Resolution and Order
Asunto: Request of Amendments of Clean Flexible Energy, LLC ESSAs and PPOAs.
|
05/diciembre/2024
|
2024/12/05
|
Documento
|
Resolution and Order
Asunto: Approval of two additional energy storage service agreements (ESSAs)
|
05/diciembre/2024
|
2024/12/05
|
Documento
|
Motion to Submit Amendments for the Review and Approval of Certain PPOA and ESSAS By the Energy Bureau
Asunto: Motion to Submit Amendments for the Review and Approval of Certain PPOA and ESSAS By the Energy Bureau
|
21/noviembre/2024
|
2024/11/21
|
Documento
|
Resolution and Order
Asunto: Request of Amendments of Clean Flexible Energy, LLC ESSAs and PPOAs.
|
06/noviembre/2024
|
2024/11/06
|
Documento
|
Motion in Compliance with the Resolution and Order Dated October 3rd, 2024
Asunto: IN RE: The Implementation of the Puerto Rico Electric Power Authority Integrated Resource Plan and Modified Action Plan
|
30/octubre/2024
|
2024/10/30
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan Cancellation of Tranche 3 Solicitation.
|
23/octubre/2024
|
2024/10/23
|
Documento
|
Resolution and Order
Asunto: Request of Amendments of Clean Flexible Energy, LLC ESSAs and PPOAs.
|
03/octubre/2024
|
2024/10/03
|
Documento
|
Motion to Submit Revised Amendments and PPOAs of Clean Flexible Energy LLC for Review and Approval by the Energy Bureau
Asunto: Motion to Submit Revised Amendments and PPOAs of Clean Flexible Energy LLC for Review and Approval by the Energy Bureau
|
26/septiembre/2024
|
2024/09/26
|
Documento
|
Resolution and Order
Asunto: Request for Ammendments of Clean Flexible Energy, LLC ESSAs and PPOAs to meet the financing requirements of the Department of Energy’s Loan Program Office (“LPO”).
|
04/septiembre/2024
|
2024/09/04
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan – Second Tranche Projects Approval
|
26/agosto/2024
|
2024/08/26
|
Documento
|
Motion in Compliance with the July 3rd Resolution and Order
Asunto: IN RE: Implementation of the Puerto Rico Electric Power Authority Integrated Resource Plan and Modified Action Plan.
|
02/agosto/2024
|
2024/08/02
|
Documento
|
Motion in Compliance with the June 14th Order
Asunto: IN RE: Implementation of the Puerto Rico Electric Power Authority Integrated Resource Plan and Modified Action Plan.
|
31/julio/2024
|
2024/07/31
|
Documento
|
Motion in Compliance with June 27th Order
Asunto: Motion in Compliance with June 27th Order
|
29/julio/2024
|
2024/07/29
|
Documento
|
Motion for Extension of Time to Comply with the July 3rd Resolution and Order
Asunto: Motion for Extension of Time to Comply with the July 3rd Resolution and Order
|
23/julio/2024
|
2024/07/23
|
Documento
|
Renewal of Request for Extension of Time to Comply
Asunto: IN RE: Implementation of the Puerto Rico Electric Power Authority Integrated Resource Plan and Modified Action Plan.
|
22/julio/2024
|
2024/07/22
|
Documento
|
Partial Compliance with the June 14th Order and Request for Extension of Time to Comply
Asunto: Exhibit 4A
|
10/julio/2024
|
2024/07/10
|
Documento
|
Partial Compliance with the June 14th Order and Request for Extension of Time to Comply
Asunto: Exhibit A3
|
10/julio/2024
|
2024/07/10
|
Documento
|
Partial Compliance with the June 14th Order and Request for Extension of Time to Comply
Asunto: Exhibit A2
|
10/julio/2024
|
2024/07/10
|
Documento
|
Partial Compliance with the June 14th Order and Request for Extension of Time to Comply
Asunto: Exhibit A1
|
10/julio/2024
|
2024/07/10
|
Documento
|
Partial Compliance with the June 14th Order and Request for Extension of Time to Comply
Asunto: Partial Compliance with the June 14th Order and Request for Extension of Time to Comply
|
10/julio/2024
|
2024/07/10
|
Documento
|
Motion in Partial Compliance with the June 27th Order and Request for Extension of Time to Comply
Asunto: IN RE: Implementation of the Puerto Rico Electric Power Authority Integrated Resource Plan and Modified Action Plan.
|
08/julio/2024
|
2024/07/08
|
Documento
|
Resolution and Order
Asunto: First Request for Information in relation to request of approval of two additional energy storage service agreements (ESSAs)
|
03/julio/2024
|
2024/07/03
|
Documento
|
Resolution and Order
Asunto: Request for Information in relation to request of amendments of Clean Flexible Energy, LLC ESSAs and PPOAs.
|
27/junio/2024
|
2024/06/27
|
Documento
|
Motion to Reiterate the Request for the Review and Approval of Certain PPOAS and ESSAS Amendments by the Energy Bureau
Asunto: Motion to Reiterate the Request for the Review and Approval of Certain PPOAS and ESSAS Amendments by the Energy Bureau
|
24/junio/2024
|
2024/06/24
|
Documento
|
Motion for Extension of Time to Comply with the June 14th Resolution
Asunto: Motion for Extension of Time to Comply with the June 14th Resolution
|
20/junio/2024
|
2024/06/20
|
Documento
|
Motion to Submit the Report of the Selection Committee’s Evaluation of the Tranche 2 Renewable Energy and Energy Storage Solicitation
Asunto: Motion to Submit the Report of the Selection Committee’s Evaluation of the Tranche 2 Renewable Energy and Energy Storage Solicitation
|
18/junio/2024
|
2024/06/18
|
Documento
|
Resolution and Order
Asunto: Request for Information (“ROI”)
|
14/junio/2024
|
2024/06/14
|
Documento
|
Motion to Submit Amendments for the Review and Approval of Clean Flexible Energy, LLC’s PPOAS and ESSAS by the Energy Bureau
Asunto: IN RE: The Implementation of the Puerto Rico Electric Power Authority Integrated Resource Plan and Modified Action Plan.
|
31/mayo/2024
|
2024/05/31
|
Documento
|
Motion to Submit Additional Energy Storage Service Agreements (ESSAS) for the Energy Bureau’s Approval
Asunto: Motion to Submit Additional Energy Storage Service Agreements (ESSAS) for the Energy Bureau’s Approval
|
07/mayo/2024
|
2024/05/07
|
Documento
|
Motion to Submit Amendments for Two Executed ESSA’s
Asunto: Motion to Submit Amendments for Two Executed ESSA’s
|
16/abril/2024
|
2024/04/16
|
Documento
|
Memorandum of Law in Support of Confidential Treatment of Exhibit 1 Filed by LUMA on February 12, 2024
Asunto: Memorandum of Law in Support of Confidential Treatment of Exhibit 1 Filed by LUMA on February 12, 2024
|
23/febrero/2024
|
2024/02/23
|
Documento
|
NEPR-MI-2020-0012 Motion for Extension of Time to File Memorandum of Law in Support of Confidential Treatment of Exhibit 1 Filed by LUMA on February 12, 2024
Asunto: NEPR-MI-2020-0012 Motion for Extension of Time to File Memorandum of Law in Support of Confidential Treatment of Exhibit 1 Filed by LUMA on February 12, 2024 […]
|
23/febrero/2024
|
2024/02/23
|
Documento
|
Resolución
Asunto: Resolución sobre Moción Solicitando Participar en Primer Tranche de Proyectos y sobre Moción Solicitando Acción del NEPR.
