Expediente: NEPR-MI-2019-0016
In Re: Informes de Progreso de Interconexión de la Autoridad de Energía Eléctrica de Puerto RicoDocumentos Publicados: 97
Documentos | Fecha | Descargar |
---|---|---|
Notificación de Renuncia a Representación Legal Subject: Notificación de Renuncia a Representación Legal | 16/febrero/2023 | File |
Motion Submitting Interconnections Progress Report for October Through December 2022 and Presentation for Next Compliance Hearing Subject: 20230113 MI20190016 Anejo 2 Datos-NEPR-MI-2019-0016 (3) | 13/enero/2023 | File |
Motion Submitting Interconnections Progress Report for October Through December 2022 and Presentation for Next Compliance Hearing Subject: Anejo 1 Datos-Energia-Renovable | 13/enero/2023 | File |
Motion Submitting Interconnections Progress Report for October Through December 2022 and Presentation for Next Compliance Hearing Subject: Motion Submitting LUMA’s Interconnections Progress Report for October Through December 2022 and Presentation for Next Compliance Hearing | 13/enero/2023 | File |
Second Motion Submitting Response in Compliance with Bench Order Issued at the Hearing Held on October 28, 2022 Subject: Second Motion Submitting Response in Compliance with Bench Order Issued at the Hearing Held on October 28, 2022 | 14/noviembre/2022 | File |
Motion Submitting Responses in Compliance with Bench Order Issued at the Hearing Held on October 28, 2022 Subject: EXHIBIT 2 1M 10K Summary – NEPR-MI-2019-0016 | 01/noviembre/2022 | File |
Motion Submitting Responses in Compliance with Bench Order Issued at the Hearing Held on October 28, 2022 Subject: Motion Submitting Responses in Compliance with Bench Order Issued at the Hearing Held on October 28, 2022 | 01/noviembre/2022 | File |
Motion Submitting Revised Presentation for the Compliance Hearing Set for October 28, 2022 Subject: Motion Submitting Revised Presentation for the Compliance Hearing Set for October 28, 2022 | 26/octubre/2022 | File |
Motion Submitting Interconnections Progress Report for July Through September 2022 and Presentation for Next Compliance Hearing Subject: 22.10.26_Anejo 2 Datos- Energía Renovable – NEPR-MI-2019-0016 | 26/octubre/2022 | File |
Motion Submitting Interconnections Progress Report for July Through September 2022 and Presentation for Next Compliance Hearing Subject: 22.10.26_Anejo 1 Datos-NEPR-MI-2019-0016 | 26/octubre/2022 | File |
Motion Submitting Interconnections Progress Report for July Through September 2022 and Presentation for Next Compliance Hearing Subject: Motion Submitting Interconnections Progress Report for July Through September 2022 and Presentation for Next Compliance Hearing | 26/octubre/2022 | File |
Resolution and Order Subject: Response to Request to Modify Quarterly Progress Reports and Scheduling a Technical Conference. | 15/septiembre/2022 | File |
Request to Modify Quarterly Progress Reports and Schedule for Submitting Progress Reports Subject: Request to Modify Quarterly Progress Reports and Schedule for Submitting Progress Reports | 31/agosto/2022 | File |
Motion Submitting Interconnections Progress Report for May Through July 2022 and Presentation for Next Compliance Hearing Subject: Anejo 2 Datos-Energía-Renovable-NEPR-MI-2019-0016 (16 ago 22) | 15/agosto/2022 | File |
Motion Submitting Interconnections Progress Report for May Through July 2022 and Presentation for Next Compliance Hearing Subject: Anejo 1 Datos-NEPR-MI-2019-0016 (16 ago 22) | 15/agosto/2022 | File |
Motion Submitting Interconnections Progress Report for May Through July 2022 and Presentation for Next Compliance Hearing Subject: Motion Submitting Interconnections Progress Report for May Through July 2022 and Presentation for Next Compliance Hearing | 15/agosto/2022 | File |
