Expedientes

Expediente: NEPR-MI-2021-0013
In Re: Despliegue de Infraestructura de Cargadores para Vehículos Eléctricos
Documentos Publicados: 100
Documentos Fecha Orden Descargar
Motion to Submit Responses of Information in Energy Bureau order of August 26, 2024 Subject: Motion to Submit Responses of Information in Energy Bureau order of August 26, 2024 05/septiembre/2024 2024/09/05 File
Motion to Submit Second Semi-Annual Report for Fiscal Year 2024 in Compliance with Orders of January 13, 2023, and April 23, 2024 Subject: IN RE: Electric Vehicle Charging Infrastructure Deployment 30/agosto/2024 2024/08/30 File
Resolution and Order Subject: Supplementary Filing on Implementation of EV TOU Rates for NEM Customers. 26/agosto/2024 2024/08/26 File
Supplementary Filing Regarding Barriers to Implementation of Interim EV-TOU Pilot Program Rate for NEM Customers and Request for Approval of Short-Term Proposals Subject: IN RE: Electric Vehicle Charging Infraestructure Deployment 02/agosto/2024 2024/08/02 File
Notice of Barriers to Implementation of Interim EV-Tou Pilot Program Rate for New Customers Subject: IN RE: Electric Vehicle Charging Infrastructure Deployment 26/julio/2024 2024/07/26 File
Motion Re-Submitting the Spanish EV TOU RATE Tariff Sheet Subject: Motion Re-Submitting the Spanish EV TOU RATE Tariff Sheet 15/julio/2024 2024/07/15 File
Motion to Submit Revised EV TOU Tariff Sheet and Responses to Request for Information in Compliance with Order of May 22, 2024 and Inform on Compliance with Requirement to Submit Revised Model Bill Subject: MI-2021-0013 Attachment 2 to the Exhibit 2-EV TOU + NEM Scenarios at 625 kWh Final 03/junio/2024 2024/06/03 File
Motion to Submit Revised EV TOU Tariff Sheet and Responses to Request for Information in Compliance with Order of May 22, 2024 and Inform on Compliance with Requirement to Submit Revised Model Bill Subject: Motion to Submit Revised EV TOU Tariff Sheet and Responses to Request for Information in Compliance with Order of May 22, 2024 and Inform on Compliance […] 03/junio/2024 2024/06/03 File
Motion to Submit Corrected Exhibit 1 Motion to Submit a Revised Semi-Annual Report in Compliance with Order of April 23, 2024. Subject: Motion to Submit Corrected Exhibit 1 Motion to Submit a Revised Semi-Annual Report in Compliance with Order of April 23, 2024. 24/mayo/2024 2024/05/24 File
Motion to Submit a Revised Semi – Annual Report in Compliance with Order of April 23, 2024. Subject: Motion to Submit a Revised Semi – Annual Report in Compliance with Order of April 23, 2024. 24/mayo/2024 2024/05/24 File
Resolution and Order Subject: Motion Re-Submitting the Tariff Sheet for the Interim EV TOU Rate and Informative Motion Regarding Launch of EV TOU Rate and Request for Release from Requirement […] 22/mayo/2024 2024/05/22 File
Motion to Submit May 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit May 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 08/mayo/2024 2024/05/08 File
Informative Motion Regarding Launch of Interim EV TOU Rate and Request for Release from Requirements to File Billing Integration Reports Subject: Informative Motion Regarding Launch of Interim EV TOU Rate and Request for Release from Requirements to File Billing Integration Reports 30/abril/2024 2024/04/30 File
Motion Re-Submitting the Tariff Sheet for the New Interim EV TOU RATE Subject: Motion Re-Submitting the Tariff Sheet for the New Interim EV TOU RATE 29/abril/2024 2024/04/29 File
Resolution and Order Subject: Motion to Submit Semi-annual Report in Compliance with Order of January 13, 2023 23/abril/2024 2024/04/23 File
Motion to Submit April 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023, and Inform of the Tarif Sheet for the Interim EV TOU Rate and Customer Outreach Progress Subject: Motion to Submit April 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023, and Inform of the Tarif Sheet for […] 08/abril/2024 2024/04/08 File
Motion to Submit March 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit March 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 07/marzo/2024 2024/03/07 File