|
14/febrero/2024
|
2024/02/14
|
Documento
|
Motion to Submit Information in Compliance with Resolution and Order of February 5, 2023 and Request for Confidential Treatment
Asunto: Motion to Submit Information in Compliance with Resolution and Order of February 5, 2023 and Request for Confidential Treatment
|
12/febrero/2024
|
2024/02/12
|
Documento
|
Motion in Compliance With the February 5, 2024 Resolution and Order
Asunto: Tranche 1 Interconnection costs
|
12/febrero/2024
|
2024/02/12
|
Documento
|
Resolution and Order
Asunto: Tranche 1 Interconnection Costs
|
05/febrero/2024
|
2024/02/05
|
Documento
|
Notice of Withdrawal as Attorney of Record
Asunto: Notice of Withdrawal as Attorney of Record
|
08/enero/2024
|
2024/01/08
|
Documento
|
Notice of Withdrawal as Attorney of Record
Asunto: Notice of Withdrawal as Attorney of Record
|
08/enero/2024
|
2024/01/08
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: YFNY Amendment 1_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: YFNY Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Tetris Amendment 1_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Interconnection Agreement (Brownfield) (Tetris) Full Execution Version 11.29.23_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: First Amendment to Interconnection Agreement Salinas Solar _Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Interconnection Agreement (Greenfield) (Salinas Solar PPOA)_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Pattern Barceloneta Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Pattern Barceloneta Interconnection Agreement Amendment 1_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: First Amendment to Interconnection Agreement Execution Version (JobosPV) _Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Interconnection Agreement (CFE) (Brownfield) (Jobos PV) _Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Guayama Solar Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Guayama Solar Interconnection Agreement Amendment 1 pdf_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Go Green Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Ciro One – Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Solaner Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Solaner Amendment 1_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Interconnection Agreement (Greenfield) (Salinas BESS) _Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: First Amendment to Interconnection Agreement Salinas BESS _Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: CS_UR Juncos Amendment_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: CS_UR Juncos (AQ-1-P)_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Convergent Coamo Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Convergent Coamo Interconnection Agreement Amendment 1_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Ciro Two Interconnection Agreement_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Ciro Two Interconnection Agreement Amendment 1_Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: Interconnection Agreement (CFE) (Job ESSA) (Brownfield) _Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023
Asunto: First Amendment to Interconnection Agreement Execution Version _Redacted
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Motion to Submit Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023 and Memorandum of Law in Support of Confidential Treatment of Exhibit 1
Asunto: Motion to Submit Corrected Exhibit 1 to «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» Filed by LUMA on December 7, 2023 and […]
|
21/diciembre/2023
|
2023/12/21
|
Documento
|
Motion in Compliance with the November 29th, 2023 Resolution and Order
Asunto: Motion in Compliance with the November 29th, 2023 Resolution and Order
|
20/diciembre/2023
|
2023/12/20
|
Documento
|
Motion for Extension of Time to file Memorandum of Law in Suppport of Confidential Treatment of Exhibit 1 to the «Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment» filed by LUMA on December 7, 2023
Asunto: Motion for Extension of Time to file Memorandum of Law in Suppport of Confidential Treatment of Exhibit 1 to the «Motion to Submit Executed Interconnection Agreements […]
|
18/diciembre/2023
|
2023/12/18
|
Documento
|
Motion to Request an Extension of Time to Comply with November 29th Order
Asunto: Motion to Request an Extension of Time to Comply with November 29th Order
|
13/diciembre/2023
|
2023/12/13
|
Documento
|
Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment
Asunto: Motion to Submit Executed Interconnection Agreements and Request for Confidential Treatment
|
07/diciembre/2023
|
2023/12/07
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding Motion for Partial Reconsideration of the Resolution and Order Dated November 29, 2023, filed by the Puerto Rico Electric Power Authority
|
07/diciembre/2023
|
2023/12/07
|
Documento
|
Motion in Compliance with the November 29th, Resolution and Order
Asunto: Motion in Compliance with the November 29th, Resolution and Order
|
06/diciembre/2023
|
2023/12/06
|
Documento
|
Informative Motion on Execution of Tranche 1 Interconnection Agreements, Request for Determination Regarding Interconnection Costs and Request for Confidential Treatment
Asunto: Informative Motion on Execution of Tranche 1 Interconnection Agreements, Request for Determination Regarding Interconnection Costs and Request for Confidential Treatment
|
06/diciembre/2023
|
2023/12/06
|
Documento
|
Motion in Compliance with Energy Bureau November 29, 2023 Resolution and Order
Asunto: Motion in Compliance with Energy Bureau November 29, 2023 Resolution and Order
|
04/diciembre/2023
|
2023/12/04
|
Documento
|
Motion for Partial Reconsideration of the Resolution and order Dated November 29, 2023
Asunto: Motion for Partial Reconsideration of the Resolution and order Dated November 29, 2023
|
30/noviembre/2023
|
2023/11/30
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding Urgent Motion to Submit Amended PPOA and ESSA, filed by the Puerto Rico Electric Power Authority
|
29/noviembre/2023
|
2023/11/29
|
Documento
|
Urgent Motion to Submit Amended PPOA and ESSA
Asunto: Urgent Motion to Submit Amended PPOA and ESSA
|
28/noviembre/2023
|
2023/11/28
|
Documento
|
Asociación de Productores de Energía Renovable – Request for Clarification
Asunto: Asociación de Productores de Energía Renovable – Request for Clarification
|
14/noviembre/2023
|
2023/11/14
|
Documento
|
Resolution and Order
Asunto: Motion in Compliance with Order regarding «Restricted Parties» provision
|
06/noviembre/2023
|
2023/11/06
|
Documento
|
Resolution and Order
Asunto: PREPA representative for the Selection Committee and a point of contact with PREB -IC
|
19/octubre/2023
|
2023/10/19
|
Documento
|
Notice of Withdrawal as Attorney of Record
Asunto: Notice of Withdrawal as Attorney of Record
|
10/octubre/2023
|
2023/10/10
|
Documento
|
Resolution and Orden
Asunto: Resolution and Order regarding Motion to Submit N- 1 -P Proponent Best and Final Offer Information, filed by the Puerto Rico Electric Power Authority
|
27/septiembre/2023
|
2023/09/27
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding Motion to Comply with Resolution and Order of September 15, 2023, as Modified by Resolution and Order of September 20, 2023, filed […]
|
26/septiembre/2023
|
2023/09/26
|
Documento
|
Motion to Supplement PREPA’s September 6 Motion and Request for Approval of Amendment to the N-1-P Project PPOA
Asunto: Motion to Supplement PREPA’s September 6 Motion and Request for Approval of Amendment to the N-1-P Project PPOA
|
25/septiembre/2023
|
2023/09/25
|
Documento
|
Motion in Compliance with the September 15 Resolution and Order
Asunto: Motion in Compliance with the September 15 Resolution and Order
|
22/septiembre/2023
|
2023/09/22
|
Documento
|
Motion to Comply with Resolution and Order of September 15, 2023, as Modified by Resolution and Order of September 20, 2023
Asunto: Motion to Comply with Resolution and Order of September 15, 2023, as Modified by Resolution and Order of September 20, 2023
|
22/septiembre/2023
|
2023/09/22
|
Documento
|
Motion to Submit Proposed Amendment to AI-1P PPOA
Asunto: Motion to Submit Proposed Amendment to AI-1P PPOA
|
20/septiembre/2023
|
2023/09/20
|
Documento
|
Resolution and Order
Asunto: LUMA’s Motion Requesting Extension to Comply with September 15th Order
|
20/septiembre/2023
|
2023/09/20
|
Documento
|
Motion Requesting Extension of Time to Comply with September 15th Order
Asunto: Motion Requesting Extension of Time to Comply with September 15th Order
|
19/septiembre/2023
|
2023/09/19
|
Documento
|
Resolution and Order
Asunto: Tranche 1 Interconnection Costs.
|
15/septiembre/2023
|
2023/09/15
|
Documento
|
Motion in Compliance with Order Regarding Quanta Services Inc. Request for Revision to the Provision Regarding «Restricted Parties» in the RFP’s for Tranches 1-6
Asunto: Motion in Compliance with Order Regarding Quanta Services Inc. Request for Revision to the Provision Regarding «Restricted Parties» in the RFP’s for Tranches 1-6
|
11/septiembre/2023
|
2023/09/11
|
Documento
|
Motion in Compliance with the August 24 Order
Asunto: Motion in Compliance with the August 24 Order
|
06/septiembre/2023
|
2023/09/06
|
Documento
|
Resolution and Order
Asunto: Quanta Services Inc. request for revision to the provision regarding «Restricted Parties» in the RFPs for Tranches 1 – 6
|
01/septiembre/2023
|
2023/09/01
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding Motion to Submit N-1-P Proponent Best and Final Offer Information, filed by the Puerto Rico Electric Power Authority
|
30/agosto/2023
|
2023/08/30
|
Documento
|
Informative Motion and Request for Extension to Comply with the August 24 Order
Asunto: Informative Motion and Request for Extension to Comply with the August 24 Order
|
28/agosto/2023
|
2023/08/28
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding Motion to Submit N-1-P Proponent Best and Final Offer Information, filed by the Puerto Rico Electric Power Authority.
|
24/agosto/2023
|
2023/08/24
|
Documento
|
Motion to Submit N-1-P Proponent Best and Final Offer Information
Asunto: Motion to Submit N-1-P Proponent Best and Final Offer Information
|
22/agosto/2023
|
2023/08/22
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding Motion to Submit Amendment to PPOA Between Esmeralda Solar Farm and PREPA, filed by the Puerto Rico Electric Power Authority.
|
16/agosto/2023
|
2023/08/16
|
Documento
|
Moción Solicitando Acción de NEPR
Asunto: (Windmar) Determinations for Subset of Tranche 1 Solar PV Projects
|
15/agosto/2023
|
2023/08/15
|
Documento
|
Motion to Submit Amendment to PPOA Between Esmeralda Solar Farm and PREPA
Asunto: Motion to Submit Amendment to PPOA Between Esmeralda Solar Farm and PREPA
|
31/julio/2023
|
2023/07/31
|
Documento
|
Motion to Submit Negotiated Contract with Selected IRP Technical Consultant and Related Information and Request for Confidentiality
Asunto: Submittal of Negotiated Contract with Selected IRP Technical Consultant and Related Information and Request for Confidentiality
|
27/julio/2023
|
2023/07/27
|
Documento
|
Informative Motion Regarding Request for Proposals for PREPA Interconnection Facilities Works for Tranche 1 Projects
Asunto: Informative Motion Regarding Request for Proposals for PREPA Interconnection Facilities Works for Tranche 1 Projects
|
13/julio/2023
|
2023/07/13
|
Documento
|
Resolution Nunc Pro Tunc
Asunto: Resolution Nunc Pro Tunc; Correction Attachment A of Resolution and Order June 30, 2023.
|
03/julio/2023
|
2023/07/03
|
Documento
|
Informative Motion Regarding Request for Proposals for PREPA Interconnection Facilities Works for Tranche 1 Projects
Asunto: Informative Motion Regarding Request for Proposals for PREPA Interconnection Facilities Works for Tranche 1 Projects
|
03/julio/2023
|
2023/07/03
|
Documento
|
Resolution and Order
Asunto: Determinations for Subset of Tranche 1 Solar PV and Battery Energy Storage Projects.
