LUMA’s Publication of a “Smart Inverter Setting – Sheets – Technical Bulletin” / Subject: RE: Urgent Request Regarding LUMA’s Publication of a “Smart Inverter Setting – Sheets – Technical Bulletin” / April/04/2024 2024/04/04 File
SESA Comments on and Redline of LUMA’s Technical Interconnection Requirements (TIR) Proposal Document in Docket NEPR-MI-2019-0009 No subject available. December/02/2022 2022/12/02 File
Moción Sometiendo Comentarios de la Oficina Independiente de Protección al Consumidor (OIPC) Subject: Moción Sometiendo Comentarios de la Oficina Independiente de Protección al Consumidor (OIPC) December/01/2022 2022/12/01 File
Motion to Submit Additional Comments Subject: Submittal of Additional Comments November/02/2022 2022/11/02 File
Resolution and Order Subject: Resolution and Order regarding Motion Requesting Extension to Submit Additional Comments and of Attendant Public Comment Period, filed by LUMA Energy, LLC and LUMA Energy ServCo, […] October/18/2022 2022/10/18 File
Motion Requesting Extension to Submit Additional Comments and Attendant Public Comment Period Subject: Request for Extension to Submit Additional Comments and Attendant Public Comment Period October/07/2022 2022/10/07 File
Motion Requesting Extension to Submit Additional Comments and Attendant Public Comment Period Subject: Request for Extension to Submit Additional Comments and Attendant Public Comment Period October/07/2022 2022/10/07 File
Resolution and Order Subject: Request for Public Comments of LUMA’s Additional Comments to Preliminary Draft of Proposed Generating Facility and Microgrid Interconnection Regulation, submitted on November 15, 2021, and LUMA’s […] September/09/2022 2022/09/09 File
Motion Submitting Complete Version of Technical Interconnection Requirements Document Subject: Motion Submitting Complete Version of Technical Interconnection Requirements Document May/19/2022 2022/05/19 File
Motion to Submit Additional Comments to Preliminary Draft of Proposed Generating Facility and Microgrid Interconnection Regulation Subject: Submittal of  Additional Comments to Preliminary Draft of Proposed Generating Facility and Microgrid Interconnection Regulation November/15/2021 2021/11/15 File
Motion Requesting Additional Time to Submit Additional Comments to Preliminary Draft of Proposed Generating Facility and Microgrid Interconnection Regulation Subject: Request for Additional Time to Submit Additional Comments to Preliminary Draft of Proposed Generating Facility and Microgrid Interconnection Regulation October/15/2021 2021/10/15 File
Resolución Subject: Solicitud de comentarios a la versión en español del Borrador Preliminar September/10/2021 2021/09/10 File
Additional Comments by SESA to Informal Draft Interconnection Proposed Rule Subject: SESA Additional Comments August/30/2021 2021/08/30 File
OIPC-Comentarios a Enmienda a la Regalmentación sobre Interconexión Subject: Comentarios Oficina Independiente de Protección al Consumidor (OIPC) August/30/2021 2021/08/30 File
Resolución Subject: Segunda Solicitud de Extensión de Término de la OIPC August/18/2021 2021/08/18 File
Segunda Moción en Solicitud Extensión de Término para Someter Comentarios al Reglamento de Inteconexión Subject: Solicitud de Extensión de Término para Someter Comentarios August/17/2021 2021/08/17 File
Resolución Subject: Solicitud de Extensión de Término de la OIPC August/03/2021 2021/08/03 File
Comments Prepared for the Renewable Energy Coalition Subject: Comments Prepared for the Renewable Energy Coalition July/31/2021 2021/07/31 File
SESA’s Comments on Proposed Draft Rule for Interconnection and Net Metering Subject: SESA’s Comments on Proposed Draft Rule for Interconnection and Net Metering July/30/2021 2021/07/30 File
Motion Submitting LUMA’s Comments to Preliminary Draft of Proposed Generating Facility and Microgrid Interconnection Regulation Subject: LUMA’s Feedback on preliminary Draft of Proposed Comprehensive Interconnection Regulation July/30/2021 2021/07/30 File
Institute for Energy Economics and Financial Analysis (IEEFA) Comments on Proposed Interconnection Subject: IEEFA Comments on Proposed Regulation July/30/2021 2021/07/30 File
Moción en Solicitud de Extensión del Término para Someter Comentario al Borrador del Reglamento de Interconexión Subject: Solicitud de Extensión  de Término para Someter Comentarios July/23/2021 2021/07/23 File
GE Renewable Energy Comments Subject: Comments July/22/2021 2021/07/22 File
Resolution and Order Subject: Consolidation of Cases No. CEPR-MI-2018-0008 and No. NEPR-MI-2019-0009, Notice of Availability of Preliminary Draft on Proposed Regulation and Request for Feedback on the Preliminary Draft July/15/2021 2021/07/15 File
Comentarios Reglamento de Interconexión (Sunrun) Subject: Comentarios Reglamento de Interconexión (Sunrun) July/05/2019 2019/07/05 File
Comentarios Reglamento de Interconexión (SESA-PR) Subject: Comentarios Reglamento de Interconexión (SESA-PR) July/05/2019 2019/07/05 File
Comentarios Reglamento de Interconexión (National) Subject: Comentarios Reglamento de Interconexión (National Public Finance Guarantee Corp.) July/05/2019 2019/07/05 File
Comentarios Reglamento de Interconexión (OIPC) Subject: Comentarios Reglamento de Interconexión (OIPC) July/05/2019 2019/07/05 File
Comentarios Reglamento de Interconexión (ACONER) Subject: Comentarios Reglamento de Interconexión (ACONER) July/05/2019 2019/07/05 File
Comentarios Reglamento de Interconexión (AEE) Subject: Comentarios Reglamento de Interconexión (Autoridad de Energía Eléctrica de Puerto Rico) July/03/2019 2019/07/03 File
Comentarios Reglamento de Interconexión (Marinsa Caribbean, LLC) Subject: Comentarios Reglamento de Interconexión (Marinsa Caribbean, LLC) July/03/2019 2019/07/03 File
Nunc Pro Tunc Subject: Modification of PREPA Interconnection Regulations and Workshops for Stakeholders May/21/2019 2019/05/21 File
Resolution and Order Subject: Modification of PREPA Interconnection Regulations and Workshops for Stakeholders May/20/2019 2019/05/20 File