Resolution and Order Subject: Motion to Update Timeline to Commence Billing Integrating Interim EV TOU Rate. 01/marzo/2024 2024/03/01 File
 Motion to Submit Semi-Annual Report in Compliance with Order of January 13, 2023 Subject: Motion to Submit Semi-Annual Report in Compliance with Order of January 13, 2023 29/febrero/2024 2024/02/29 File
Resolution and Order Subject: Motion to Submit Presentation Offered During Hybrid Technical Conference of February 1, 2024 Regarding LUMA’s Customer Outreach Memorandum 12/febrero/2024 2024/02/12 File
Motion to Submit February 2024 Billing Integration Report In Compliance with Orders of January 13 and February 14 2023 Subject: Motion to Submit February 2024 Billing Integration Report In Compliance with Orders of January 13 and February 14 2023 06/febrero/2024 2024/02/06 File
Motion to Submit Presentation Offered During Hybrid Technical Conference of February 1, 2024 Regarding LUMA’s Customer Outreach Memorandum Subject: Motion to Submit Presentation Offered During Hybrid Technical Conference of February 1, 2024 Regarding LUMA’s Customer Outreach Memorandum. 01/febrero/2024 2024/02/01 File
Motion to Submit Presentation Offered During Hybrid Technical Conference of February 1, 2024 Regarding LUMA’s Customer Outreach Memorandum   Subject: Motion to Submit Presentation Offered During Hybrid Technical Conference of February 1, 2024, Regarding LUMA’s Customer Outreach Memorandum 01/febrero/2024 2024/02/01 File
Motion to Update Timeline to Commence Billing Integrating Interim Ev Tou Rate Subject: Motion to Update Timeline to Commence Billing Integrating Interim Ev Tou Rate 01/febrero/2024 2024/02/01 File
Resolution and Order Subject: Motion to Submit Customer Outreach Memorandum in Compliance with Resolutions and Orders of January 13, 2023 as Modified by Resolutions and Orders of March 29, 2023, […] 12/enero/2024 2024/01/12 File
Motion to Submit January 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit January 2024 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 08/enero/2024 2024/01/08 File
 Notice of Withdrawal as Attorney of Record Subject: Notice of Withdrawal as Attorney of Record 08/enero/2024 2024/01/08 File
Motion to Submit Report on Customer Outreach Memorandum in Compliance with Resolutions and Orders of January 13, 2023, as Modified by Resolutions and Orders of March 29,2023, June 6, 2023, and August 11,2023.  Subject: Motion to Submit Customer Outreach Memorandum in Compliance with Resolutions and Orders of January 13, 2023, as Modified by Resolutions and Orders of March 29,2023, June […] 02/enero/2024 2024/01/02 File
Resolution and Order Subject: Resolution and Order for the Motion Informing Status of Billing Integrating Interim EV TOU Rate and Request for Extension of Time to Complete such Milestone 20/diciembre/2023 2023/12/20 File
Motion to Submit December 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit December 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 08/diciembre/2023 2023/12/08 File
Motion Informing Status of Billing Integrating Interim EV TOU Rate and Request for Extension of Time to Complete such Milestone Subject: Motion Informing Status of Billing Integrating Interim EV TOU Rate and Request for Extension of Time to Complete such Milestone 30/noviembre/2023 2023/11/30 File
Motion to Submit Report on Actions Regarding Federal Funding Opportunities in Compliance with Resolution and Order Dated June 6, 2023 and August 11, 2023 Subject: Attachment A to Exh. 1 Federal Funding Report 13/noviembre/2023 2023/11/13 File
Motion to Submit Report on Actions Regarding Federal Funding Opportunities in Compliance with Resolution and Order Dated June 6, 2023 and August 11, 2023 Subject: Motion to Submit Report on Actions Regarding Federal Funding Opportunities in Compliance with Resolution and Order Dated June 6, 2023 and August 11, 2023 13/noviembre/2023 2023/11/13 File
Motion to Submit November 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit November 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 08/noviembre/2023 2023/11/08 File