|
30/junio/2023
|
2023/06/30
|
Documento
|
Moción Solicitando Participar en Primer Tranche de Proyectos
Asunto: Determinations for Subset of Tranche I Solar PV Projects
|
16/junio/2023
|
2023/06/16
|
Documento
|
Motion to Submit Additional Amended PPOAS and ESSA’s
Asunto: Motion to Submit Additional Amended PPOAS and ESSA’s
|
15/junio/2023
|
2023/06/15
|
Documento
|
Resolution
Asunto: Request for Confidential Designation and Treatment
|
06/junio/2023
|
2023/06/06
|
Documento
|
Motion to Submit Second Amendments for Two Executed PPOAs
Asunto: Motion to Submit Second Amendments for Two Executed PPOAs
|
25/mayo/2023
|
2023/05/25
|
Documento
|
Resolution and Order
Asunto: Determinations for Subset if Tranche 1 Solar PV Projects.
|
25/mayo/2023
|
2023/05/25
|
Documento
|
Resolution
Asunto: Determination on PREPA’s May 12 and May 16, 2023 Request for Confidential Designation and Treatment.
|
23/mayo/2023
|
2023/05/23
|
Documento
|
Motion to Submit LCOS in Support of Energy Storage Service Agreement (ESSAs) Presented by PREPA in its May 12 Motion
Asunto: Motion to Submit LCOS in Support of Energy Storage Service Agreement (ESSAs) Presented by PREPA in its May 12 Motion
|
22/mayo/2023
|
2023/05/22
|
Documento
|
Motion to Submit Additional Amended June 30 PPOAS
Asunto: Motion to Submit Additional Amended June 30 PPOAS
|
16/mayo/2023
|
2023/05/16
|
Documento
|
Resolution
Asunto: Request for Confidential Designation and Treatment
|
12/mayo/2023
|
2023/05/12
|
Documento
|
Motion to Submit Additional Energy Storage Service Agreements (ESSAs) for the Energy Bureau’s Evaluation and Approval
Asunto: Motion to Submit Additional Energy Storage Service Agreements (ESSAs) for the Energy Bureau’s Evaluation and Approval
|
12/mayo/2023
|
2023/05/12
|
Documento
|
Motion to Supplement PREPA’s April 28 Motion in Compliance with the April 24, 2023, Resolution and Order
Asunto: Motion to Supplement PREPA’s April 28 Motion in Compliance with the April 24, 2023, Resolution and Order
|
02/mayo/2023
|
2023/05/02
|
Documento
|
Motion in Compliance with the April 24 Resolution and Order
Asunto: Motion in Compliance with the April 24 Resolution and Order
|
28/abril/2023
|
2023/04/28
|
Documento
|
Resolución
Asunto: Resolución respecto a Moción en Cumplimiento de Orden del 12 de abril de 2023, presentada por la Autoridad de Energía Eléctrica de Puerto Rico.
|
26/abril/2023
|
2023/04/26
|
Documento
|
Motion to Submit Amended June 30 PPOAs
Asunto: Motion to Submit Amended June 30 PPOAs
|
26/abril/2023
|
2023/04/26
|
Documento
|
Resolution
Asunto: Extension of time for Tranche 1 Executed Projects signed June 30, 2022 to achieve Closing Date.
|
24/abril/2023
|
2023/04/24
|
Documento
|
Moción en Cumplimiento de Orden del 12 de abril de 2023
Asunto: Moción en Cumplimiento de Orden del 12 de abril de 2023
|
19/abril/2023
|
2023/04/19
|
Documento
|
Motion in Compliance with Order Regarding Submittal of Proponent’s Best and Final Offers Information
Asunto: Motion in Compliance with Order Regarding Submittal of Proponent’s Best and Final Offers Information
|
19/abril/2023
|
2023/04/19
|
Documento
|
Resolution
Asunto: Extension of time for Tranche 1 Executed Projects signed June 30, 2022 to achieve Closing Date
|
17/abril/2023
|
2023/04/17
|
Documento
|
Motion Requesting Technical Meeting
Asunto: Motion Requesting Technical Meeting
|
14/abril/2023
|
2023/04/14
|
Documento
|
Motion Requesting Order on PREPA Request to Amend the Modified Budget for FY2023 for the Purpose of Complying with April 4 Resolutions and Orders on Tranche 1 Closing Date
Asunto: Motion Requesting Order on PREPA Request to Amend the Modified Budget for FY2023 for the Purpose of Complying with April 4 Resolutions and Orders on Tranche […]
|
11/abril/2023
|
2023/04/11
|
Documento
|
Resolution and Order
Asunto: Motion Requesting Approval of Amendments and Informing on Status of Project Development Timeline for Tranche 1 Utility- Scale Project Agreements.
|
04/abril/2023
|
2023/04/04
|
Documento
|
Resolution and Order
Asunto: Resolution and Order addressing LUMA RFP for POI Interconnection Works for Tranche 1.
|
04/abril/2023
|
2023/04/04
|
Documento
|
Asunto: Motion Submitting Update on IRP Technical Consultant Contracting Process, Request for Modification of Procedural Timeline and Request for Confidential Treatment
|
31/marzo/2023
|
2023/03/31
|
Documento
|
Motion Requesting Approval of Amendments and Informing on Status of Project Development Timeline for Tranche 1 Utility-Scale Project Agreements
Asunto: Motion Requesting Approval of Amendments and Informing on Status of Project Development Timeline for Tranche 1 Utility-Scale Project Agreements
|
31/marzo/2023
|
2023/03/31
|
Documento
|
Motion in Compliance with Order and to Inform and Clarify March 10, 2023 Resolution and Order as Applicable to Sectionalizer Projects
Asunto: Motion in Compliance with Order and to Inform and Clarify March 10, 2023 Resolution and Order as Applicable to Sectionalizer Projects
|
17/marzo/2023
|
2023/03/17
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding various motions.
|
10/marzo/2023
|
2023/03/10
|
Documento
|
Informative Motion Regarding Update on LUMA Interconnection Studies Policy Change, Amendment to Closing Date, T1 Project Permitting Process and Request for Order Directing LUMA To Take Specified Actions to Minimize Further Delays
Asunto: Informative Motion Regarding Update on LUMA Interconnection Studies Policy Change, Amendment to Closing Date, T1 Project Permitting Process and Request for Order Addressing Same
|
28/febrero/2023
|
2023/02/28
|
Documento
|
Motion in Compliance with December 19th Order with Respect to Status of Interconnection Studies for Six Approved BESS Projects and Modeling Description for Such Studies
Asunto: Motion in Compliance with December 19th Order with Respect to Status of Interconnection Studies for Six Approved BESS Projects and Modeling Description for Such Studies
|
09/enero/2023
|
2023/01/09
|
Documento
|
Informative Motion in Compliance with the December 19, 2022 Order which Requested a Status Updates on Contract Negotiations with BESS Projects
Asunto: Informative Motion in Compliance with the December 19, 2022 Order which Requested a Status Updates on Contract Negotiations with BESS Projects
|
03/enero/2023
|
2023/01/03
|
Documento
|
Informative Motion Regarding Interconnection Studies for Tranche 1 Approved BESS Projects and Request for Confidential Treatment
Asunto: Informative Motion Regarding Interconnection Studies for Tranche 1 Approved BESS Projects and Request for Confidential Treatment
|
22/diciembre/2022
|
2022/12/22
|
Documento
|
Resolution and Order
Asunto: Approval for GSA for the 17 MW VPP; and request for updated interconnection studies inclusive of the BESS First Tranche Projects
|
19/diciembre/2022
|
2022/12/19
|
Documento
|
SESA Request for a 2nd Extension of the Second Renewable Generation and Energy Storage Resource Procurement Tranche
Asunto no disponible.