Motion Submitting DG Interconnection RFI Responses in Compliance with Bench Order Issued at the Hearing Held on May 18, 2022 and to Submit Revised Distributed Generation Systems Data File Subject: 22.06.02_Anejo 2 Datos-Energía-Renovable-NEPR-MI-2019-0016 | 02/junio/2022 | File |
Motion Submitting DG Interconnection RFI Responses in Compliance with Bench Order Issued at the Hearing Held on May 18, 2022 and to Submit Revised Distributed Generation Systems Data File Subject: Motion Submitting DG Interconnection RFI Responses in Compliance with Bench Order Issued at the Hearing Held on May 18, 2022 and to Submit Revised Distributed Generation […] | 02/junio/2022 | File |
SESA-Questions About LUMA’s May 13 th / 17 th Net Metering Report Filing for February -April 2022 Time Frame Subject: SESA-Questions About LUMA’s May 13 th / 17 th Net Metering Report Filing for February -April 2022 Time Frame | 18/mayo/2022 | File |
Motion Submitting Revised Presentation for the Compliance Hearing Set for May 18, 2022 Subject: Motion Submitting Revised Presentation for the Compliance Hearing Set for May 18, 2022 | 17/mayo/2022 | File |
Motion Submitting Interconnections Progress Report for February Through April 2022 and Presentation for Compliance Hearing Set for May 18, 2022 Subject: Anejo 2 Datos-Energía-Renovable | 13/mayo/2022 | File |
Motion Submitting Interconnections Progress Report for February Through April 2022 and Presentation for Compliance Hearing Set for May 18, 2022 Subject: Anejo 1 Datos | 13/mayo/2022 | File |
Motion Submitting Interconnections Progress Report for February Through April 2022 and Presentation for Compliance Hearing Set for May 18, 2022 Subject: Motion Submitting Interconnections Progress Report for February Through April 2022 and Presentation for Compliance Hearing Set for May 18, 2022 | 13/mayo/2022 | File |
Notice of Appearance and Request for Notice Subject: Notice of Appearance and Request for Notice | 06/abril/2022 | File |
Motion Submitting DG Interconnection RFI Responses in Compliance with Bench Order Issued at the Hearing Held on February 23, 2022 Subject: Anejo 2 Datos-Energía-Renovable | 17/marzo/2022 | File |
Motion Submitting DG Interconnection RFI Responses in Compliance with Bench Order Issued at the Hearing Held on February 23, 2022 Subject: Anejo 1_Notificaciones Emitidas por PREPLUMA-Proyectos Expeditos GDL17 | 17/marzo/2022 | File |
Motion Submitting DG Interconnection RFI Responses in Compliance with Bench Order Issued at the Hearing Held on February 23, 2022 Subject: Motion Submitting DG Interconnection RFI Responses in Compliance with Bench Order Issued at the Hearing Held on February 23, 2022 | 17/marzo/2022 | File |
Resolution and Order Subject: LUMA’s Request for an Extension of Time to Comply with Bench Order Issued at the Hearing Held on February 23, 2022 | 15/marzo/2022 | File |
Request for an Extension of Time to Comply with Bench Order Issued at the Hearing Held on February 23, 2022 Subject: Request for an Extension of Time to Comply with Bench Order Issued at the Hearing Held on February 23, 2022 | 10/marzo/2022 | File |
Motion Submitting Interconnections Progress Report for November 2021 Through January 2022 and Presentation for Compliance Hearing Set for February 23, 2022 Subject: Exhibit 2 Datos-Energía-Renovable-NEPR-MI-2019-0016 | 18/febrero/2022 | File |
Motion Submitting Interconnections Progress Report for November 2021 Through January 2022 and Presentation for Compliance Hearing Set for February 23, 2022 Subject: Exhibit 1 Informe-NEPR-MI-2019-0016 – FINAL | 18/febrero/2022 | File |