Motion to Submit November 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit November 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 08/noviembre/2023 2023/11/08 File
Motion to Submit October 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit October 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 10/octubre/2023 2023/10/10 File
Resolution and Order Subject: Motion to Submit Progress Report on DDEC Study in compliance with Resolution and Order of August 11, 2023, and request for Change in Reporting Frequency. 12/septiembre/2023 2023/09/12 File
Motion to Submit September 2023 Billing Integration Report In Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit September 2023 Billing Integration Report In Compliance with Orders of January 13 and February 14, 2023 11/septiembre/2023 2023/09/11 File
Motion to Submit Progress Report on DDEC Study in Compliance with Resolution and Order of August 11, 2023, and Request for Change in Reporting Frequency Subject: Motion to Submit Progress Report on DDEC Study in Compliance with Resolution and Order of August 11, 2023, and Request for Change in Reporting Frequency 31/agosto/2023 2023/08/31 File
Resolution and Order Subject: Motion to Request Clarification of Resolution and Order of June 6,2023 11/agosto/2023 2023/08/11 File
Motion to Submit August 2023 Billing Integration Report In Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit August 2023 Billing Integration Report In Compliance with Orders of January 13 and February 14, 2023 10/agosto/2023 2023/08/10 File
Motion Submitting Responses to Requests for Information in Compliance with Resolution and Order of August 3, 2023, Request for Confidentiality and Supporting Memorandum of Law Subject: Motion Submitting Responses to Requests for Information in Compliance with Resolution and Order of August 3, 2023, Request for Confidentiality and Supporting Memorandum of Law 08/agosto/2023 2023/08/08 File
Notice of Appearance and Request for Notice Subject: Notice of Appearance and Request for Notice 07/agosto/2023 2023/08/07 File
Resolution and Order Subject: LUMA’s July 11, 2023 Motion submitting July 2023 Billing Integration Report 03/agosto/2023 2023/08/03 File
Motion to Request Clarification of Resolution and Order of June 6, 2023 Subject: Motion to Request Clarification of Resolution and Order of June 6, 2023 13/julio/2023 2023/07/13 File
Motion to Submit July 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit July 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 11/julio/2023 2023/07/11 File
Motion to Submit June 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023  Subject: Motion to Submit June 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 12/junio/2023 2023/06/12 File
Resolution and Order Subject: Final Phase I EV Plan and Revised EV Rate Design 06/junio/2023 2023/06/06 File
Motion to Submit May 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit May 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 12/mayo/2023 2023/05/12 File
Motion to Submit Final Phase I EV Plan in Compliance with Resolution and Order of January 13,2023 Subject: Motion to Submit Final Phase I EV Plan in Compliance with Resolution and Order of January 13,2023 01/mayo/2023 2023/05/01 File
Motion to Submit April 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 Subject: Motion to Submit April 2023 Billing Integration Report in Compliance with Orders of January 13 and February 14, 2023 12/abril/2023 2023/04/12 File
Resolution and Order Subject: Draft Phase I EV Plan and Revised EV Rate Design Motion to Amend Certain Deadlines 29/marzo/2023 2023/03/29 File
Motion to Submit Billing Integration Report and Request to Modify Reporting Frequency Subject: Motion to Submit Billing Integration Report and Request to Modify Reporting Frequency 13/marzo/2023 2023/03/13 File
Escrito Notificando Intervención de la Oficina Independiente de Protección al Consumidor Subject: Escrito Notificando Intervención de la OIPC 07/marzo/2023 2023/03/07 File
Motion Submitting Explanation Regarding Rate Implementation Support RFP, In Compliance with Resolution and Order of February 14, 2023 Subject: Explanation Regarding Rate Implementation Support RFP, In Compliance with Resolution and Order of February 14, 2023 01/marzo/2023 2023/03/01 File