|
01/diciembre/2022
|
2022/12/01
|
Documento
|
Motion to Submit Draft Copy of GSA in Compliance with the June 13, 2022 Order
Asunto: Motion to Submit Draft Copy of GSA in Compliance with the June 13, 2022 Order
|
02/noviembre/2022
|
2022/11/02
|
Documento
|
Resolution and Order
Asunto: Submittal of Status Update on Technical Consultant Contracting Process and Early Stages of IRP Preparation in Compliance with Energy Bureau Resolution and Order of April 22, […]
|
14/octubre/2022
|
2022/10/14
|
Documento
|
Motion to Submittal of Status Update on Technical Consultant Contracting Process and Early Stages of IRP Preparation in Compliance with Energy Bureau Resolution and Order of April 22, 2022
Asunto: Motion to Submittal of Status Update on Technical Consultant Contracting Process and Early Stages of IRP Preparation in Compliance with Energy Bureau Resolution and Order of […]
|
03/octubre/2022
|
2022/10/03
|
Documento
|
Motion to Set Aside Order Given Previous Compliance by PREPA Submitting Responses, on June 16, 2022, to LCOS Request for Information in Compliance with the June 13 Order
Asunto: Motion to Set Aside Order Given Previous Compliance by PREPA Submitting Responses, on June 16, 2022, to LCOS Request for Information in Compliance with the June […]
|
09/septiembre/2022
|
2022/09/09
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan – First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
08/septiembre/2022
|
2022/09/08
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan – First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
01/septiembre/2022
|
2022/09/01
|
Documento
|
Motion to Submit List of Qualified Proponents for IRP Consultant Procurement and Related Information and Request for Confidentiality
Asunto: Submittal of Qualified Proponents for IRP Consultant Procurement and Related Information and Request for Confidentiality
|
31/agosto/2022
|
2022/08/31
|
Documento
|
Motion to Submit Remaining Executed PPOAs and Bess Contracts in Compliance with the August 15, 2022, Resolution and Order
Asunto: BESS PPOA Agreement Between PREPA and Clean Flexible Energy LLC – Jobos (PPOA)_Redacted
|
26/agosto/2022
|
2022/08/26
|
Documento
|
Motion to Submit Remaining Executed PPOAs and Bess Contracts in Compliance with the August 15, 2022, Resolution and Order
Asunto: Naguabo A PPOA BETWEEN PREPA AND CLEAN FLEXIBLE ENERGY LLC – NAGUABO-A (PPOA)_Redacted
|
26/agosto/2022
|
2022/08/26
|
Documento
|
Motion to Submit Remaining Executed PPOAs and Bess Contracts in Compliance with the August 15, 2022, Resolution and Order
Asunto: BESS PPOA Between PREPA and Clean Flexible Energy LLC – Salinas (PPOA)_Redacted
|
26/agosto/2022
|
2022/08/26
|
Documento
|
Motion to Submit Remaining Executed PPOAs and Bess Contracts in Compliance with the August 15, 2022, Resolution and Order
Asunto: Salinas PPOA PREPA and Clean Flexible Energy LLC – Salinas (PPOA)_Redacted (1)
|
26/agosto/2022
|
2022/08/26
|
Documento
|
Motion to Submit Remaining Executed PPOAs and Bess Contracts in Compliance with the August 15, 2022, Resolution and Order
Asunto: Naguabo Power Purchase and Operating Agreement Between PREPA and Clean Flexible Energy LLC (PPOA)_Redacted
|
26/agosto/2022
|
2022/08/26
|
Documento
|
Motion to Submit Remaining Executed PPOAs and Bess Contracts in Compliance with the August 15, 2022, Resolution and Order
Asunto: PPOA Jobos Puerto Rico Electric Power Authority and Clean Flexible Energy LLC – Jobos (PPOA)_Redacted
|
26/agosto/2022
|
2022/08/26
|
Documento
|
Motion to Submit Remaining Executed PPOAs and Bess Contracts in Compliance with the August 15, 2022, Resolution and Order
Asunto: Motion to Submit Remaining PPOAs in Compliance with the August 15, 2022, Resolution and Order
|
26/agosto/2022
|
2022/08/26
|
Documento
|
Resolution
Asunto: Resolution regarding Response to Resolution and Order of July 20, 2022, and Request for Technical Conference, filed by LUMA Energy, LLC and LUMA Energy ServCo, LLC.
|
18/agosto/2022
|
2022/08/18
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan – First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
15/agosto/2022
|
2022/08/15
|
Documento
|
Response to Resolution and Order of July 20, 2022, and Request for Technical Conference
Asunto: Response to Resolution and Order of July 20, 2022, and Request for Technical Conference
|
15/agosto/2022
|
2022/08/15
|
Documento
|
Motion to Submit Additional Executed PPOA in Compliance with July 8 Resolution and Order
Asunto: Redacted Exhibit A – Esmeralda Solar Farm LLC PPOA (Contrato) (002) redacted
|
13/agosto/2022
|
2022/08/13
|
Documento
|
Motion to Submit Additional Executed PPOA in Compliance with July 8 Resolution and Order
Asunto: Motion to Submit Additional Executed PPOA in Compliance with July 8 Resolution and Order
|
13/agosto/2022
|
2022/08/13
|
Documento
|
Motion to Submit Additional PPOAS in Compliance with July 8 Resolution and Order
Asunto: Exhibit A-Go Green USA América Corp. PPOA (Contrato) Redacted
|
05/agosto/2022
|
2022/08/05
|
Documento
|
Motion to Submit Additional PPOAS in Compliance with July 8 Resolution and Order
Asunto: Exhibit A-SolarBlue Bemoga, LLC PPOA (Contrato) Redacted
|
05/agosto/2022
|
2022/08/05
|
Documento
|
Motion to Submit Additional PPOAS in Compliance with July 8 Resolution and Order
Asunto: Exhibit A-Enerxia Solar, LLC PPOA (Contrato) Redacted
|
05/agosto/2022
|
2022/08/05
|
Documento
|
Motion to Submit Additional PPOAS in Compliance with July 8 Resolution and Order
Asunto: Exhibit A-Diversys Solar, LLC PPOA (Contrato) Redacted
|
05/agosto/2022
|
2022/08/05
|
Documento
|
Motion to Submit Additional PPOAS in Compliance with July 8 Resolution and Order
Asunto: Motion to Submit Additional PPOAS in Compliance with July 8 Resolution and Order
|
04/agosto/2022
|
2022/08/04
|
Documento
|
Motion To Submit Federal Funding Roadmap in Compliance with Energy Bureau Resolution and Order of June 13, 2022
Asunto: Motion To Submit Federal Funding Roadmap in Compliance with Energy Bureau Resolution and Order of June 13, 2022
|
28/julio/2022
|
2022/07/28
|
Documento
|
Informative Motion and Request for Extension to Submit Supplemental Interconnection Studies for two Pending Solar PV Projects
Asunto: Informative Motion and Request for Extension to Submit Supplemental Interconnection Studies for two Pending Solar PV Projects
|
21/julio/2022
|
2022/07/21
|
Documento
|
Resolution and Order
Asunto: Resolution and Order regarding LUMA’s Urgent Motion Requesting Reconsideration of Energy Bureau’s Resolution and Order of June 13, 2022 and Stay of all Directives Therein
|
20/julio/2022
|
2022/07/20
|
Documento
|
Motion Requesting Extension of Time to Submit Execution Copies of Additional PPOAs in Compliance with July 8 Resolution and Order
Asunto: Motion for Extension of Time to Submit Execution Copies of Additional PPOAs in Compliance with July 8 Resolution and Order
|
18/julio/2022
|
2022/07/18
|
Documento
|
Resolution
Asunto: Resolution regarding Motion Requesting Modification of Energy Bureau’s Resolution and Order of June 9, 2022, with Respect to the Composition of the Selection Committee Established Therein […]
|
14/julio/2022
|
2022/07/14
|
Documento
|
Informative Motion Relating to Energy Bureau’s Approval of Nine Tranche 1 Bess Projects
Asunto: Informative Motion Relating to Energy Bureau’s Approval of Nine Tranche 1 Bess Projects
|
13/julio/2022
|
2022/07/13
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit-APattern Barceloneta Solar LLC PPOA_Redacted (1)
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit-A YFN Yabucoa Solar LLC PPOA_Redacted
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit-A Guayama Solar Energy LLC PPOA_Redacted
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit-A Ciro Two Salinas LLC PPOA_Redacted
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit A-Solaner Puerto Rico One LLC PPOA_Redacted
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit A-Pattern Vega Baja Solar LLC PPOA_Redacted
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit A-CS-UR Juncos PV LLC PPOA_Redacted
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit A-Convergent Coamo Energy Storage 1 LLC PPOA_Redacted
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Exhibit A- Tetris Power LLC PPOA_Redacted (1)
|
12/julio/2022
|
2022/07/12
|
Documento
|
Amended Motion to Submit Confidential and Redacted Execution Copies of PPOAS
Asunto: Amended Motion to Submit Confidential and Redacted Execution Copies of PPOA
|
12/julio/2022
|
2022/07/12
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan – First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
08/julio/2022
|
2022/07/08
|
Documento
|
Response to PREPA’s Second Motion on Gas Conversions for Aguirre, San Juan, Palo Seco Power Plants
Asunto: Response to PREPA’s Second Motion on Gas Conversions for Aguirre, San Juan, Palo Seco Power Plants
|
05/julio/2022
|
2022/07/05
|
Documento
|
Resolution and Order
Asunto: Request for Confidential Designation and Treatment
|
05/julio/2022
|
2022/07/05
|
Documento
|
Motion to Submit Status Update On Technical Consultant Contracting Process And Early Stages of 2024 IRP Preparation In Compliance With Energy Bureau Resolution And Order Of April 22, 2022
Asunto: Submittal of Status Update On Technical Consultant Contracting Process And Early Stages of 2024 IRP Preparation In Compliance With Energy Bureau Resolution And Order Of April […]
|
01/julio/2022
|
2022/07/01
|
Documento
|
Motion to Submit Execution Copies of PPOAS in Compliance with April 27 and June 13 2022 Orders, Request for Additional Time to Submit Certain PPOAS and Memorandum of Law Requesting Confidential Treatment of PPOAS and Exhibits
Asunto: Motion to Submit Execution Copies of PPOAS in Compliance with April 27 and June 13 2022 Orders, Request for Additional Time to Submit Certain PPOAS and […]
|
30/junio/2022
|
2022/06/30