Motion Submitting Interconnections Progress Report for November 2021 Through January 2022 and Presentation for Compliance Hearing Set for February 23, 2022 Subject: Motion Submitting LUMA’s Interconnections Progress Report for November 2021 Through January 2022 and Presentation for Compliance Hearing Set for February 23, 2022 | 18/febrero/2022 | File |
Resolución y Orden Subject: Modificación fecha Vista de Cumplimiento | 07/febrero/2022 | File |
Motion Submitting DG Interconnection Informational Memo in Compliance with Bench Order Issued at the Hearing Held on November 18, 2021 Subject: Motion Submitting DG Interconnection Informational Memo in Compliance with Bench Order Issued at the Hearing Held on November 18, 2021 | 20/enero/2022 | File |
Motion Submitting Revised Interconnections Progress Report, Presentation of the Compliance Hearing Held on November 18, 202 and Statistic Requested by the ICPO Subject: Anejo 1 Datos-NEPR-MI-2019-0016 vFinal | 23/noviembre/2021 | File |
Motion Submitting Revised Interconnections Progress Report, Presentation of the Compliance Hearing Held on November 18, 202 and Statistic Requested by the ICPO Subject: Submitting LUMA’s Revised Interconnections Progress Report, Presentation of the Compliance Hearing Held on November 18, 202 and Statistic Requested by the ICPO | 23/noviembre/2021 | File |
Motion Submitting Revised Presentation for the Compliance Hearing Set for November 18, 2021 Subject: Motion Submitting Revised Presentation for the Compliance Hearing Set for November 18, 2021 | 17/noviembre/2021 | File |
Motion Submitting Interconnections Process Report for August Through October 2021 and Presentation for Compliance Hearing Set for November 18, 2021 Subject: Anejo 2 Datos-Energía-Renovable-NEPR-MI-2019-0016vFinal | 15/noviembre/2021 | File |
Motion Submitting Interconnections Process Report for August Through October 2021 and Presentation for Compliance Hearing Set for November 18, 2021 Subject: Anejo 1 Datos-NEPR-MI-2019-0016 vFinal | 15/noviembre/2021 | File |
Motion Submitting Interconnections Process Report for August Through October 2021 and Presentation for Compliance Hearing Set for November 18, 2021 Subject: Motion Submitting Interconnections Process Report for August Through October 2021 and Presentation for Compliance Hearing Set for November 18, 2021 | 15/noviembre/2021 | File |
Resolución y Orden Subject: Modificación Fecha Vista de Cumplimiento | 17/septiembre/2021 | File |
Motion in Compliance with Order Subject: Motion in Compliance with Order | 13/septiembre/2021 | File |
Resolution Nunc Pro Tunc Subject: Calendario sobre Vistas de Cumplimineto | 31/agosto/2021 | File |
Resolución y Orden Subject: Requisito de Presentación de Plan para Atender Acumulación de Solicitudes; Vista de Cumplimiento | 27/agosto/2021 | File |
Motion to Inform LUMA’S Plans and Schedule to Submit the Information Requested During August 16, 2021 Hearing Subject: Motion to Inform Energy Bureau of LUMA’S Plans and Schedule to Submit the Information Requested During August 16, 2021 Hearing | 23/agosto/2021 | File |
Motion to Show Cause in Response to August 6, 2021 Order Subject: Motion to Show Cause | 13/agosto/2021 | File |
Moción para Presentar Informe de Progreso de Interconexión, Presentación a Utilizarse en la Vista del 16 de agosto de 2021 y Plan o Estrategia para Atender el Backlog Subject: Anejo 2 Datos – Energía-Renovable | 13/agosto/2021 | File |
Moción para Presentar Informe de Progreso de Interconexión, Presentación a Utilizarse en la Vista del 16 de agosto de 2021 y Plan o Estrategia para Atender el Backlog Subject: Anejo 1 Datos – Requeridos por Resolución y Orden | 13/agosto/2021 | File |