Antonio Torres-Miranda is presently an Associate Commissioner for the Energy Bureau of the Puerto Rico Public Service Regulatory Board (Energy Bureau). Previously, Mr. Torres had been the Director of the Legal Advisory Division of the Energy Bureau.

Mr. Torres has a bachelor’s degree in mechanical engineering from the University of Puerto Rico. He also has a master’s degree in engineering management from the Polytechnical University of Puerto Rico. In the 1990’s he passed the exam to be a Certified Energy Manager. He is presently a member of the Puerto Rico Professional College of Engineer and Land Surveyors.

Mr. Torres graduated with honors from the Interamerican University of Puerto Rico where he obtained his Juris Doctor degree. He is presently member of the bar of the Commonwealth of Puerto Rico and is a member of the U.S. District of Puerto Rico Federal bar.

He commenced his engineering work experience with the Department of Defense in a Naval base in Virginia were he designed industrial ventilation systems. He then went to New York to work with Kennetech Energy Management were he first commenced being immersed in the energy sector. He then transferred to Puerto Rico with Kennetech in which he conducted wind studies throughout the island together with U.S. Wind Power. He continued implementation of energy management systems in several industrial companies throughout Puerto Rico until Kennetech joined forces with Enron to develop the first privately owned power plant in Puerto Rico known as EcoElectrica. This 450 MW natural gas power plant included the development of the first LNG terminal in Puerto Rico.

He also worked as a contractor with the Puerto Rico Electric Power Authority in the development of a 42 miles natural gas pipeline.

Before joining the Energy Bureau Mr. Torres developed several natural gas projects in Puerto Rico.

Ferdinand Ramos-Soegaard attained a bachelor’s degree in electrical engineering (BSEE) graduating from the Georgia Institute of Technology in Atlanta, GA in 2000. His degree specialized in power distribution and telecommunications systems.

Mr. Ramos-Soegaard is a licensed professional engineer in the Commonwealth of Puerto Rico and the state of Florida. Throughout his professional carrier Mr. Ramos has been involved in all aspects of the design, construction and maintenance of electrical distribution systems, including high voltage transmission lines and renewable energy interconnections to the Puerto Rico Electric Power Authority subtransmission grid.