Motion Submitting Project Schedule in Compliance with Resolution and Order of January 13, 2023 and Requesting Modification of Certain Deadlines Thereunde Subject: Motion Submitting Project Schedule in Compliance with Resolution and Order of January 13, 2023 and Requesting Modification of Certain Deadlines Thereunder 17/febrero/2023 2023/02/17 File
Resolution an Order Subject: Draft Phase I EV Plan and Revised EV Rate Design 14/febrero/2023 2023/02/14 File
Motion Requesting Brief Extension to File Project Schedule Required by Resolution and Order of January 13, 2023 and Submitting Progress Report due Feb 13, 2022 and Information on Status of RFP Due Feb 15, 2023, Respectively, Under Such Resolution and Order Subject: Motion Requesting Brief Extension to File Project Schedule Required by Resolution and Order of January 13, 2023 and Submitting Progress Report due Feb 13, 2022 and […] 09/febrero/2023 2023/02/09 File
CAMBIO Filing of Electric Vehicle Integration Analysis Subject: CAMBIO Filing of Electric Vehicle Integration Analysis 31/enero/2023 2023/01/31 File
Resolution Nunc Pro Tunc Subject: Draft Phase I EV Plan and Revised EV Rate Design 13/enero/2023 2023/01/13 File
Resolution and Order Subject: Draft Phase I EV Plan and Revised EV Rate Design 13/enero/2023 2023/01/13 File
Resolution Subject: Re-Submittal of Exhibit 1 filed on September 1, 2022 with Technical Repairs; Request for Substitution of Original Exhibit 1; and Request to Postpone Compliance Technical Hearing […] 07/septiembre/2022 2022/09/07 File
Motion Re-submitting Exhibit 1 Filed on September 1, 2022 with Technical Repairs and Requesting Substitution of Original Exhibit  Subject: Re-submittal of Exhibit 1 Filed on September 1, 2022 with Technical Repairs and Request for Substitution of Original Exhibit 02/septiembre/2022 2022/09/02 File
Motion Submitting Draft Phase I EV Plan and Request to Postpone Compliance Technical Hearing NO. 3 and Concomitant Deadline to Submit Revised Phase I EV Plan Subject: Motion Submitting Draft Phase I EV Plan and Request to Postpone Compliance Technical Hearing NO. 3 and Concomitant Deadline to Submit Revised Phase I EV Plan 01/septiembre/2022 2022/09/01 File
Motion Submitting Revised EV Rate Design Proposal Subject: Submittal of Revised EV Rate Design Proposal 21/julio/2022 2022/07/21 File
Motion Requesting Confirmation on Matters Addressed in Compliance Technical Hearing Held on June 15, 2022 and Stay of Order Establishing Deadline to Submit Revises EV Rate Design Proposal Subject: Request for Confirmation on Matters Addressed in Compliance Technical Hearing No. 2 Held on June 15, 2022 and Stay of Order Establishing Deadline to Submit Revises […] 27/junio/2022 2022/06/27 File
Motion to Submitting Luma’s Presentation for Compliance Technical Scheduled for June 15, 2022 Subject: Submittal of Luma’s Presentation for Compliance Technical Scheduled for June 15, 2022 15/junio/2022 2022/06/15 File
Resolution and Order Subject: Jurisdiction over Electric Vehicle Charging Stations 03/junio/2022 2022/06/03 File
Motion Submitting Drat of EV Rate Design Proposal Subject: Submittal of Draft of EV Rate Design Proposal 31/mayo/2022 2022/05/31 File
Proposal PR EV Charging Plan – FEP NovaCharge Subject: Fuller Equity Partners, LLC PR y Otros-Proposal PR EV Charging Plan – FEP NovaCharge 31/mayo/2022 2022/05/31 File
Resolution and Order Subject: Amended Calendar for Filing and Compliance Technical Hearings No. 2 and No. 3 19/mayo/2022 2022/05/19 File
3rd Technical Workshop (May 11, 2022) Subject: Discussion 26/abril/2022 2022/04/26 File
3rd Technical Workshop (May 11, 2022) Subject: Agenda 26/abril/2022 2022/04/26 File
Resolution and Order Subject: Amended Calendar for Schedule Third Technical Workshop 29/marzo/2022 2022/03/29 File
Motion in Compliance with Resolution and Order of March 11, 2022 Subject: Motion in Compliance with Resolution and Order of March 11, 2022 24/marzo/2022 2022/03/24 File
Resolution and Order Subject: March 4, 2022 Compliance Technical Hearing No. 1 Bench Order 14/marzo/2022 2022/03/14 File