|
Documento
|
Motion in Compliance with Resolution and Order of June 9, 2022
Asunto: Motion in Compliance with Resolution and Order of June 9, 2022
|
30/junio/2022
|
2022/06/30
|
Documento
|
Motion to Submit the Appointment of PREPA Representatives in Compliance with the June 9 Resolution and Order
Asunto: Motion to Submit the Appointment of PREPA Representatives in Compliance with the June 9 Resolution and Order
|
29/junio/2022
|
2022/06/29
|
Documento
|
Motion Requesting Modification of Energy Bureau Resolution and Order of June 9, 2022 with Respect to the Composition of the Selection Committee Established Therein
Asunto: Request for Modification of Energy Bureau Resolution and Order of June 9, 2022 with Respect to the Composition of the Selection Committee Established Therein
|
29/junio/2022
|
2022/06/29
|
Documento
|
Urgent Motion Requesting Reconsideration of Energy Bureau’s Resolution and Order on June 13, 2022, and Stay of All Directives Therein
Asunto: Urgent Motion Requesting Reconsideration of Energy Bureau’s Resolution and Order on June 13, 2022, and Stay of All Directives Therein
|
22/junio/2022
|
2022/06/22
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan – First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
13/junio/2022
|
2022/06/13
|
Documento
|
Memorandum of Law in Support of Confidential Treatment of Interconnection Studies Submitted by LUMA on May 31, 2022
Asunto: Memorandum of Law in Support of Confidential Treatment of Interconnection Studies Submitted by LUMA on May 31, 2022
|
13/junio/2022
|
2022/06/13
|
Documento
|
Resolution and Order
Asunto: Funds for Transmission System Network Upgrades that contribute to raising system performance to industry standards
|
13/junio/2022
|
2022/06/13
|
Documento
|
Resolution and Order
Asunto: Roles of PREPA and LUMA in the Procurement Process for Upcoming Tranches
|
09/junio/2022
|
2022/06/09
|
Documento
|
Motion to Submit Letter Sent by the Oversight Board to Reiterate the Petition to Initiate Works to Comply with Environmental Regulations, and Request for Technical Conference
Asunto: Motion to Submit Letter Sent by the Oversight Board, to Reiterate the Petition to Initiate Works to Comply with Environmental Regulations, and Request for Technical Conference
|
03/junio/2022
|
2022/06/03
|
Documento
|
Motion Submitting Final Technical Interconnection Studies for Eighteen Tranche 1 Projects Required Under Energy Bureau’s Resolution and Order of April 27, 2022, and Request for Confidential Treatment
Asunto: Submittal of Final Technical Interconnection Studies for Eighteen Tranche 1 Projects Required Under Energy Bureau’s Resolution and Order of April 27, 2022, and Request for Confidential […]
|
31/mayo/2022
|
2022/05/31
|
Documento
|
Motion to Inform Approval of Mayaguez Project
Asunto: Motion to Inform Approval of Mayaguez Hydro-Gas Power Plant Permanent Repairs
|
19/mayo/2022
|
2022/05/19
|
Documento
|
Memorandum of Law in Support of Confidential Treatment of Responses Submitted in Compliance with Resolution and Order Dated April 11, 2022
Asunto: Memorandum of Law in Support of Confidential Treatment of Responses Submitted in Compliance with Resolution and Order Dated April 11, 2022
|
09/mayo/2022
|
2022/05/09
|
Documento
|
Motion in Compliance with the Progress Report and Update Task Schedule Requirements of the Energy Bureau’s Resolution and Order of April 27, 2022
Asunto: Motion in Compliance with the Progress Report and Update Task Schedule Requirements of the Energy Bureau’s Resolution and Order of April 27, 2022
|
29/abril/2022
|
2022/04/29
|
Documento
|
Sixth Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process and to Request Meeting
Asunto: Sixth Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process and to Request Meeting
|
28/abril/2022
|
2022/04/28
|
Documento
|
Motion Submitting Complete Responses to Questions 6 and 7 in Energy Bureau’s Resolution and Order of April 11, 2022 and Requesting Confidential Treatment
Asunto: Motion Submitting Complete Responses to Questions 6 and 7 in Energy Bureau’s Resolution and Order of April 11, 2022 and Requesting Confidential Treatment
|
28/abril/2022
|
2022/04/28
|
Documento
|
Memorandum of Law in Support of Request for Confidential Treatment of Attachment A
Asunto: Memorandum of Law in Support of Request for Confidential Treatment of Attachment A
|
28/abril/2022
|
2022/04/28
|
Documento
|
Resolution and Order
Asunto: Execution of Approved Power Purchase and Operation Agreements
|
27/abril/2022
|
2022/04/27
|
Documento
|
Resolution and Order
Asunto: Submittal of Report on Resource Planning Process for Next IRP cycle and Draft RFQ/RFP for IRP Consultant and Request for Confidential Treatment
|
22/abril/2022
|
2022/04/22
|
Documento
|
Resolution and Order
Asunto: PREPA’s and LUMA’s request for Extension of Time to Comply with Responses Required by Resolution and Order of April 11, 2022
|
22/abril/2022
|
2022/04/22
|
Documento
|
Motion Submitting Partial Response and Requesting Brief Extension to Submit LUMA’s Full Answers to Questions 6 and 7 in Energy Bureau’s Resolution and Order of April 11, 2022
Asunto: Motion Submitting Partial Response and Requesting Brief Extension to Submit LUMA’s Full Answers to Questions 6 and 7 in Energy Bureau’s Resolution and Order of April […]
|
19/abril/2022
|
2022/04/19
|
Documento
|
Motion for Extension of Time Until April 25, 2022, to Comply with Responses Required by the April 11, 2022, Resolution and Order
Asunto: Motion for extension of time to comply with April 11 Order
|
19/abril/2022
|
2022/04/19
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan-First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
11/abril/2022
|
2022/04/11
|
Documento
|
SESA Request regarding Tranche 1 and Tranche 2 Renewable Generation and Energy Storage Resource and VPP Procurement
Asunto: SESA Request regarding Tranche 1 and Tranche 2 Renewable Generation and Energy Storage Resource and VPP Procurement
|
29/marzo/2022
|
2022/03/29
|
Documento
|
Firth Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process and to Request Meeting
Asunto: Firth Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process and to Request Meeting
|
28/marzo/2022
|
2022/03/28
|
Documento
|
Informative Motion and Request for Approval of RFQ/RFP for IRP Consultant Contracting Process
Asunto: Informative Motion and Request for Approval of RFQ/RFP for IRP Consultant Contracting Process
|
21/marzo/2022
|
2022/03/21
|
Documento
|
Moción Solicitando Acción Referente a Moción Titulada «Request for Access to Information Concerning Tranche I Renewable Contracts» Radicada el 8 de febrero de 2022
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan-First Tranche Projects or Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
17/marzo/2022
|
2022/03/17
|
Documento
|
Memorandum of Law in Support of Request for Confidential Treatment of Attachment A
Asunto: Memorandum of Law in Support of Request for Confidential Treatment of Attachment A
|
17/marzo/2022
|
2022/03/17
|
Documento
|
Moción del Instituto de Competitividad y Sostenibilidad Económica de Puerto Rico para la Inclusión de Factores de Política Pública en la Contratación
Asunto: ICSE-Aprobación de Solar PV PPOAs
|
24/febrero/2022
|
2022/02/24
|
Documento
|
Fourth Motion to Reiterate for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process and Informing PREPA’s Point of Contact
Asunto: Fourth Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process
|
21/febrero/2022
|
2022/02/21
|
Documento
|
Motion Regarding the Preliminary Studies for New Combined Cycle Power Plant in Palo Seco
Asunto: Motion Regarding the Preliminary Studies for New Combined Cycle Power Plant in Palo Seco
|
17/febrero/2022
|
2022/02/17
|
Documento
|
Motion in Compliance with Energy Bureau Resolution and Order of January 27, 2022
Asunto: Motion in Compliance with Energy Bureau Resolution and Order of January 27, 2022
|
15/febrero/2022
|
2022/02/15
|
Documento
|
Request for Access to Information Concerning Tranche I Renewable Contracts
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan-First Tranche Projects for phase III Contract negotiation and Final Interconnection Plan Approvals
|
08/febrero/2022
|
2022/02/08
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan-First Tranche Project for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
02/febrero/2022
|
2022/02/02
|
Documento
|
Motion in Compliance with the January 28 Order Submitting Energy Storage Resources Information, the Next Two Projects Totaling 50 MW of Solar PV Resources and Memorandum of Law Requesting Confidential Treatment
Asunto: Motion in Compliance with the January 28 Order Submitting Energy Storage Resources Information, the Next Two Projects Totaling 50 MW of Solar PV Resources and Memorandum […]
|
02/febrero/2022
|
2022/02/02
|
Documento
|
Motion Compliance With the January 28 Order Submitting Responses to Attachment A Of the December 28 Order and Memorandum of Law Requesting Confidential Treatment
Asunto: Motion Compliance With the January 28 Order Submitting Responses to Attachment A Of the December 28 Order and Memorandum of Law Requesting Confidential Treatment
|
31/enero/2022
|
2022/01/31
|
Documento
|
Motion Reiterating Request for Meeting to Discuss
Asunto: Motion Reiterating Request for Meeting to Discuss
|
31/enero/2022
|
2022/01/31
|
Documento
|
Motion to Inform Submittal of Public Version of Several Motion in Compliance with the January 28 Order
Asunto: Motion to Inform Submittal of Public Version of Several Motion in Compliance with the January 28 Order
|
31/enero/2022
|
2022/01/31
|
Documento
|
Request For Clarification, Partial Reconsideration of December 28 Order, Confidential Meeting and Extension of Time
Asunto: Request For Clarification, Partial Reconsideration of December 28 Order, Confidential Meeting and Extension of Time
|
31/enero/2022