Sylvia B. Ugarte Araujo holds a bachelor’s degree in industrial and Systems Engineering from the University of Florida (1998). She studied at the Inter-American University of Puerto Rico School of Law (2004) and then obtained a Master of Laws from the Inter-American University of Puerto Rico (2019). Ms. Ugarte is admitted to the practice of law and notary by the Supreme Court of Puerto Rico (2004), the Federal Court for the District of Puerto Rico, for the First Circuit of Boston (2005), the Court of Appeals of the First Circuit (2005) and the Supreme Court of Texas (2018). She was Director of the Office of Legal Counsel of the Energy Bureau of the Public Service Regulatory Board and the Designated Director of the Office of Legal Counsel of the Public Service Regulatory Board. She has served as Legal Director of the Puerto Rico Infrastructure Financing Authority and has worked with renowned law firms. She has over fifteen (15) years of vast professional experience as a trial attorney with an emphasis on commercial and construction litigation and extensive experience in administrative law. Also, as an industrial engineer she has been a consultant for government agencies in charge of large projects and in private entities.

Lillian Mateo-Santos obtained her Bachelor’s Degree in Business Administration from the University of Puerto Rico, Río Piedras Campus, in 1993 and a Juris Doctor degree from the University of Puerto Rico School of Law in 1996. In 1999, she obtained a degree of Masters of Laws (LLM) in Environmental and Energy of the Tulane University Law School. Before joining the Puerto Rico Energy Bureau, Ms. Mateo-Santos was a member of various law firms. Her private practice was focused on energy, environmental, land use and permitting matters, including administrative law litigation.

On June 5, 2019, Ms. Mateo-Santos was elected 2nd Vice President of the Southeastern Association of Regulatory Utility Commissioners (SEARUC). She is a member of the American Bar Association and is admitted to practice law and notary law in Puerto Rico, and the United States Court of Appeals for the First Circuit.

Edison Avilés-Deliz obtained his Bachelor of Science in Electrical Engineering with specialties in Power and Control Systems (BSEE) Cum Laude from the University of Puerto Rico, Mayagüez Campus in 1991 and a Juris Doctor (JD) also Cum Laude from the University of Puerto Rico School of Law in 1997. In addition, he holds Master degrees with Distinctions in Diplomacy/International Relations/Business (MA) from Norwich University in Vermont and in Energy Law from Vermont Law School (LLM).

Avilés-Deliz is a licensed engineer and member of the College of Engineers and Surveyors of Puerto Rico (CIAPR). He was president of the Disciplinary and Professional Ethics Tribunal of the CIAPR, of the Institute of Electrical Engineers of CIAPR and of the Society of Electrical Engineers of Puerto Rico. He is admitted to practice as a public notary in Puerto Rico and as a lawyer, both in the District Court of Puerto Rico and the Court of Appeals for the First Federal Circuit.

He is a member of Phi Eta Mu Fraternity, the Engineering Honor Society Tau Beta Pi, and the International Studies Honor Society Sigma Iota Rho. He is also a Senior member of the IEEE.

Antonio Torres-Miranda es actualmente Comisionado Asociado del Negociado de Energía de la Junta Reglamentadora de Servicios Públicos de Puerto Rico (Negociado de Energía). Anteriormente, el Sr. Torres había sido Director de la División de Asesoría Legal del Negociado de Energía.

El Sr. Torres tiene un bachillerato en ingeniería mecánica de la Universidad de Puerto Rico. También tiene una maestría en administración de ingeniería de la Universidad Politécnica de Puerto Rico. En la década de 1990 aprobó el examen para ser Gerente de Energía Certificado. Actualmente es miembro del Colegio de Ingenieros y Agrimensores de Puerto Rico.

El Sr. Torres se graduó con honores de la Universidad Interamericana de Puerto Rico donde obtuvo su título de Juris Doctor (JD). Actualmente es miembro del Colegio de Abogados del Estado de Puerto Rico y es miembro del Colegio de Abogados Federal del Distrito de Puerto Rico de los Estados Unidos.

Comenzó su experiencia laboral en ingeniería con el Departamento de Defensa en una base naval en Virginia donde diseñó sistemas de ventilación industrial. Luego se fue a Nueva York para trabajar con Kennetech Energy Management, donde comenzó a sumergirse en el sector energético. Luego se transfirió a Puerto Rico con Kennetech, donde realizó estudios eólicos en toda la isla U.S. Wind Power. Continuó con la implementación de sistemas de administración de energía en varias empresas industriales en todo Puerto Rico hasta que Kennetech unió fuerzas con Enron para desarrollar la primera planta de energía de propiedad privada en Puerto Rico conocida como EcoEléctrica. Esta planta de energía de gas natural de 450 MW incluyó el desarrollo de la primera terminal de GNL en Puerto Rico.

También trabajó como contratista con la Autoridad de Energía Eléctrica de Puerto Rico en el desarrollo de una tubería de gas natural de 42 millas.