Motion to Submit Presentation for First Compliance Hearing in Compliance with Resolution and Order Subject: Motion to Submit Presentation for First Compliance Hearing in Compliance with Resolution and Order 24/febrero/2022 2022/02/24 File
Resolution and Order Subject: Amended Calendar for Compliance Technical Hearing No. 1 and Schedule Third Technical Workshop 22/febrero/2022 2022/02/22 File
Presentation Technical Conference #2 Load Variability, Resources, EV Implications Discussion slides Subject: Presentation Technical Conference #2 (January 27 ,2022) 27/enero/2022 2022/01/27 File
Motion to Submit Presentation Given by LUMA During Technical Workshop Held on January 27, 2022 Subject: Motion to Submit Presentation Given by LUMA During Technical Workshop Held on January 27, 2022 27/enero/2022 2022/01/27 File
Taller EV – Presentación de Chris Nelder Subject: Taller EV – Presentación 27/enero/2022 2022/01/27 File
Motion in Compliance with Resolution and Order of December 17, 2021 Subject: Motion in Compliance with Order 25/enero/2022 2022/01/25 File
Motion Requesting that LUMA’s Comments in this Proceeding be taken into Consideration in Connection with the Principles for Initiating EV Infrastructure Deployment Subject: Request that Comments in this Proceeding be taken into Consideration in Connection with the Principles for EV Infrastructure Deployment 21/enero/2022 2022/01/21 File
Agenda – Second EV Technical Workshop (January 27, 2022) Subject: The Deployment of EV Charging Infrastructure 20/enero/2022 2022/01/20 File
Written Comments of Tesla, Inc. Subject: Written Comments of Tesla, Inc. 20/enero/2022 2022/01/20 File
Written Comments by Evergo Puerto Rico LLC Regarding Electric Vehicles Charging Infraestructure Subject: Written Comments by Evengo Puerto Rico LLC 20/enero/2022 2022/01/20 File
Resolution and Order Subject: LUMA Comments and Workshop contents 17/diciembre/2021 2021/12/17 File
Resolution and Order Subject: Principles for Initiating EV Infrastructure Deployment 18/noviembre/2021 2021/11/18 File
Motion to Submit LUMA’s Written Comments on Electric Vehicles Charging Infrastructure Topic Subject: Submittal of LUMA’s Written Comments 05/noviembre/2021 2021/11/05 File
Declaraciones Escritas sobre la Postura del Programa de Política Pública Energética sobre el Despliegue de Infraestructura de Cargadores para Vehículos Eléctricos Subject: Deslaraciones del Programa de Política Pública Energética del Departamento de Desarrollo Económico y Comercio 08/octubre/2021 2021/10/08 File
OIPC-Comentarios Despliegue de nfraestructura de Cargadores para Vehículos Eléctricos Subject: Oficina Independiente de Protección al Consumidor -Comentarios 07/octubre/2021 2021/10/07 File
Written Comments of Tesla, Inc. Subject: Written Comments of Tesla, Inc. 07/octubre/2021 2021/10/07 File
CAMBIO-Comments on electric vehicle deployment Subject: Comments 07/octubre/2021 2021/10/07 File
CPEPR-Comentarios Despliegue de Infraestructura de Cargadores para Vehículos Eléctricos Subject: Colegio de Peritos Electricista de Puerto Rico-Comentarios Despliegue de Infraestructura de Cargadores para Vehículos Eléctricos 06/octubre/2021 2021/10/06 File
Request for Extension of Time to Submit Written Comments Subject: Request for Extension of Time to Submit Written Comments 06/octubre/2021 2021/10/06 File
Comentarios-Ángel D. RodrÍguez Subject: Comentarios-Ángel D. RodrÍguez 02/octubre/2021 2021/10/02 File
Electric Vehicles Presentation Subject: Taller de Partes Interesadas (Presentación 23 de septiembre de 2021) 23/septiembre/2021 2021/09/23 File
Presentación de Taller de Partes Interesadas Autos Eléctricos: Impacto a la Infraestructura Eléctrica para el año 2035 Subject: Presentación de Taller de Partes Interesadas Autos Eléctricos: Impacto a la Infraestructura Eléctrica para el año 2035 23/septiembre/2021 2021/09/23 File
Escrito Urgente Notificando la Intervención del CPEPR Subject: Escrito Urgente Notificando la Intervención del CPEP 16/septiembre/2021 2021/09/16 File
Resolución Subject: Taller de Partes Interesadas y Comentarios Públicos 26/agosto/2021 2021/08/26 File