|
2022/01/31
|
Documento
|
Motion in Compliance with the January 28 Order Submitting Responses to Attachment A and Requesting Confidential Treatment
Asunto: Motion in Compliance with the January 28 Order Submitting Responses to Attachment A and Requesting Confidential Treatment
|
31/enero/2022
|
2022/01/31
|
Documento
|
Motion in Compliance with the December 28 Order Submitting 167 MW of VPP Resources and Reiterating Request for Confidential Meeting and Extension of Time
Asunto: Motion in Compliance with the December 28 Order Submitting 167 MW of VPP Resources and Reiterating Request for Confidential Meeting and Extension of Time
|
31/enero/2022
|
2022/01/31
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan-First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan
|
28/enero/2022
|
2022/01/28
|
Documento
|
Resolution and Order
Asunto: Appointment of Tranche 2 Independent Coordinator; scheduling of webinar
|
27/enero/2022
|
2022/01/27
|
Documento
|
Third Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process
Asunto: Third Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process
|
25/enero/2022
|
2022/01/25
|
Documento
|
Motion to Submit LUMA’s Presentation for Technical Conference Scheduled for January 25, 2022
Asunto: Submittal of Presentation for Technical Conference
|
20/enero/2022
|
2022/01/20
|
Documento
|
Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process
Asunto: Motion to Reiterate Request for Entry of Resolution and Order Detailing PREPA’s Role in the Tranche 2 RFP Process
|
14/enero/2022
|
2022/01/14
|
Documento
|
CAMBIO Public Comments on the Energy Bureau and PREPA’s Ongoing Procurement of Renewable Energy and Storage
Asunto: CAMBIO public comments
|
11/enero/2022
|
2022/01/11
|
Documento
|
Motion to Restate Request to Lift Imposition of Sanction and Request for Reimbursement of Fine Paid
Asunto: Motion to Restate Request to Lift Imposition of Sanction and Request for Reimbursement of Fine Paid
|
31/diciembre/2021
|
2021/12/31
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan-First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan
|
28/diciembre/2021
|
2021/12/28
|
Documento
|
Memorandum of Law in Support of Request for Confidential Treatment of Draft RFQ/RFP for IRP Consultant and Draft Contract
Asunto: Memorandum of Law in Support of Request for Confidential Treatment of Draft RFQ/RFP for IRP Consultant and Draft Contract Submitted on December 17, 2021
|
27/diciembre/2021
|
2021/12/27
|
Documento
|
Informative Motion Providing Update on Status and Timing of Selection of Virtual Power Plant Resources in Relation to the Tranche 1RFP
Asunto: Informative Motion Providing Update on Status and Timing of Selection of Virtual Power Plant Resources in Relation to the Tranche 1RFP
|
23/diciembre/2021
|
2021/12/23
|
Documento
|
Supplemental Motion Submitting PV Renewable Energy Draft Power Purchase and Operating Agreements (ESSA’s) As Well As Energy Storage Service Agreements (ESSA’s) As Part of PREPA’s Tranche 1 Renewable Generation and Energy Storage Resources RFP for Energy Bureau Evaluation and Approval
Asunto: Supplemental Motion Submitting PV Renewable Energy Draft Power Purchase and Operating Agreements (ESSA’s) As Well As Energy Storage Service Agreements (ESSA’s) As Part of PREPA’s Tranche […]
|
23/diciembre/2021
|
2021/12/23
|
Documento
|
Motion to Submit Report on Resource Planning Process for Next IRP Cycle and Draft RFQ-RFP Consultant and Request for Confidential Treatment
Asunto: Submittal of Report on Resource Planning Process for Next IRP Cycle and Draft RFQ- REP for IRP Consultant and Request for Confidential Treatment
|
17/diciembre/2021
|
2021/12/17
|
Documento
|
Motion Submitting 733 MW of PV Renewable Energy Draft Power Purchase and Operating Agreements Offered in Tranche 1 of PREPA’s Renewable Generation and Energy Storage Resources RFP for Energy Bureau Evaluation and Approval
Asunto: Motion Submitting 733 MW of PV Renewable Energy Draft Power Purchase and Operating Agreements Offered in Tranche 1 of PREPA’s Renewable Generation and Energy Storage Resources […]
|
16/diciembre/2021
|
2021/12/16
|
Documento
|
Resolution and Order
Asunto: Request for Additional Time to Submit the Resource Planning for the Next IRP Cycle and the Draft RFQ and RFP Consultant and Request to Schedule Technical […]
|
15/diciembre/2021
|
2021/12/15
|
Documento
|
Motion Requesting Expedited Appointment of the PREB Independent Coordinator and Resolution and Order Detailing PREPA Role in Anticipation for the Tranche 2 RFP
Asunto: Motion Requesting Expedited Appointment of the PREB Independent Coordinator and Resolution and Order Detailing PREPA Role in Anticipation for the Tranche 2 RFP
|
13/diciembre/2021
|
2021/12/13
|
Documento
|
Motion Submitting Updated Pricing Information Per Technology Group in Compliance with December 3, 2021, Resolution and Order
Asunto: Motion Submitting Pricing Information Per Technology Group in Compliance with December 3, 2021, Resolution and Order
|
08/diciembre/2021
|
2021/12/08
|
Documento
|
Resolution and Order
Asunto: Renewable Energy Generation and Energy Storage Resource Procurement Plan-First Tranche Projects for Phase III Contract Negotiation and Final Interconnection Plan Approvals
|
03/diciembre/2021
|
2021/12/03
|
Documento
|
SESA Comments and Request Regarding Tranche 1 and Tranche 2 Renewable Generation and Energy Storage Resource Procurement; NEPR-MI-2020-0012
Asunto: SESA Comments
|
03/diciembre/2021
|
2021/12/03
|
Documento
|
Informative Motion on Timeline to Submit the Report on Resource Planning for the Next IRP Cycle and the Draft RFQ and RFP for IRP Consultant and Request for Additional Time
Asunto: Informative Motion on Timeline to Submit the Report on Resource Planning for the Next IRP Cycle and the Draft RFQ and RFP for IRP Consultant and […]
|
30/noviembre/2021
|
2021/11/30
|
Documento
|
Motion Requesting Limited Extension of Time of Seven (7) Days to Finalize Phase III of the Tranche I Renewables RFP
Asunto: Motion Requesting Limited Extension of Time of Seven (7) Days to Finalize Phase III of the Tranche I Renewables RFP
|
18/noviembre/2021
|
2021/11/18
|
Documento
|
Motion Submitting Copies of Communications to Proponents Selected to Proceed to Phase III Related to the Tranche 1 RFP
Asunto: Motion submitting Information Relates to Phase III of the Tranche I RFP in compliance with November 8 Resolution and Order
|
12/noviembre/2021
|
2021/11/12
|
Documento
|
Motion Submitting Pricing Information Per Technology Group Regarding the Tranche 1 RFP and Request to Lift Imposition of Sanctions
Asunto: Motion Submitting Pricing Information Per Technology Group Regarding the Tranche 1 RFP and Request to Lift Imposition of Sanctions
|
09/noviembre/2021
|
2021/11/09
|
Documento
|
Resolution and Order
Asunto: Noncompliance with Request for Submittal of the Results of Selection of Proposals for Phase III Evaluation and Imposition of Administrative Fine
|
08/noviembre/2021
|
2021/11/08
|
Documento
|
Informative Motion on Status of Activities Related to Next IRP Cycle, Request for Extension to File Documents, and Request to Schedule Technical Conference
Asunto: Informative Motion on Status of Activities Related to Next IRP Cycle, Request for Extension to File Documents, and Request to Schedule Technical Conference
|
05/noviembre/2021
|
2021/11/05
|
Documento
|
Resolution and Order
Asunto: Energy Bureau-Appointed Independent Coordination for Tranche 2 RFP
|
29/octubre/2021
|
2021/10/29
|
Documento
|
Motion to Supplement Attachment a of «Response to, and Motion for Clarification of, October 12, 2021 Resolution and Order Addressing the Target Date for Issuance of the Tranche 2 RFP and Other Matters»
Asunto: Response to, and Motion for Clarification of, October 12, 2021 Resolution and Order Addressing the Target Date for Issuance of the Tranche 2 RFP and Other […]
|
19/octubre/2021
|
2021/10/19
|
Documento
|
Response to, and Motion for Clarification of, October 12, 2021 Resolution and Order Addressing the Target Date for Issuance of the Tranche 2 RFP and Other Matters
Asunto: Response to, and Motion for Clarification of Energy Bureau Resolution and Order for October 12, 2021 Addressing Target Date for Issuance of Tranche 2 RFP and […]
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Motion Submitting Tranche 2 Request for Proposals for Renewable Energy Generation and Energy Storage Resources
Asunto: Appendix G_ESSA_01_Standalone_RE RFP 2 (Draft Publication Version)
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Motion Submitting Tranche 2 Request for Proposals for Renewable Energy Generation and Energy Storage Resources
Asunto: Appendix R_ESSA_01_ITC Compliant_RE RFP 2 (Draft Publication Version)
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Motion Submitting Tranche 2 Request for Proposals for Renewable Energy Generation and Energy Storage Resources
Asunto: Tranche 2_RE RFP (Draft Publication Version)
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Motion Submitting Tranche 2 Request for Proposals for Renewable Energy Generation and Energy Storage Resources
Asunto: Appendix Q_GSA_01_RE RFP 2 (DRAFT Publication Version)
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Motion Submitting Tranche 2 Request for Proposals for Renewable Energy Generation and Energy Storage Resources
Asunto: Appendix F_PPOA_01_RE RFP 2 (Draft Publication Version)
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Motion Submitting Tranche 2 Request for Proposals for Renewable Energy Generation and Energy Storage Resources
Asunto: Appendix D_Proposal Data Forms
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Motion Submitting Tranche 2 Request for Proposals for Renewable Energy Generation and Energy Storage Resources
Asunto: Tranche 2 RFP
|
15/octubre/2021
|
2021/10/15
|
Documento
|
Documento no encontrado.