Antes de unirse al Negociado de Energía, el Sr. Torres desarrolló varios proyectos de gas natural en Puerto Rico.

La Lcda. Sylvia B. Ugarte Araujo posee un Bachillerato en Ingeniería Industrial y de Sistemas de la Universidad de la Florida (1998). Estudió en la Escuela de Derecho de la Universidad Interamericana de Puerto Rico (2004) y luego obtuvo una Maestría en Derecho de la Universidad Interamericana de Puerto Rico (2019). La Lcda. Ugarte está admitida a la práctica de la abogacía y la notaría por el Tribunal Supremo de Puerto Rico (2004), al Tribunal Federal, Distrito de Puerto Rico, al Primer Circuito Federal de Boston (2005), al Tribunal de Apelaciones del Primer Circuito (2005) y al Tribunal Supremo de la jurisdicción del estado de Texas (2018). Fue Directora de la Oficina de Asesoramiento Legal del Negociado de Energía de la Junta Reglamentadora de Servicio Público y la Directora Designada de la Oficina de Asesoramiento Legal de la Junta Reglamentadora de Servicio Público. Ha ejercido como Directora Legal de la Autoridad para el Financiamiento de la Infraestructura de Puerto Rico y ha trabajado con bufetes de abogado de renombre. Tiene sobre quince (15) años de vasta experiencia profesional como abogada litigante con énfasis en litigio comercial y construcción y una amplia experiencia en derecho administrativo. Así también, como ingeniera industrial ha sido consultora para agencias gubernamentales encargadas de proyectos de envergadura y en entidades privadas.

Ferdinand A. Ramos-Soegaard obtuvo su Bachillerato en Ciencias en Ingeniería Eléctrica (BSEE, por sus siglas en inglés) del Georgia Institute of Technology en Atlanta, GA en el 2000, con especialidad en sistemas de distribución de potencia y telecomunicaciones.

Ramos-Soegaard es ingeniero licenciado en el Estado Libre Asociado de Puerto Rico y en el Estado de Florida. A través de su carrera profesional, Ramos-Soegaard ha estado envuelto en todos los aspectos del diseño, construcción y mantenimiento de sistemas de distribución eléctrica, incluyendo líneas de transmisión de alto voltaje e interconexiones de sistemas de energía renovable a la red de subtransmisión de la Autoridad de Energía Eléctrica de Puerto Rico.

Lillian Mateo-Santos obtuvo su Bachillerato en Administración de Empresas de la Universidad de Puerto Rico, Recinto de Río Piedras en 1993 y el grado de Juris Doctor de la Facultad de Derecho de la Universidad de Puerto Rico en 1996. En 1999 obtuvo una Maestría en Derecho (LLM) en Ambiental y Energía de la Facultad de Derecho de la Universidad de Tulane. Antes de formar parte del Negociado de Energía de Puerto Rico, la Lic. Mateo-Santos fue miembro de varios bufetes de abogados. Su práctica privada se enfocó en asuntos de energía, ambiental, uso de terrenos y permisos, incluyendo litigación de derecho administrativo.

El 5 de junio de 2019, la Lic. Mateo-Santos fue elegida 2nda Vice Presidenta del Southern Association of Regulatory Utility Commissioners (SEARUC). Es miembro de la American Bar Association y está admitida para ejercer como abogado y notario público en Puerto Rico, y en el Tribunal de Apelaciones para el Primer Circuito Federal.

Edison Avilés-Deliz obtuvo su bachillerato Cum Laude en Ingeniería Eléctrica con especialidades en Sistemas de Controles y Potencia (BSEE) de la Universidad de Puerto Rico, Recinto de Mayagüez en 1991 y un Juris Doctor (JD) también Cum Laude de la Facultad de Derecho de la Universidad de Puerto Rico en 1997. Además, ostenta maestrías con Distinciones en Diplomacia/Relaciones Internacionales/Negocios (MA) de la Universidad de Norwich en Vermont y en Derecho en Energía de la Universidad de Derecho de Vermont (LLM).

Avilés-Deliz es ingeniero licenciado y miembro del Colegio de Ingenieros y Agrimensores de Puerto Rico (CIAPR). Fue presidente del Tribunal Disciplinario y de Ética Profesional del CIAPR, del Instituto de Ingenieros Electricistas del CIAPR y de la Sociedad de Ingenieros Electricistas de Puerto Rico. Está admitido para ejercer como notario público en Puerto Rico y como abogado, tanto en el Tribunal de Distrito de Puerto Rico como el Tribunal de Apelaciones para el Primer Circuito Federal.