Antonio Torres-Miranda is presently an Associate Commissioner for the Energy Bureau of the Puerto Rico Public Service Regulatory Board (Energy Bureau). Previously, Mr. Torres had been the Director of the Legal Advisory Division of the Energy Bureau.

Mr. Torres has a bachelor’s degree in mechanical engineering from the University of Puerto Rico. He also has a master’s degree in engineering management from the Polytechnical University of Puerto Rico. In the 1990’s he passed the exam to be a Certified Energy Manager. He is presently a member of the Puerto Rico Professional College of Engineer and Land Surveyors.

Mr. Torres graduated with honors from the Interamerican University of Puerto Rico where he obtained his Juris Doctor degree. He is presently member of the bar of the Commonwealth of Puerto Rico and is a member of the U.S. District of Puerto Rico Federal bar.

He commenced his engineering work experience with the Department of Defense in a Naval base in Virginia were he designed industrial ventilation systems. He then went to New York to work with Kennetech Energy Management were he first commenced being immersed in the energy sector. He then transferred to Puerto Rico with Kennetech in which he conducted wind studies throughout the island together with U.S. Wind Power. He continued implementation of energy management systems in several industrial companies throughout Puerto Rico until Kennetech joined forces with Enron to develop the first privately owned power plant in Puerto Rico known as EcoElectrica. This 450 MW natural gas power plant included the development of the first LNG terminal in Puerto Rico.

He also worked as a contractor with the Puerto Rico Electric Power Authority in the development of a 42 miles natural gas pipeline.

Before joining the Energy Bureau Mr. Torres developed several natural gas projects in Puerto Rico.

Ferdinand Ramos-Soegaard attained a bachelor’s degree in electrical engineering (BSEE) graduating from the Georgia Institute of Technology in Atlanta, GA in 2000. His degree specialized in power distribution and telecommunications systems.

Mr. Ramos-Soegaard is a licensed professional engineer in the Commonwealth of Puerto Rico and the state of Florida. Throughout his professional carrier Mr. Ramos has been involved in all aspects of the design, construction and maintenance of electrical distribution systems, including high voltage transmission lines and renewable energy interconnections to the Puerto Rico Electric Power Authority subtransmission grid.

Sylvia B. Ugarte Araujo holds a bachelor’s degree in industrial and Systems Engineering from the University of Florida (1998). She studied at the Inter-American University of Puerto Rico School of Law (2004) and then obtained a Master of Laws from the Inter-American University of Puerto Rico (2019). Ms. Ugarte is admitted to the practice of law and notary by the Supreme Court of Puerto Rico (2004), the Federal Court for the District of Puerto Rico, for the First Circuit of Boston (2005), the Court of Appeals of the First Circuit (2005) and the Supreme Court of Texas (2018). She was Director of the Office of Legal Counsel of the Energy Bureau of the Public Service Regulatory Board and the Designated Director of the Office of Legal Counsel of the Public Service Regulatory Board. She has served as Legal Director of the Puerto Rico Infrastructure Financing Authority and has worked with renowned law firms. She has over fifteen (15) years of vast professional experience as a trial attorney with an emphasis on commercial and construction litigation and extensive experience in administrative law. Also, as an industrial engineer she has been a consultant for government agencies in charge of large projects and in private entities.

Lillian Mateo-Santos obtained her Bachelor’s Degree in Business Administration from the University of Puerto Rico, Río Piedras Campus, in 1993 and a Juris Doctor degree from the University of Puerto Rico School of Law in 1996. In 1999, she obtained a degree of Masters of Laws (LLM) in Environmental and Energy of the Tulane University Law School. Before joining the Puerto Rico Energy Bureau, Ms. Mateo-Santos was a member of various law firms. Her private practice was focused on energy, environmental, land use and permitting matters, including administrative law litigation.