Asunto: Appendix F_PPOA_01_RE RFP 2 (Draft Publication Version)
|
13/octubre/2021
|
2021/10/13
|
|
Resolution and Order
Asunto: Target Date for Issuance of Tranche 2 RFP
|
12/octubre/2021
|
2021/10/12
|
Documento
|
Motion to Submit Timeline of Anticipated Installations of Battery Storage and Renewable Energy Resources
Asunto: Motion to Submit Timeline of Anticipated Installations of Battery Storage and Renewable Energy Resources
|
24/septiembre/2021
|
2021/09/24
|
Documento
|
Motion to Submit Proposals Under Seal and Request for Confidential Designation
Asunto: Motion to Submit Proposals Under Seal and Request for Confidential Designation
|
20/septiembre/2021
|
2021/09/20
|
Documento
|
Motion to Clarify Request for Extension of Dates for Notification of Proponents Being Selected for Phase III Negotiations and for Submission of Pricing Information Per Technology Group
Asunto: Motion to Clarify Request for Extension of Dates for Notification of Proponents Being Selected for Phase III Negotiations and for Submission of Pricing Information Per Technology […]
|
19/septiembre/2021
|
2021/09/19
|
Documento
|
Motion for Extension of Dates for Notification of Proponents Being Selected for Phase III Negotiations, for Submission of Pricing Information per Technology Group and for Additional Time to Issue the Tranche 2 RFP
Asunto: Request to Extend Dates for Notification of Proponents Selected to Proceed to Phase III and Modification of Target Date for Issuance of Tranche 2 RFP
|
17/septiembre/2021
|
2021/09/17
|
Documento
|
Resolution and Order
Asunto: Target Date for Issuance of Tranche 2 RFP
|
17/septiembre/2021
|
2021/09/17
|
Documento
|
Resolution and Order
Asunto: Joint motion Requesting Clarification of July 23, 2021 Resolution and Order
|
15/septiembre/2021
|
2021/09/15
|
Documento
|
Joint Motion Requesting Clarification of a Portion of the Energy Bureau’s Resolution and Order of July 23, 2021
Asunto: Request for Clarification of a Portion of Energy Bureau’s Resolution and Order of July 23, 2021
|
10/septiembre/2021
|
2021/09/10
|
Documento
|
Comments Alten Energy
Asunto: Comments Alten Energy
|
09/septiembre/2021
|
2021/09/09
|
Documento
|
Motion for Extension of Time to Submit Information Requested on Resolution and Order Dated August 26, 2021, Including Information Related to Pricing
Asunto: Request For Information and Target Date for Issuance of Tranche 2 RFP
|
08/septiembre/2021
|
2021/09/08
|
Documento
|
SESA Concerns Regarding Tranche 1 and Tranche 2 Renewable Generation and Energy Storage Resource Procurement
Asunto: SESA Concerns Regarding Tranche 1 and Tranche 2 Renewable Generation and Energy Storage Resource Procurement
|
26/agosto/2021
|
2021/08/26
|
Documento
|
Resolution and Order
Asunto: Request for information and Target Date for Insurance of Tranche 2 RFP
|
26/agosto/2021
|
2021/08/26
|
Documento
|
Motion to Submit Responses in Compliance with Resolution and Order Entered on August 6, 2021
Asunto: Motion to Submit Responses in Compliance with Resolution and Order Entered on August 6, 2021
|
13/agosto/2021
|
2021/08/13
|
Documento
|
Motion to Submit Responses to in Compliance with Resolution and Order Entered on August 6, 2021
Asunto: Motion to Submit Responses to in Compliance with Resolution and Order Entered on August 6, 2021
|
13/agosto/2021
|
2021/08/13
|
Documento
|
Resolution and Order
Asunto: Request for Information
|
06/agosto/2021
|
2021/08/06
|
Documento
|
Joint Motion to Revised Update Procurement Plan
Asunto: Joint Motion to Submit Revised Update Procurement Plan
|
23/julio/2021
|
2021/07/23
|
Documento
|
Resolution and Order
Asunto: Wind Study
|
23/julio/2021
|
2021/07/23
|
Documento
|
Motion to Inform and Request for Extension of Time
Asunto: Motion to Inform and Request for Extension of Time
|
20/julio/2021
|
2021/07/20
|
Documento
|
Motion to Submit Presentation to be Projected by PREPA During the July 6, 2021 Technical Conference
Asunto: Motion to Submit Presentation to be Projected by PREPA During the July 6, 2021 Technical Conference
|
06/julio/2021
|
2021/07/06
|
Documento
|
Notice of Appearance and Request for Notice
Asunto: Notice of Appearance and Request for Notice
|
02/julio/2021
|
2021/07/02
|
Documento
|
SESA Comments and Request on PREPA Motions Regarding Tranche 1 and Tranche 2 Renewable Generation and Energy Storage Resource Procurement
Asunto: SESA Comments
|
01/julio/2021
|
2021/07/01
|
Documento
|
Urgent Motion for Reconsideration of the June 30, 2021 Order
Asunto: Urgent Motion for Reconsideration of the June 30, 2021 Order
|
01/julio/2021
|
2021/07/01
|
Documento
|
Resolution and Orden
Asunto: Request for Extension of Time for filing of Presentation and Rescheduling of Technical Conference
|
01/julio/2021
|
2021/07/01
|
Documento
|
Resolution and Prder
Asunto: Request for Extension of Time for filing of Presentation and Rescheduling of Technical Conference
|
30/junio/2021
|
2021/06/30
|
Documento
|
Request of The Puerto Rico Electric Power Authority for Extension of Time to File Presentation on Changes Incorporated in Updated Procurement Plan and for a Continuance of the Technical Conference Currently Scheduled for July 6, 2021
Asunto: Request for Extension of Time to File Presentation on Update Procurement Plan and for Continuance of Technical Conference Required by June 24,2021 Resolution and Order […]
|
29/junio/2021
|
2021/06/29
|
Documento
|
Motion in Compliance with Order Entered on June 14, 2021 Submitting Redline Version of the Updated Procurement Plan
Asunto: Update Procurement Plan
|
28/junio/2021
|
2021/06/28
|
Documento
|
Resolution And Order
Asunto: Update Procurement Plan
|
24/junio/2021
|
2021/06/24
|
Documento
|
SESA’s Comments on PREPA’s Motion on Updated Procurement Plan Addressing the Second Renewable Generation and Energy Storage Resource Procurement Tranche
Asunto: SESA’s Comments on PREPA’s Motion on Updated Procurement Plan Addressing the Second Renewable Generation and Energy Storage Resource Procurement Tranche
|
24/junio/2021
|
2021/06/24
|
Documento
|
Motion to Submit Updated Procurement Plan Addressing Plans for the Second Renewable Generation and Energy Storage Resource Procurement Tranche
Asunto: Updated Procurement Plan
|
15/junio/2021
|
2021/06/15
|
Documento
|
Resolution and Order
Asunto: Request for Extension of time
|
03/junio/2021
|
2021/06/03
|
Documento
|
Request of The Puerto Rico Electric Power Authority for Additional Time to Issue Second Renewable Generation and Energy Storage Resource Procurement Tranche and to Submit Timeline for Anticipated Installation of Battery Storage and Renewable Energy Resources
Asunto: Request for Extensions of Time to Issue Tranche 2 Request for Proposals and to Submit Timeline for Anticipated Installation of Battery Storage and Renewable Energy Resources […]
|
29/mayo/2021
|
2021/05/29
|
Documento
|
Resolution and Order
Asunto: PREPA’s Response to May 21, 2021 Resolution and Order Addressing SESA Comments Request and Extension of Time for Submission of Proposals to Renewable Generation and Energy […]
|
27/mayo/2021
|
2021/05/27
|
Documento
|
Response of the Puerto Rico Electric Power Authority to May 21, 2021 Resolution and Order Addressing Comments Presented by the Solar and Energy Storage Association of Puerto Rico and Statement of Support for Extension of Time for Submission of Proposals in Renewable Generation and Energy Storage Resource RFP Tranche 1
Asunto: PREPA’s Response to May 21, 2021 Resolution and Order Addressing SESA Request
|
24/mayo/2021
|
2021/05/24
|
Documento
|
Resolution and Order
Asunto: Request for Consideration of Content and Schedule Changes
|
21/mayo/2021
|
2021/05/21
|
Documento
|
SESA’s Further Comments on Implementation of PREPA’s Procurement Plan
Asunto: SESA’s Comments
|
19/mayo/2021
|
2021/05/19
|
Documento
|
Motion Submitting Detailed Plan to Address and Solve Any Potential Long-Term Renewable Energy Penetration Issues
Asunto: Plan to Address and Solve Potential Long-Term Renewable Energy Penetration Issues
|
17/mayo/2021
|
2021/05/17
|
Documento
|
Resolution and Order
Asunto: Request for Extension of Time to File Update Procurement Plan Required by December 8, 2020 Resolution and Order
|
11/mayo/2021
|
2021/05/11
|
Documento
|
Request of the PREPA for Extension of Time to File an Updated Procurement Plan Addressing Plans for the Second Renewable Generation and Energy Storage Resource Procurement Tranche
Asunto: Request for Extension of Time to File an Updated Procurement Plan Required by December 8, 2020 Resolution and Order
|
30/abril/2021
|
2021/04/30
|
Documento
|