Moción para Presentar Informe de Progreso de Interconexión, Presentación a Utilizarse en la Vista del 16 de agosto de 2021 y Plan o Estrategia para Atender el Backlog Subject: Informe de Progreso de Interconexión para el mes de agosto de 2021 y Vista de Cumplimiento | 13/agosto/2021 | File |
Resolucción y Orden Subject: Informe de Progreso para el mes de agosto de 2021 y Vista de Cumplimiento | 06/agosto/2021 | File |
SESA-PR Comments and Requests on PREPA Net Metering and Interconnection Compliance Report Subject: Submittal of Interconnection Progress Reports and Technical Conference | 08/junio/2021 | File |
Presentación de la Autoridad de Energía Eléctrica a Proyectarse Durante Vista de Cumplimiento del 8 de junio de 2021 Subject: Vista de Cumplimiento de junio de 2021 | 07/junio/2021 | File |
Motion Submitting Presentation for Compliance Hearing Set for June 8, 2021 Subject: Motion Submitting LUMA’s Presentation for the June 8th Compliance Hearing | 03/junio/2021 | File |
Notice of Appearance and Request for Notice Subject: Notice of Appearance and Request for Notice | 31/mayo/2021 | File |
SESA – Comments and Petition for Corrections Subject: Submittal of Interconnection Progress Reports and Technical Conference | 20/mayo/2021 | File |
Moción para Presentar Informe de Progreso Parcial y Solicitud de Extensión de Término Subject: Exhibit B-Datos-Energía-Renovable-NEPR-MI-2019-0016 actualizado mayo – NEPR-MI-2019-0016 | 12/mayo/2021 | File |
Moción para Presentar Informe de Progreso Parcial y Solicitud de Extensión de Término Subject: Exhibit A-Datos ORDEN NEPR-MI-2019-0016 (Informe Trimestral mayo 2021) – NEPR-MI-2019-0016 | 12/mayo/2021 | File |
Moción para Presentar Informe de Progreso Parcial y Solicitud de Extensión de Término Subject: Informe de Progreso de Interconexión; Solicitud de Extensión de Término | 12/mayo/2021 | File |
Resolución y Orden Subject: Solicitud de Intervención de la OIPC | 07/mayo/2021 | File |
Resolución y Orden Subject: Modificación Calendario de Visttas de Cumplimiento | 07/mayo/2021 | File |
Motion for Leave to Submit Comments Subject: Submittal of Interconnection Progress Reports and Technical Conference | 05/mayo/2021 | File |
Moción Informativa sobre Portal de Radicación Electrónica Subject: Moción Informativa | 04/mayo/2021 | File |
Escrito Suplementario a Comentarios y Recomendaciones Radicadas por la Oficina Independiente de Protección al Consumidor (OIPC) con Relación a los Procesos de Interconexión de Sistemas de Distribución Ante la Autoridad Subject: Comentarios y Recomendaciones de la OIPC a Informe de Proceso de Interconexión de Sistema de Distribución de la Autoridad de Energía Eléctrica | 29/abril/2021 | File |
Comentarios y Recomendaciones de la Oficina Independiente de Protección al Consumidor con Relación a los Procesos de Interconexión de Sistema de Distribución Ante la Autoridad Subject: Comentarios y Recomendaciones de la OIPC a Informes de Progreso de Interconexión de la Autoridad de Energía Eléctrica | 09/abril/2021 | File |
Presentación a ser Utilizada Durante Vista de Cumplimiento del 19 de febrero de 2021 Subject: Vista de Cumplimiento de 19 de febrero de 2021 | 17/febrero/2021 | File |
Moción para Presentar el Informe de Progreso Interconexión Subject: Informe de Progreso de Interconexión | 16/febrero/2021 | File |
Moción para Unirse a Representación Legal Subject: Notificación de Representación Legal (Lcdo. Rafael Edgado Gozález) | 11/febrero/2021 | File |
Escrito Urgente Notificando la Intervención de la OIPC Subject: Escrito Notificando la Intervención de la Oficina Independiente de Protección al Consumidor | 10/febrero/2021 | File |
Resolución y Orden Subject: Moción en Solicitud de Modificación a Calendario de Vistas de Cumplimiento | 15/enero/2021 | File |