On June 5, 2019, Ms. Mateo-Santos was elected 2nd Vice President of the Southeastern Association of Regulatory Utility Commissioners (SEARUC). She is a member of the American Bar Association and is admitted to practice law and notary law in Puerto Rico, and the United States Court of Appeals for the First Circuit.

Edison Avilés-Deliz obtained his Bachelor of Science in Electrical Engineering with specialties in Power and Control Systems (BSEE) Cum Laude from the University of Puerto Rico, Mayagüez Campus in 1991 and a Juris Doctor (JD) also Cum Laude from the University of Puerto Rico School of Law in 1997. In addition, he holds Master degrees with Distinctions in Diplomacy/International Relations/Business (MA) from Norwich University in Vermont and in Energy Law from Vermont Law School (LLM).

Avilés-Deliz is a licensed engineer and member of the College of Engineers and Surveyors of Puerto Rico (CIAPR). He was president of the Disciplinary and Professional Ethics Tribunal of the CIAPR, of the Institute of Electrical Engineers of CIAPR and of the Society of Electrical Engineers of Puerto Rico. He is admitted to practice as a public notary in Puerto Rico and as a lawyer, both in the District Court of Puerto Rico and the Court of Appeals for the First Federal Circuit.

He is a member of Phi Eta Mu Fraternity, the Engineering Honor Society Tau Beta Pi, and the International Studies Honor Society Sigma Iota Rho. He is also a Senior member of the IEEE.

Antonio Torres-Miranda es actualmente Comisionado Asociado del Negociado de Energía de la Junta Reglamentadora de Servicios Públicos de Puerto Rico (Negociado de Energía). Anteriormente, el Sr. Torres había sido Director de la División de Asesoría Legal del Negociado de Energía.

El Sr. Torres tiene un bachillerato en ingeniería mecánica de la Universidad de Puerto Rico. También tiene una maestría en administración de ingeniería de la Universidad Politécnica de Puerto Rico. En la década de 1990 aprobó el examen para ser Gerente de Energía Certificado. Actualmente es miembro del Colegio de Ingenieros y Agrimensores de Puerto Rico.

El Sr. Torres se graduó con honores de la Universidad Interamericana de Puerto Rico donde obtuvo su título de Juris Doctor (JD). Actualmente es miembro del Colegio de Abogados del Estado de Puerto Rico y es miembro del Colegio de Abogados Federal del Distrito de Puerto Rico de los Estados Unidos.

Comenzó su experiencia laboral en ingeniería con el Departamento de Defensa en una base naval en Virginia donde diseñó sistemas de ventilación industrial. Luego se fue a Nueva York para trabajar con Kennetech Energy Management, donde comenzó a sumergirse en el sector energético. Luego se transfirió a Puerto Rico con Kennetech, donde realizó estudios eólicos en toda la isla U.S. Wind Power. Continuó con la implementación de sistemas de administración de energía en varias empresas industriales en todo Puerto Rico hasta que Kennetech unió fuerzas con Enron para desarrollar la primera planta de energía de propiedad privada en Puerto Rico conocida como EcoEléctrica. Esta planta de energía de gas natural de 450 MW incluyó el desarrollo de la primera terminal de GNL en Puerto Rico.

También trabajó como contratista con la Autoridad de Energía Eléctrica de Puerto Rico en el desarrollo de una tubería de gas natural de 42 millas.

Antes de unirse al Negociado de Energía, el Sr. Torres desarrolló varios proyectos de gas natural en Puerto Rico.