SESA’s Comments on Implementation of PREPA’s Procurement Plan
Asunto: SESA’s Comments
|
21/abril/2021
|
2021/04/21
|
Documento
|
Comentarios Solaner Puerto Rico One LLC- Informe sobre Criterios para Evaluar Proyectos Renovables
Asunto: Comentarios Solaner Puerto Rico One, LLC
|
06/abril/2021
|
2021/04/06
|
Documento
|
Motion Requesting Extension of Time to Submit Detailed Plan to Address and Solve Any Potential Long-Term Renewable Energy Penetration Issues
Asunto: Extension of Time to Submit Plan to Address and Solve Any Potential Long-Term Renewable Energy Penetration Issues
|
31/marzo/2021
|
2021/03/31
|
Documento
|
Moción sobre Intervención o Participación, Solicitud de Cumplimiento de Ley y Otros Remedios
Asunto: Solicitud de Cumplimiento de Ley
|
15/marzo/2021
|
2021/03/15
|
Documento
|
Motion in Compliance with Order Submitting Information on Weighted Criteria Used to Evaluate and Choose the Projects to Acquire 150 MW of Renewable Energy
Asunto: Motion in Compliance with February 3, 2021 Orden, and Request for Confidential Treatment
|
15/marzo/2021
|
2021/03/15
|
Documento
|
Motion Compliance with Order Submitting Redacted List of Projects PREPA will Potentially Choose to Acquire 150 MW of Renewable Energy
Asunto: Motion to Compliance with February 3, 2021 Order, and Request for Confidential Treatment
|
08/marzo/2021
|
2021/03/08
|
Documento
|
Resolution and Order
Asunto: Motion in Compliance with February 3, 2021 Order, and Request for Confidential Treatment of Information
|
03/marzo/2021
|
2021/03/03
|
Documento
|
Motion to Clarify PREPA’s Webpage Public Link Access to Renewables RFP Tranche 1
Asunto: Issuance of Renewables RFP Tranche 1
|
24/febrero/2021
|
2021/02/24
|
Documento
|
Motion Informing Issuance of Renewables RFP Tranche 1
Asunto: Issuance of Renewables RFP Tranche 1
|
22/febrero/2021
|
2021/02/22
|
Documento
|
Motion in Compliance with Order Submitting Responses to Stakeholder’s Questions
Asunto: Issuance of RFP and timeline for filing responses to questions received from stakeholders
|
16/febrero/2021
|
2021/02/16
|
Documento
|
Comentarios – PBJL Energy Corporation
Asunto: Comentarios – PBJL Energy Corporation – NEPR-MI-2020-0012
|
16/febrero/2021
|
2021/02/16
|
Documento
|
Motion Compliance with Order Submitting List of Projects PREPA will Potentially Choose to Acquire 150 MW Renewable
Asunto: Draft Procurement Plan
|
09/febrero/2021
|
2021/02/09
|
Documento
|
Motion Compliance with Order Submitting Renewables RFP Package with Modifications Requested by the Financial Oversight and Management Board for Puerto Rico and Draft Communications
Asunto: Draft Procurement Plan
|
05/febrero/2021
|
2021/02/05
|
Documento
|
Resolution and Order
Asunto: Modifications to RFP required by the Financial Oversight & Management Board for Puerto Rico
|
03/febrero/2021
|
2021/02/03
|
Documento
|
Motion Submitting Letter from the Financial Oversight and Management Board for Puerto Rico Regarding Procurement Plan and Renewables RFS Recommendation
Asunto: Letter for the Financial Oversight Management Board for Puerto Rico
|
29/enero/2021
|
2021/01/29
|
Documento
|
Resolution and Order
Asunto: Issuance of RFP and timeline for filing of responses to questions received for stakeholders
|
26/enero/2021
|
2021/01/26
|
Documento
|
SESA – Written Questions Regarding Pending PREPA RFP for 1000MW Renewable Energy & 500 MW Storage
Asunto: SESA – Written Questions Regarding Pending PREPA RFP for 1000MW Renewable Energy & 500 MW Storage – NEPR-MI-2020-0012
|
19/enero/2021
|
2021/01/19
|
Documento
|
Local Environmental Organizations’Additional Questions for PREPA
Asunto: Additional Question for PREPA
|
19/enero/2021
|
2021/01/19
|
Documento
|
Comentarios Alten Energy
Asunto: Comentarios Alten Energy
|
19/enero/2021
|
2021/01/19
|
Documento
|
Windmar-Stakeholders Meeting additional questions of Request for Proposals
Asunto: Additional questions of Request for Proposals
|
19/enero/2021
|
2021/01/19
|
Documento
|
Motion in Compliance with Order Submitting Preferred Interconnection Regions Map
Asunto: Draft Procurement Plan
|
13/enero/2021
|
2021/01/13
|
Documento
|
Resolution
Asunto: Request for Confidential Designation and Treatment
|
12/enero/2021
|
2021/01/12
|
Documento
|
Motion for Reconsideration and Modification of January 7, 2021 Resolution on Request for Confidential Designation and Treatment of Identifying Preferred Locations for Interconnection
Asunto: Draft Procurement Plan – Request for Temporary Confidential Designation and Treatment of Preferred Interconnection Location Information
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 04 SL Renewable Integration Study of Puerto Rico 22Dec2020_Redacted_02
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 RE RFP_Appendix I_Interconnection_Wind
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 Solar PPOA_RE RFP_02 – Appendix E_Form of Solar PPOA
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 RE RFP_Appendix I_Interconnection_Solar
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 RE RFP_Appendix I_Interconnection_BESS
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 RE RFP_Appendix C_Proposal Data Forms
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 RE RFP_Appednix H_MTRs
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 RE RFP_02B (PREB Submittal Version II)
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 03 Appendix F_Form of Energy Storage Services Agreement – Appendix F_Form of Energy Storage Services Agreement Redacted
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: 02 Procurement Plan Appendix B_22Dec2020
|
11/enero/2021
|
2021/01/11
|
Documento
|
Motion in Compliance with Order Submitting Redacted/ Public Versions of Request for Proposal (RFP) and Appendices
Asunto: Draft Procurement Plan
|
11/enero/2021
|
2021/01/11
|
Documento
|
Resolution
Asunto: Request for Confidential Designation and Treatment
|
07/enero/2021
|
2021/01/07
|
Documento
|
Resolution and Order
Asunto: Ruling on Motion titled Motion for Reconsideration of the Resolution and Order on the Evaluation of Puerto Rico Electric Power Authority’s Draft Procurement Plan.
|
07/enero/2021
|
2021/01/07
|
Documento
|
Motion to Submit Notarized Affidavit
Asunto: Draft Procurement Plan
|
23/diciembre/2020
|
2020/12/23
|
Documento
|
Request for Confidencial Designation and Supporting Memorandum of Law
Asunto: Draft Procurement Plan
|
23/diciembre/2020
|
2020/12/23
|
Documento
|
Motion in Compliance with Order Submitting Final Procurement Plan and Associated Request for Proposal
Asunto: Draft Procurement Plan
|
22/diciembre/2020
|
2020/12/22
|
Documento
|
Motion for Reconsideration of Resolution and Order on Draft Procurement Plan
Asunto: Draft Procurement Plan
|
22/diciembre/2020
|
2020/12/22
|
Documento
|
Request for Term to Submit Affidavit and Apostille
Asunto: Draft Procurement Plan
|
22/diciembre/2020
|
2020/12/22
|
Documento
|
Resolution and Order
Asunto: Evaluation of Draft Procurement Plan
|
08/diciembre/2020
|
2020/12/08
|
Documento
|
PREPA-Third Motion Reiterating Request for Technical Conference
Asunto: Procurement Plan
|
02/diciembre/2020
|
2020/12/02
|
Documento
|
Motion to Reiterate Request for Technical Conference
Asunto: Procurement Plan
|
23/noviembre/2020
|
2020/11/23
|
Documento
|
Motion to Submit Presentation for Technical Conference
Asunto no disponible.
|
17/noviembre/2020
|
2020/11/17
|
Documento
|
Resolution and Order
Asunto: Notice of Appearance
|
06/noviembre/2020
|
2020/11/06
|
Documento
|
Request for Technical Conference
Asunto: Procurement Plan
|
05/noviembre/2020
|
2020/11/05
|
Documento
|
Motion Submitting Draft Procurement Plan
Asunto: Draft Procurement Plan
|
23/octubre/2020
|
2020/10/23
|
Documento
|
Local Environmental Organization’ Public Comment on PREPA Status Report
Asunto: Public Comment on PREPA Status Report
|
20/octubre/2020
|
2020/10/20
|
Documento
|
Motion Clarify
Asunto: Procurement Plan
|
09/octubre/2020
|
2020/10/09
|
Documento
|
Resolution and Order
Asunto: Resolution and Order opening the instant docket to implement the Puerto Rico Electric Power Authority’s Integrated Resource Plan and Modified Action Plan
|
06/octubre/2020
|
2020/10/06
|
Documento
|
Notice of Appearance and Request for Notice
Asunto: Notice od Appearance.
|
06/octubre/2020
|
2020/10/06
|
Documento
|
Second Request for Technical Conference
Asunto: Procurement Plan
|
02/octubre/2020
|
2020/10/02
|
Documento
|
Presentation of Status Report on the Development of PREPA’s Draft Procurement Plan
Asunto: Procurement Plan
|
23/septiembre/2020
|
2020/09/23
|
Documento
|