Notice of Appearance and Request for Notice Subject: Notice of Appearance | 14/enero/2021 | File |
Moción en Solicitud de Modificación a Calendario de Vista de Cumplimiento Subject: Vista de Cumplimiento | 08/enero/2021 | File |
Resolución y Orden Subject: Enmienda a Resolución y Orden de 21 dejulio de 2020 | 20/noviembre/2020 | File |
Resolución y Orden Subject: Solicitud de Trato Confidencial | 17/noviembre/2020 | File |
Moción para Presentar los Datos de octubre 2020 y Reiterando Solicitud de Enmienda a la Orden del 21 de julio de 2020 Subject: Informe Trimestral | 12/noviembre/2020 | File |
Solicitud de Trato Confidencial a Documentos Anejados a la Moción Presentando el Informe Trimestral de Interconexión Subject: Solicitud de Trato Confidencial | 08/noviembre/2020 | File |
Resolución y Orden Subject: Vista de Cumplimiento de 10 de noviembre de 2020 | 05/noviembre/2020 | File |
Moción en Cumplimiento de Orden Subject: Cumplimiento de Orden | 30/octubre/2020 | File |
Resolución y Orden Subject: Cumplimiento de Orden parcial; Solicitud de Término adicional | 05/octubre/2020 | File |
Moción en Cumplimiento de Orden Parcial y Solicitud de Término Adicional Subject: Cumplimiento de Orden parcial; Solicitud de Término adicional | 01/octubre/2020 | File |
Resolución y Orden Subject: Información Adicional | 30/septiembre/2020 | File |
Notificación de Representación Legal Subject: Notificación de Representación Legal | 30/septiembre/2020 | File |
Windmar-Solicitud de Información Subject: Incumplimiento de la Autoridad de Energía Eléctrica deber de Proveer Información | 22/septiembre/2020 | File |
ICSE-Solicitud de Información Subject: Incumplimiento de la Autoridad de Energía Eléctrica con Proveer Información | 16/septiembre/2020 | File |
Resolución y Orden Subject: Solicitud de Trato Confidencial a la Moción en Cumplimiento de Orden de 7 de agosto de 2020 | 13/agosto/2020 | File |
Presentación para Utilizar Durante Vista de Cumplimiento de 11 de agosto de 2020 Subject: Vista de Cumplimiento de 11 de agosto de 2020 | 07/agosto/2020 | File |
OIPC-Solicitud de Participación en la Vista de Cumplimiento a Celebrarse el 11 de agosto de 2020 Subject: Solicitud de Participación de la OIPC en Conferencia Técnica | 07/agosto/2020 | File |
Solicitud de Trato Confidencial a la Moción en Cumplimiento de Orden Subject: Solicitud de Trato Confidencial | 07/agosto/2020 | File |
Moción en Cumplimiento de Orden Subject: Presentación de Informes Trimestrales; Orden 21 de julio de 2020 | 07/agosto/2020 | File |
Resolución y Orden Subject: Presentación de Informes Trimestrales | 21/julio/2020 | File |
Motion for Leave to Submit Comments Subject: Submittal of Interconnection Progress Reports and Technical Conference | 03/junio/2020 | File |
AEE- Moción para Presentar Información en Cumplimiento de Orden Subject: Presentación de Información Requerida en Conferencia Técnica | 06/diciembre/2019 | File |
AEE- Moción para Presentar Información en Cumplimiento de Orden Subject: Anejo-Datos Energía Renovable | 06/diciembre/2019 | File |
AEE- Moción para Radicar Presentación a ser Utilizada en Conferencia Técnica No subject available. | 22/noviembre/2019 | File |
AEE-Moción Sometiendo Informe de Progreso de Interconexión Subject: Presentación de Informe de Progreso de Interconexión | 15/noviembre/2019 | File |
Resolución y Orden Subject: Presentación de Informe de Progresso de Interconexión y Recalendarización de Conferencia Técnica | 04/noviembre/2019 | File |
Nunc Pro Tunc Subject: Presentación de Informe y Conferencia Técnica | 09/septiembre/2019 | File |
Resolución y Orden Subject: Presentación de Informes y Conferencia Técnica | 05/septiembre/2019 | File |