La Lcda. Sylvia B. Ugarte Araujo posee un Bachillerato en Ingeniería Industrial y de Sistemas de la Universidad de la Florida (1998). Estudió en la Escuela de Derecho de la Universidad Interamericana de Puerto Rico (2004) y luego obtuvo una Maestría en Derecho de la Universidad Interamericana de Puerto Rico (2019). La Lcda. Ugarte está admitida a la práctica de la abogacía y la notaría por el Tribunal Supremo de Puerto Rico (2004), al Tribunal Federal, Distrito de Puerto Rico, al Primer Circuito Federal de Boston (2005), al Tribunal de Apelaciones del Primer Circuito (2005) y al Tribunal Supremo de la jurisdicción del estado de Texas (2018). Fue Directora de la Oficina de Asesoramiento Legal del Negociado de Energía de la Junta Reglamentadora de Servicio Público y la Directora Designada de la Oficina de Asesoramiento Legal de la Junta Reglamentadora de Servicio Público. Ha ejercido como Directora Legal de la Autoridad para el Financiamiento de la Infraestructura de Puerto Rico y ha trabajado con bufetes de abogado de renombre. Tiene sobre quince (15) años de vasta experiencia profesional como abogada litigante con énfasis en litigio comercial y construcción y una amplia experiencia en derecho administrativo. Así también, como ingeniera industrial ha sido consultora para agencias gubernamentales encargadas de proyectos de envergadura y en entidades privadas.

Ferdinand A. Ramos-Soegaard obtuvo su Bachillerato en Ciencias en Ingeniería Eléctrica (BSEE, por sus siglas en inglés) del Georgia Institute of Technology en Atlanta, GA en el 2000, con especialidad en sistemas de distribución de potencia y telecomunicaciones.

Ramos-Soegaard es ingeniero licenciado en el Estado Libre Asociado de Puerto Rico y en el Estado de Florida. A través de su carrera profesional, Ramos-Soegaard ha estado envuelto en todos los aspectos del diseño, construcción y mantenimiento de sistemas de distribución eléctrica, incluyendo líneas de transmisión de alto voltaje e interconexiones de sistemas de energía renovable a la red de subtransmisión de la Autoridad de Energía Eléctrica de Puerto Rico.

Lillian Mateo-Santos obtuvo su Bachillerato en Administración de Empresas de la Universidad de Puerto Rico, Recinto de Río Piedras en 1993 y el grado de Juris Doctor de la Facultad de Derecho de la Universidad de Puerto Rico en 1996. En 1999 obtuvo una Maestría en Derecho (LLM) en Ambiental y Energía de la Facultad de Derecho de la Universidad de Tulane. Antes de formar parte del Negociado de Energía de Puerto Rico, la Lic. Mateo-Santos fue miembro de varios bufetes de abogados. Su práctica privada se enfocó en asuntos de energía, ambiental, uso de terrenos y permisos, incluyendo litigación de derecho administrativo.

El 5 de junio de 2019, la Lic. Mateo-Santos fue elegida 2nda Vice Presidenta del Southern Association of Regulatory Utility Commissioners (SEARUC). Es miembro de la American Bar Association y está admitida para ejercer como abogado y notario público en Puerto Rico, y en el Tribunal de Apelaciones para el Primer Circuito Federal.

Edison Avilés-Deliz obtuvo su bachillerato Cum Laude en Ingeniería Eléctrica con especialidades en Sistemas de Controles y Potencia (BSEE) de la Universidad de Puerto Rico, Recinto de Mayagüez en 1991 y un Juris Doctor (JD) también Cum Laude de la Facultad de Derecho de la Universidad de Puerto Rico en 1997. Además, ostenta maestrías con Distinciones en Diplomacia/Relaciones Internacionales/Negocios (MA) de la Universidad de Norwich en Vermont y en Derecho en Energía de la Universidad de Derecho de Vermont (LLM).

Avilés-Deliz es ingeniero licenciado y miembro del Colegio de Ingenieros y Agrimensores de Puerto Rico (CIAPR). Fue presidente del Tribunal Disciplinario y de Ética Profesional del CIAPR, del Instituto de Ingenieros Electricistas del CIAPR y de la Sociedad de Ingenieros Electricistas de Puerto Rico. Está admitido para ejercer como notario público en Puerto Rico y como abogado, tanto en el Tribunal de Distrito de Puerto Rico como el Tribunal de Apelaciones para el Primer Circuito Federal.

Pertenece a la fraternidad Phi Eta Mu, a la Sociedad de Honor de Ingeniería Tau Beta Pi, a la Sociedad de Honor de Estudios Internacionales Sigma Iota Rho. También es miembro senior de la IEEE.